Bolthole Index

Bay County, Florida

Building permits, zoning and septic rules in Springfield, Florida

Springfield, Florida requires a city Code Enforcement approval letter before obtaining building permits from its contracted builder’s service, E.P.C.I.1 Springfield applies its comprehensive plan and land-development regulations to manufactured-home placement, and prohibits camping on vacant property.23 In Bay County, state DEP oversees septic permitting, while Springfield also requires written city approval for its sewer-distance exception.45

At a glance

Building permits
City Code Enforcement approval letter first; E.P.C.I. is the contracted builder’s service1
Land-use approval
City comprehensive plan and land-development regulations apply to manufactured-home placement2
Septic permits
DEP oversight; written city permit also required for the sewer-distance exception45
Camping on vacant lots
Prohibited on public or private parcels without a primary structure3
Manufactured homes
City development authorization and preliminary point-of-sale inspection required; confirm building-permit routing21
Owner-builder
Conditional for a residence for the owner’s use; building permits and code compliance still apply6

Who to call

Building permits

Springfield Code Enforcement — Builders Services

City approval letter before building permits through contracted E.P.C.I.; starting contact for parcel development approval and current manufactured-home routing.

(850) 872-7570 ext.110 or ext.107

1121 Transmitter Rd Springfield, FL 32401

Zoning

Springfield Code Enforcement — Development Applications

City development, land-use change, lot-split, accessory-structure and driveway application contact.

(850) 872-7570

1121 Transmitter Rd

Septic permits

Florida Department of Environmental Protection — Onsite Sewage Program

State septic-system permitting for Bay County, including Springfield; program email for general septic questions and mailing address for applications.

OSTDS_Feedback@FloridaDEP.gov

2600 Blair Stone Road MS #3599 Tallahassee, FL 32399-2400

Online permits →

Contact details are copied from each office’s official page and were checked against it on October 11, 2026.

Off-grid gear

Going off-grid in Springfield means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Springfield, FL, and who issues it?

Start a Springfield building project with city Code Enforcement: Springfield contracts its builder’s services to E.P.C.I. Code Administrative Services, and requires a signed city approval letter before E.P.C.I. permits.1 Ask Code Enforcement to identify the approvals and application documents for your proposed home before submitting the building-permit package.1

Florida’s owner-builder exemption can let an owner act as contractor for a residence intended for the owner’s use, with direct onsite supervision and other statutory conditions; the exemption does not remove building-permit or code-compliance requirements.6 Springfield’s manufactured-home code instead names a city development authorization followed by a county building-division permit, so ask the city to confirm that specific route before purchasing a manufactured home.21

Does Springfield have zoning, and what should you ask about your lot?

Springfield’s manufactured-home placement criteria expressly include the city comprehensive plan and land-development regulations; city development approval is part of that process.2 Springfield’s application page also lists land-use changes, accessory structures and lot splits requiring City Commission approval with fees involved.7

Before buying, ask Springfield Code Enforcement for the parcel’s zoning district and written confirmation of the proposed residential use.7 We could not confirm Springfield’s district-specific minimum lot size, setbacks, lot coverage, building height or minimum dwelling size; request those dimensions for the actual parcel from the city development contact.7 An accessory-structures application is listed, but we could not confirm whether Springfield allows an accessory dwelling unit on your lot.7

How do septic permits and sewer connections work inside Springfield?

Springfield requires qualifying occupied properties to connect to public sewer in an abutting street, alley or right-of-way at the owner’s expense, following written city notice.8 Springfield’s exception for sewer more than 100 feet from the property line allows septic use subject to a written city permit obtained before septic construction.5

DEP oversees septic permitting in Springfield and Bay County, even though Springfield’s code still names the state health department for approval and inspection.49 A DEP septic application includes the application form, site plan, building floor plan and a site evaluation assessing soil, topography and other conditions.10 Springfield requires septic tanks and drainlines to be inspected before covering, so coordinate the inspection with the current permitting authority.9 City sewer approval and state septic approval are separate parts of planning sanitation.85

Can you live in an RV or tiny home on land in Springfield?

