New Richland is a city in Waseca County, Minnesota. New Richland adopts its own zoning, so inside its limits New Richland’s rules apply, not the county’s. 4 rules below are quoted from official sources and independently re-checked, most recently on October 23, 2026. Rules for unincorporated land are on the Waseca County page.

Answers from the rulebook for New Richland

New Richland’s own rules

  • Building permitRequired

    New construction and alterations inside New Richland city limits (city building permit)

    • Work started without a permit is subject to double permit fees, per the city building permit page.
    • The city page also lists building permits for other work types subject to flat fees (air conditioning, decks, demolition, fireplaces, water heaters, furnaces, re-roofs, residing, retaining walls over 4 feet, plumbing, windows, doors, fencing over 6 feet, and others).
    • The city requires a building permit application to be submitted before work begins; the page does not state a specific permit threshold for minor work.
    “a building permit application is required to be submitted prior to beginning work.”
  • Local zoningPresent (with conditions)

    Land inside New Richland city limits: the city's own zoning ordinance and zoning map, adopted by the city council by reference

    • The adoption date in section 152.01 (public hearing on February 26, 2001) is a hearing date, not a stated effective date, so effective_at is null.
    • The zoning ordinance text with district standards is not in the online code; the city's building permit page says setback requirements may be reviewed in the zoning ordinance kept at City Hall.
    • The city's zoning permit is required for utility sheds up to 12x10 and fences 6 feet high and below, per the building permit page.
    • Code is shown as current through local legislation Ord. No. 25-02, passed 8-11-2025, with a disclaimer that it may not reflect the most recent legislation.
    “the city council adopts the zoning ordinance and zoning map as presented during the public hearing on february 26, 2001, by reference, as if fully set forth”
  • Permit feesPublished (with conditions)

    Building and zoning permit fees for work inside New Richland city limits

    • Fees for new construction, alterations, decks and utility sheds (larger than 12 x 10) are based on the value of the job.
    • Flat fees include a $1.00 state surcharge and $5.00 city surcharge on listed items (per the page's column headings).
    • Plan review: residential 35% of city fee schedule; commercial 65% of city fee schedule. Refunds: 75% of permit fee only. Reactivate expired permit: 50% of permit fee. Investigation fee (penalty): up to double permit fee.
    • Utility sheds up to 12x10 and fences 6 feet and below need a zoning permit at $35.00.
    • The complete fee schedule PDF is linked as 'updated 7/15/25'; that is a revision stamp, not an effective date, so effective_at is null. The schedule PDF was not opened.

    re-inspection fee: 50 USD · zoning permit fee (utility sheds up to 12x10, fences 6 ft and below): 35 USD · site inspection fee: 65 USD per hour (drive time included) · residential plan review fee: 35 percent of city fee schedule

    “the following are subject to a zoning permit and a fee of $35.00 utility sheds (up to 12x10) fences (6' high and below) zoning permit application”
  • Permit processPartial

    Building permit process for work inside New Richland city limits

    • Application forms are linked on the city page: building permit application, plumbing/mechanical permit application, and demolition permit application.
    • Work started without a permit is subject to double permit fees.
    • Inspection and permit questions go to Prokore Inspection Services at 507-388-4224, per the city page.
    • Plan review timing, inspection scheduling and approval steps are not stated on the page.
    “a building permit application is required to be submitted prior to beginning work.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask New Richland or Waseca County directly.

  • Owner-builder exemption — Owner-builder permit exemption inside New Richland city limits
  • Building code adopted — Building code applied to construction inside New Richland city limits
  • Certificate of occupancy — New dwelling occupancy inside New Richland city limits
  • Zoning districts — Zoning district map and district list for New Richland city
  • Minimum dwelling size — Main single-family residential district inside New Richland city limits (district name not confirmed)
20 more unanswered
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that New Richland publishes no rule on the point, not that none exists. Waseca County’s page lists the county offices to call.

Off-grid gear

Going off-grid in New Richland means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

← All of Waseca County: county rules, score and offices