Bolthole Index

Ramsey County, Minnesota

Zoning, building permits and septic rules in White Bear Township, Minnesota

White Bear Township is a township in Ramsey County, Minnesota. White Bear Township adopts its own zoning, so inside its limits White Bear Township’s rules apply, not the county’s. 8 rules below are quoted from official sources and independently re-checked, most recently on October 18, 2026. Rules for unincorporated land are on the Ramsey County page.

Answers from the rulebook for White Bear Township

White Bear Township’s own rules

  • Building code adoptedAdopted (with conditions)

    Work governed by the building code inside White Bear Township.

    • Optional chapters are excepted unless specifically adopted in the ordinance.
    • The Township Building Official is the code-enforcement agency.
    “The Minnesota State Building Code, as adopted by the Commissioner of Labor and Industry pursuant to Minnesota Statutes, Chapter 326B, including all of the amendments, rules and regulations established, adopted and published from time to time by the Minnesota Commissioner of Labor and Industry, through the Building Codes and Standards Unit, is hereby adopted by reference with the exception of the optional chapters, unless specifically adopted in this Ordinance.”
  • InspectionsRequired

    Construction and structures regulated by White Bear Township's building code.

    • The Building Inspector examines a permit site before issuance and makes necessary inspections for legal compliance and safe construction.
    “He shall make necessary inspection to see that the provisions of law are complied with and that construction is prosecuted safely.”
  • Certificate of occupancyRequired

    Buildings or structures covered by Ordinance No. 8 inside White Bear Township.

    • The ordinance labels this approval an occupancy permit.
    “No building or structure hereafter erected, structurally altered or moved shall be occupied or used in whole or in part for any purpose whatsoever until a certificate of occupancy shall have been issued by the Code Enforcement Officer of the Town of White Bear stating that the building or structure complies with all pertinent provisions of the Town Zoning Ordinance and the State Building Code.”
  • Local zoningPresent (with conditions)

    Land inside White Bear Township, Minnesota.

    • The Planning Department administers zoning; land-use approvals and district regulations apply.
    “The activities include, but are not limited to, comprehensive planning, zoning administration, design of trails and bike-ways, and code compliance.”
  • Minimum dwelling sizeSpecified

    Every dwelling house erected inside White Bear Township.

    • House trailers, basements, and other nonconforming structures may not be permanent dwellings.
    • Temporary use of such a structure requires a special permit if allowed elsewhere in the building ordinance.
    “Every dwelling house hereafter erected shall have at least three [...] House trailers, basements or any other structure not conforming with the foregoing requirements shall not be used for a permanent dwelling place and shall not be used for a temporary dwelling place unless allowed by a special permit as elsewhere provided for in this Ordinance.”
  • Living in an RVLimited

    Use of a house trailer as a dwelling inside White Bear Township.

    • A house trailer may not be used as a permanent dwelling.
    • Temporary dwelling use requires a special permit if allowed elsewhere in the building ordinance.
    “House trailers, basements or any other structure not conforming with the foregoing requirements shall not be used for a permanent dwelling place and shall not be used for a temporary dwelling place unless allowed by a special permit as elsewhere provided for in this Ordinance.”
  • Mandatory utility hookupConditional

    A property connecting to the White Bear Township water system.

    • A connection charge based on units must be paid before a Town-water connection.
    • Additional charges apply if additional building permits or new water connections are made after initial connection charges.
    • The reviewed passage does not establish a mandatory-availability distance or a sewer-connection mandate.
    “Before connecting to the Town water system a utility connection charge based on the number of “units” shall be paid. If, after the initial connection charges are paid, additional building permits or new water connections are made, additional charges shall be paid.”
  • Permit processPublished (with conditions)

    Building-code permit applications inside White Bear Township.

    • Applications are received by the Building Inspector.
    • The inspector examines the site before issuance and determines whether the proposed use complies with the code, zoning ordinance, and other regulations.
    “He shall receive applications required by this code, issue permits and supervise or perform all office work incidental to his position. He shall examine the premises for which permits have been requested prior to the issuance of such permit and shall satisfy himself that the said premises can be used for the purpose for which a permit is requested in accordance with all of the provisions of this code, the Zoning Ordinance and all other rules, regulations or ordinances.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask White Bear Township or Ramsey County directly.

  • Owner-builder exemption — Owner-built residential construction inside White Bear Township.
  • Minimum lot size — Residential zoning districts inside White Bear Township.
  • Setbacks — Residential zoning districts inside White Bear Township.
  • Lot coverage — Land inside White Bear Township.
  • Building height — Land inside White Bear Township.
12 more unanswered
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Agricultural exemption
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that White Bear Township publishes no rule on the point, not that none exists. Ramsey County’s page lists the county offices to call.

Off-grid gear

Going off-grid in White Bear Township means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

← All of Ramsey County: county rules, score and offices