Springfield prohibits camping, occupying camp facilities, and using or storing camp paraphernalia on public or private vacant property; vacant property means a parcel without a primary structure.3 Do not plan vacant-lot camping as your accommodation while building a Springfield home.3

We could not confirm a Springfield tiny-home occupancy rule; ask city Code Enforcement to review the proposed structure and residential use before buying the unit.1 A manufactured home has a separate city development-authorization process and preliminary point-of-sale inspection before placement.2 Florida also requires onsite installation inspection and a certificate of occupancy for a compliant manufactured or mobile home.11 Ask the city to distinguish your proposed RV, tiny home or manufactured home rather than assuming the same approval applies.1

Building a home in Springfield: what are the steps, in order?

  1. Ask Springfield Code Enforcement to review the proposed development and identify the city approval letter needed before E.P.C.I. building permits.1
  2. Resolve sewer service with Springfield; if relying on the sewer-distance septic exception, obtain the written city septic permit before construction.85
  3. For septic service, prepare the DEP application, site plan and building floor plan, and arrange the site evaluation.10
  4. Obtain the city approval letter before applying for E.P.C.I. building permits; confirm the separate route stated in city code if placing a manufactured home.12
  5. For development subject to Springfield flood regulations, submit scaled plans showing applicable flood hazard areas, floodway boundaries, flood zones, base flood elevations and ground elevations.12
  6. Arrange septic inspection before covering the tank or drainlines.9

What should you check before buying land in Springfield or Bay County?

For a Springfield parcel in a designated flood hazard area, city flood-review documents must show the relevant flood boundaries and elevations; filling, grading, excavation or watercourse changes can require additional information.12 Ask Springfield’s development contact about the parcel’s driveway and right-of-way applications, which the city lists among its forms.7 We could not confirm private-well requirements inside Springfield; ask the city development contact which well authority must review the proposal.7

For land outside Springfield, use the Bay County guide: Bay County’s building-permit rules apply to unincorporated land, rather than substituting for Springfield’s approval process.131 DEP septic permitting remains relevant to property in Bay County, including Springfield.4

Watch-outs

  • Springfield prohibits camping on vacant property, including privately owned lots without a primary structure.3
  • Springfield’s manufactured-home code names a subsequent county building-division permit, while the city’s Builders Services page identifies E.P.C.I.; confirm current routing with city Code Enforcement.21
  • Springfield’s sewer-distance exception requires written city approval before septic construction, in addition to the state septic permitting process.54

Sources

  1. Springfield Code Enforcement — Builders Services (springfieldfl.net)
  2. Springfield Code of Ordinances, Sec. 46-34—Permit required (Springfield), quoted and re-checked
  3. Sec. 50-7. Restrictions on camping and unauthorized occupancy (Springfield), quoted and re-checked
  4. Onsite Sewage Treatment and Disposal System (Springfield), quoted and re-checked
  5. Sec. 82-157. Exceptions to mandatory connection requirements (Springfield), quoted and re-checked
  6. 2026 Florida Statutes § 489.103, Exemptions (Florida statewide rule), quoted and re-checked
  7. Springfield Code Enforcement — Development Applications (springfieldfl.net)
  8. Sec. 82-154. Owners required to install suitable toilet facilities; connection with public sewer (Springfield), quoted and re-checked
  9. Sec. 82-131. Sewer connections and septic tanks (Springfield), quoted and re-checked
  10. Onsite Sewage FAQ - Permitting, quoted and re-checked
  11. Florida Statutes § 320.8285: Onsite inspection (Florida statewide rule), quoted and re-checked
  12. Sec. 30-31. Information for development in flood hazard areas (Springfield), quoted and re-checked
  13. Permits (2026 county census)

Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Springfield

Springfield’s own rules

  • Building permitLimited

    Placement, installation, location, or setup of a mobile or manufactured home intended for residential occupancy inside Springfield city.

    • A development permit authorization from city hall is required first.
    • A subsequent mobile home/manufactured home permit from the county building division is required.
    • The permits are subject to city comprehensive-plan/land-development criteria and F.A.C. chapters 15C-1 and 15C-2.
    “No person shall place, install, locate or set up any mobile home or manufactured home intended for residential occupancy on any lot or parcel of land including mobile home parks, without first obtaining a development permit authorization from city hall and a subsequent mobile home/manufactured home permit from the county building division.”
  • Owner-builder exemptionConditional

    House connections with a septic tank on an owner's own property inside Springfield city.

