Washtenaw County, Michigan
Scio Township is a township in Washtenaw County, Michigan. 9 rules below are quoted from official sources and independently re-checked, most recently on October 18, 2026. Rules for unincorporated land are on the Washtenaw County page.
Dwelling-unit construction inside Scio Township.
“All construction shall be commenced only after a building permit has been obtained in accordance with the applicable Michigan State Construction Code provisions and requirements.”
State-construction-code responsibilities within Scio Township corporate limits.
“The Washtenaw County Building Department through said intergovernmental agreement assumes responsibility for the administration and enforcement of said act throughout the corporate limits of Scio Township.”
Temporary campgrounds inside Scio Township.
“Temporary campgrounds are strictly prohibited.”
Mobile homes used as dwelling units inside Scio Township, except a mobile home in a licensed mobile-home park as stated in the ordinance.
“If the dwelling is a mobile home, as defined herein, such dwelling and any addition shall be installed pursuant to the manufacturer's instructions and shall be secured to the premises by an anchoring system or device complying with the rules and regulations of the state mobile home commission and shall have a perimeter wall as required above.”
Dwelling units inside Scio Township using on-site water or sanitary sewerage facilities.
“Each dwelling unit shall be connected to public water and sanitary sewer lines, or to on-site water and sanitary sewerage facilities approved by the county health department.”
A premises abutting the Township water system inside Scio Township.
“Each premises abutting the system within the township whose private water well becomes inoperative and/or contaminated, or each new structure, other than sheds, residential garages, and/or additions to existing structures with existing private water wells, shall be required to connect to the system by the provisions of this article.”
Subdivision plats inside Scio Township.
preliminary plat filing lead time: >= 30 days (before the regular Planning Commission meeting at which the plat is considered)
“The proprietor shall file six copies of the preliminary plat together with a completed application form, plat review fees, and the required information with the township clerk at least 30 days prior to the regular planning commission meeting at which the plat is to be considered.”
Subdivision preliminary-plat process inside Scio Township.
preliminary plat copies: 6 copies
“The proprietor shall file six copies of the preliminary plat together with a completed application form, plat review fees, and the required information with the township clerk at least 30 days prior to the regular planning commission meeting at which the plat is to be considered.”
Scio Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Accessory dwelling units in the R-C, A-1, E-R, R-1, R-2, and R-3 zoning districts inside Scio Township.
maximum ADU area: <= 1000 square feet · ADUs per lot or parcel: 1
“Accessory dwelling units shall be a permitted land use in the R-C, A-1, E-R, R-1, R-2 and R-3 zoning districts.”
We looked and could not find an official answer yet. Silence is not permission; ask Scio Township or Washtenaw County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Scio Township publishes no rule on the point, not that none exists. Washtenaw County’s page lists the county offices to call.