Bolthole Index

Lake County, Illinois

Zoning, building permits and septic rules in Highland Park, Illinois

Highland Park is a city in Lake County, Illinois. Highland Park adopts its own zoning, so inside its limits Highland Park’s rules apply, not the county’s. 5 rules below are quoted from official sources and independently re-checked, most recently on October 16, 2026. Rules for unincorporated land are on the Lake County page.

Answers from the rulebook for Highland Park

Highland Park’s own rules

  • Local zoningPresent

    All land inside Highland Park city limits; the city adopts and administers its own zoning code (Chapter 150)

    “the table below specifies the general minimum and maximum requirements of area, bulk, yards, and density for the low density residential zoning districts.”
  • Minimum lot sizeDistrict specific (with conditions)

    Single-family lots in Highland Park city low density residential districts R1, R2, R3, R4, R5, R5A, R6, R7 (in that order)

    • Footnote (a): LFOZ Overlay Zone subdivisions must comply with Sec. 150.703.1 (R4 column)
    • Footnote (b): SLOZ Overlay Zone lots must comply with Sec. 150.703.2 (R6 column)
    • Requirements may be modified as permitted elsewhere in the Chapter

    R1 min area single-family: >= 130680 sq ft · R2: >= 80000 sq ft · R3: >= 40000 sq ft · R4: >= 20000 sq ft (footnote (a)) · R5: >= 12000 sq ft · R5A: >= 10000 sq ft · R6: >= 7260 sq ft (footnote (b)) · R7: >= 7000 sq ft

    “minimum area for single-family residence 130,680 sq. ft. 80,000 sq. ft. 40,000 sq. ft. 20,000 sq. ft.(a) 12,000 sq. ft. 10,000 sq. ft. 7,260 sq. ft.(b) 7,000 sq. ft.”
  • SetbacksDistrict specific (with conditions)

    Front yards in Highland Park city districts R1, R2, R3, R4, R5, R5A, R6, R7 (in that order); side and rear yards vary by district in the same table

    • Side yards: total of all side yards a minimum percentage of lot width (30% in R3, 25% in R5-R7 columns) with minimum single side yards from 15 ft down to 6 ft; R1 50 ft and R2 25 ft
    • Rear yard: whichever is less of a fixed distance or 20% of lot depth (R1 50 ft)
    • No air conditioning units installed after June 29, 2004 in required front or rear yard

    R1 front yard: >= 50 ft · R2 front yard: >= 50 ft · R3-R5 front yard: >= 40 ft · R5A-R7 front yard: >= 25 ft

    “minimum front yard 50 ft. 50 ft. 40 ft. 40 ft. 40 ft. 25 ft. 25 ft. 25 ft.”
  • Lot coverageDistrict specific (with conditions)

    Highland Park city RM1, RM1A, RM2, RO (33.3%) and HC (70.0%) districts; R1-R7 use floor area ratio per Sec. 150.703.3, not opened

    • Requirements may be modified as permitted elsewhere in the Chapter
    • HC district master site plan may modify bulk regulations

    RM1/RM1A/RM2/RO max lot coverage: <= 33.3 % · HC max lot coverage: <= 70 %

    “maximum lot coverage % 33.3 33.3 33.3 33.3 70.0”
  • Building heightDistrict specific (with conditions)

    Principal structures in Highland Park city districts R1, R2, R3, R4, R5, R5A, R6, R7 (in that order); accessory structures 18 ft in all

    • Requirements may be modified as permitted elsewhere in the Chapter

    R1-R3 principal max height: <= 35 ft · R4-R5 principal max height: <= 32 ft · R5A-R7 principal max height: <= 30 ft · accessory max height: <= 18 ft

    “maximum height of principal structure 35 ft. 35 ft. 35 ft. 32 ft. 32 ft. 30 ft. 30 ft. 30 ft.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Highland Park or Lake County directly.

  • Building permit — Building permits inside Highland Park city
  • Owner-builder exemption — Owner-builder exemption inside Highland Park city
  • Inspections — Building inspections inside Highland Park city
  • Certificate of occupancy — Certificates of occupancy inside Highland Park city
  • Minimum dwelling size — Minimum dwelling size inside Highland Park city
18 more unanswered
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals
  • Permit fees
  • Permit process

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Highland Park publishes no rule on the point, not that none exists. Lake County’s page lists the county offices to call.

Off-grid gear

Going off-grid in Highland Park means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

← All of Lake County: county rules, score and offices