    • The septic tank must be approved by the state department of health.
    • The septic tank and drainlines must be inspected by the state department of health before being covered.
    • The owner-work allowance is limited to the person's own property.
    “All house connections with this tank must be installed by a licensed plumber; provided, however, that any person may do his own work on his own property.”
  • InspectionsLimited

    Manufactured homes installed or replaced in Springfield flood hazard areas.

    • The inspection determines compliance with Chapter 30 and the issued-permit conditions.
    • Upon placement, certification of lowest-floor elevation must be submitted to the floodplain administrator.
    “The floodplain administrator shall inspect manufactured homes that are installed or replaced in flood hazard areas to determine compliance with the requirements of this chapter and the conditions of the issued permit.”
  • Local zoningPresent (with conditions)

    Land development review for mobile and manufactured homes inside Springfield city.

    • Permits are granted or denied under the city comprehensive plan/land development regulations and F.A.C. chapters 15C-1 and 15C-2.
    “Such permits shall be granted or denied based upon criteria and standards set forth in both the city comprehensive plan/land development regulations and those contained in F.A.C. chs. 15C-1, 15C-2.”
  • Camping on your landProhibited

    Camping and storage or use of camp facilities or camp paraphernalia on public or private vacant property inside Springfield city limits.

    • The prohibition applies to vacant property.
    • Section 50-7 separately prohibits unauthorized occupancy of property the city deems an unfit or unsafe dwelling or structure.
    “It shall be unlawful for any person to camp, occupy camp facilities, use, or store camp paraphernalia on any public or private vacant property within the city limits of Springfield.”
    One more reviewed finding on this topic
    • Prohibited — Camping, camp facilities, or camp paraphernalia on public or private vacant property within Springfield city limits.
      “It shall be unlawful for any person to camp, occupy camp facilities, use, or store camp paraphernalia”
  • Manufactured homesLimited

    Mobile and manufactured homes intended for residential occupancy inside Springfield city.

    • City hall development-permit authorization is required before a county building-division mobile/manufactured-home permit.
    • Permits are subject to city comprehensive-plan/land-development criteria and F.A.C. chapters 15C-1 and 15C-2.
    “No person shall place, install, locate or set up any mobile home or manufactured home intended for residential occupancy on any lot or parcel of land including mobile home parks, without first obtaining a development permit authorization from city hall and a subsequent mobile home/manufactured home permit from the county building division.”
  • Septic permitRequired

    Construction of a septic tank within the sewer-connection exception inside Springfield city.

    • The exception applies only where public sewer is more than 100 feet from the property line of an owner utilizing a septic tank.
    • Before septic-tank construction, the owner must obtain a written city permit finding the exception applies and septic use is permissible.

    public sewer distance from property line: > 100 feet (Exception applies only to an owner utilizing a septic tank.)

    “No connections shall be required where the public sewer is more than 100 feet from the property line of an owner utilizing a septic tank. Before commencement of construction of a septic tank, the owner shall first obtain a written permit from the city that finds that the use of a septic tank is within this exception and is permissible.”
  • Off-grid sanitationLimited

    Sewage disposal where a city sewer is unavailable inside Springfield city.

    • When sewer is unavailable, a septic tank must be used.
    • The state department of health must approve the tank and inspect the tank and drainlines before covering.
    • For the sewer-distance exception, the city must issue a written permit before septic-tank construction.
    “When a sewer is not available, a septic tank must be used. Such septic tank shall be approved by the state department of health.”
    One more reviewed finding on this topic
    • Limited — Private septic or other sewage-disposal facilities inside Springfield city limits.
      “it shall be unlawful to construct or maintain a septic tank, private sewer system utility, or other facility intended or used for sewage disposal”
  • Mandatory utility hookupSewer (with conditions)

    Properties used for human occupancy or other listed purposes inside Springfield city limits when a public sanitary or combined sewer is located in or may be located in the abutting street, alley, or right-of-way.

    • Connection is at the owner’s expense.
    • The city gives written notice and specifies the connection period.
    • No connection is required where public sewer is more than 100 feet from the property line and the owner uses a septic tank, subject to a written city permit.
    • A qualifying existing private sewer utility is an additional exception.

    sewer-distance exception: > 100 feet (Public sewer more than 100 feet from property line; septic-tank use and written city permit required.)

