Monterey County, California
Carmel-by-the-Sea is a city in Monterey County, California. Carmel-by-the-Sea adopts its own zoning, so inside its limits Carmel-by-the-Sea’s rules apply, not the county’s. 4 rules below are quoted from official sources and independently re-checked, most recently on October 22, 2026. Rules for unincorporated land are on the Monterey County page.
Construction, enlargement, alteration, repair, move, removal, improvement, conversion, remodel or demolition of buildings and structures inside Carmel-by-the-Sea city, administered by the city building official.
grading volume requiring permit: >= 50 cubic yards (grading of less than 50 cubic yards is not listed in this permit requirement)
“except as otherwise provided in this code, no person shall do any of the following without first obtaining from the building official a permit therefor”
All property inside the incorporated limits of Carmel-by-the-Sea city, administered by the city under its own zoning ordinance (Title 17, 'Carmel-by-the-Sea Zoning Ordinance and Coastal Zone Implementation Plan').
“this title shall apply, to the extent permitted by law, to all property in incorporated city of carmel-by-the-sea”
Residential zoning districts (R-1 and R-4) in Carmel-by-the-Sea city.
“schedule ii-1 land use regulations for residential districts p = permitted use l = limitations apply c = conditional use permit required r-1 r-4”
R-1 single-family residential district in Carmel-by-the-Sea city, interior and corner sites.
front setback, interior site: 15 feet · rear setback, interior site: 15 feet (3 feet for portions of structures less than 15 feet in height) · interior side setback: 3 feet · composite side setbacks (both sides): 25 percent of site width · street side setback, corner site: 5 feet
“interior site 15 15 25% of site width 3 n/a corner site 15 15 25% of site width 3 5 resubdivided corner site 10 15 25% of site width 3 9 double-frontage site 15 n/a 25% of site width 3 5 (if applicable) notes: * the rear setback is three feet for those portions of structures less than 15 feet in height.”
We looked and could not find an official answer yet. Silence is not permission; ask Carmel-by-the-Sea or Monterey County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Carmel-by-the-Sea publishes no rule on the point, not that none exists. Monterey County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Carmel-by-the-Sea means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.