    “is hereby required at his expense to install suitable toilet facilities therein, and to connect such facilities directly with the proper public sewer”
    One more reviewed finding on this topic
    • Sewer (with conditions) — Houses, buildings, and properties used for human occupancy, employment, recreation, or other purposes inside Springfield city that abut a street, alley, or right-of-way containing a city public sanitary or combined sewer.
      “The owner of all houses, buildings or properties used for human occupancy, employment, recreation or other purposes, situated within the city and abutting on any street, alley or right-of-way in which there is now located or may in the future be located a public sanitary or combined sewer of the city, is hereby required at his expense to install suitable toilet facilities therein, and to connect such facilities directly with the proper public sewer in accordance with the provisions of this division, within the time period specified by written notice from the city to do so.”
  • Subdividing landRegulated (with conditions)

    Lot splits and related land-development activity inside Springfield city limits.

    • The city website provides a Lot Split Application and a Lot Split Application requiring City Commission approval with fees involved.
    • The exact subdivision ordinance and thresholds were not opened.
    “Lot Split Application (Requires City Commission Approval) Fees Involved”
  • Building in a floodplainRequired

    Development subject to Springfield Chapter 30 flood-resistant-development requirements.

    • Site plans or construction documents must be drawn to scale.
    • Required information applies as applicable to the proposed development.
    • The floodplain administrator may waive submissions not required to be prepared by a registered design professional when review is unnecessary to ascertain compliance.
    “The site plan or construction documents for any development subject to the requirements of this chapter shall be drawn to scale and shall include, as applicable to the proposed development: (1) Delineation of flood hazard areas, floodway boundaries and flood zone(s), base flood elevation(s), and ground elevations if necessary for review of the proposed development.”
    One more reviewed finding on this topic
    • Required — Development subject to Springfield’s flood regulations inside designated flood hazard areas.
      “The site plan or construction documents for any development subject to the requirements of this chapter shall be drawn to scale”
  • Permit processPartial

    Mobile and manufactured-home placement inside Springfield city.

    • The city authorization must precede the county building-division permit.
    • The process is limited to mobile/manufactured homes and does not establish a general residential permit process.
    “No person shall place, install, locate or set up any mobile home or manufactured home intended for residential occupancy on any lot or parcel of land including mobile home parks, without first obtaining a development permit authorization from city hall and a subsequent mobile home/manufactured home permit from the county building division.”

Rules another office applies inside Springfield

Springfield does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Who permits septicState (with conditions)

    Septic tanks and drainlines where sewer is unavailable inside Springfield city.

    • The state department of health must approve the septic tank.
    • The state department of health must inspect the septic tank and drainlines before they are covered.
    “Such septic tank shall be approved by the state department of health. Such septic tank and drainlines must be inspected by the state department of health before being covered up.”
    One more reviewed finding on this topic
    • State — Septic-system permitting in Springfield city and Bay County.
      “Effective Thursday, January 2, 2025, the Florida Department of Environmental Protection will oversee septic system permitting in Bay County.”
  • Septic inspectionRequired

    Septic tanks and drainlines installed inside Springfield city limits.

    • Inspection must occur before covering the tank and drainlines.
    • The city-code excerpt names the state department of health; current Bay County program oversight moved to DEP effective January 2, 2025.
    • Private-provider inspections may be available under Florida law.
    “Such septic tank and drainlines must be inspected by the state department of health before being covered up.”
    One more reviewed finding on this topic

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Springfield or Bay County directly.

  • Building code adopted — Building-code adoption for construction inside Springfield city.
  • Certificate of occupancy — Residential construction inside Springfield city.
  • Zoning districts — Springfield city zoning districts.
  • Minimum dwelling size — Residential districts inside Springfield city limits.
  • Minimum lot size — Residential and agricultural districts inside Springfield city limits.
10 more unanswered
  • Setbacks
  • Lot coverage
  • Building height
  • Tiny homes
  • Accessory dwellings
  • Well permit
  • Agricultural exemption
  • Driveway access
  • Short-term rentals
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Springfield publishes no rule on the point, not that none exists. Bay County’s page lists the county offices to call.

← All of Bay County: county rules, score and offices