Building anything in the Borough of Little Ferry, Bergen County, New Jersey requires a construction permit from the borough's own building department, which enforces the State Uniform Construction Code12. Zoning is set by the borough, not Bergen County34. Septic and well questions are handled by a health department, not the building department, and the borough contracts with Bergen County for health services5.
At a glance
- Building permit
- Required; issued by the Little Ferry building department16
- Zoning
- Set by the borough's combined planning/zoning board and ordinances, not by Bergen County34
- Septic
- Needs board of health approval before a building permit; the borough contracts with Bergen County for health services75
- Owner-builder
- Owner may skip builder registration but still needs permits and a certificate-of-occupancy affidavit89
- Floodplain
- Borough floodplain regulations apply alongside the construction code10
- Minimum home size and lot size
- Set by borough zoning district; we could not confirm the numbers11
Who to call
Building permits
Little Ferry Building Department
Construction permits and inspections under the State Uniform Construction Code, plus zoning and other code enforcement inside the borough
215-217 Liberty St, Little Ferry, NJ 07643
Zoning
Little Ferry Planning and Zoning Board
Variance applications and enforcement of the borough's zoning ordinances
215-217 Liberty St, Little Ferry, NJ 07643
Health department
Local board of health; the borough contracts with Bergen County for health services
215-217 Liberty St, Little Ferry, NJ 07643
Septic permits
Bergen County Department of Health Services
County health office that reviews septic engineering plans for municipalities that contract with it; confirm with the borough that it covers your parcel
One Bergen County Plaza, 4th Floor, Hackensack, NJ 07601-7076
Contact details are copied from each office’s official page and were checked against it on October 13, 2026.
Off-grid gear
Going off-grid in Borough of Little Ferry means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Little Ferry, NJ?
Yes. New Jersey's Uniform Construction Code requires a construction permit for new construction and for work on existing buildings, including structural, plumbing, mechanical and electrical work; ordinary maintenance such as routine repair is excepted6. Inside the Borough of Little Ferry the code is enforced by the borough's own enforcing agency1.
A complete application must be approved or denied within 20 business days6. The permit does not issue until every required state, county and local approval is in place12.
Who issues building permits in Little Ferry, and how do you reach them?
The Little Ferry Building Department handles building permits. The borough describes it as administering and enforcing zoning, building and other codes, and as enforcing the New Jersey State Uniform Building Code2. Borough Hall is at 215-217 Liberty St, Little Ferry, NJ 07643, phone 201.641.92342.
Bergen County does not issue building permits for a house in Little Ferry. Permits come through the municipal construction official13.
Does Little Ferry have zoning, and what does it mean for lot size, setbacks and RVs?
Little Ferry zones its own land. Bergen County has no zoning power over municipal land use, because New Jersey gives that authority to municipalities3. The borough's combined planning and zoning board reviews variance applications and enforces the borough's zoning ordinances4.
Minimum lot size, setbacks, building height and minimum floor area vary by zoning district in New Jersey1415. We could not confirm Little Ferry's numbers or its rules on RV, tiny-home or accessory-dwelling occupancy, so ask the building department for your parcel's district before you buy. Portions of the Hackensack Meadowlands District inside Little Ferry fall under regional planning and zoning by the NJSEA16, so check whether a parcel sits in that district.
How do septic permits work in Little Ferry?
Septic is a health-department matter, not a building-department one. New Jersey requires the board of health with jurisdiction to certify the sewerage facilities before any building permit is issued7, and a septic system may not be covered until a board of health representative has inspected it17.
The Little Ferry Board of Health says the borough contracts with Bergen County for health services5. County Health Services reviews septic engineering plans for contracting towns18. We could not confirm the septic rules for a specific Little Ferry lot, so call the Bergen County Department of Health Services19 and the borough clerk before you rely on a septic or well plan.
Building a home in Little Ferry: the steps, in order
- Ask the Little Ferry Building Department which zoning district the parcel is in and whether a variance would be needed24.
- Check floodplain exposure; the borough's floodplain regulations apply together with the Uniform Construction Code10.
- Get health-department approval for any septic or well plan, since the construction permit cannot issue without it7.
- File the construction permit application with the borough construction official6.
- Pass inspections at the required stages, including footings, rough plumbing and electrical, and framing20.
- Obtain the certificate of occupancy; the building must be properly numbered and identified first21. An owner who built the home must also file an affidavit with the construction official9.
What stays with Bergen County and the state in Little Ferry?
Subdivisions are submitted to the Bergen County Planning Board for review, with county approval limited to those that touch a county road, county drainage facility or county-owned land22. A driveway onto a county road carries a $250 road-access permit fee when it is not subject to site plan approval or exemption23. A driveway onto a state highway needs a state access permit24.
For land outside Little Ferry, see the Bergen County page.
Watch-outs
- Owner-builders in New Jersey are excepted from builder registration only; they still need construction permits and must file an affidavit before a certificate of occupancy is issued89.
- Part of Little Ferry lies in the Hackensack Meadowlands District, where the NJSEA handles regional planning and zoning, so confirm which agency governs a given parcel16.
- Bergen County Health Services serves only about 30 contracting towns, so confirm with the Little Ferry Board of Health which office handles septic and well approvals for your parcel18.
- Lot size, setbacks, height and minimum floor area are set district by district in New Jersey14; Little Ferry's own numbers and its RV and tiny-home rules were not confirmed, so ask the building department before you buy.
Sources
- Chapter 13: Building and Construction (Borough of Little Ferry), quoted and re-checked
- Little Ferry Building Department (littleferrynj.org)
- Bergen County Standards for Sustainable Land Development—Site Plans, quoted and re-checked
- Little Ferry Planning and Zoning Board (littleferrynj.org)
- Little Ferry Board of Health (littleferrynj.org)
- Uniform Construction Code General Information, quoted and re-checked
- New Jersey Statutes, R.S. 58:11-23 through 58:11-43 (New Jersey statewide rule), quoted and re-checked
- Builder Registration and New Home Warranty for Builders, quoted and re-checked
- N.J.A.C. 5:23, Uniform Construction Code (New Jersey statewide rule), quoted and re-checked
- Chapter 25: Flood Prevention and Protection (Borough of Little Ferry), quoted and re-checked
- P.L. 2013, c.106 (Municipal Land Use Law amendments) (New Jersey statewide rule), quoted and re-checked
- New Jersey Uniform Construction Code, N.J.A.C. 5:23 (New Jersey statewide rule), quoted and re-checked
- The New Jersey State Uniform Construction Code, quoted and re-checked
- P.L. 2013, c.106 (Municipal Land Use Law amendments) (New Jersey statewide rule), quoted and re-checked
- P.L. 2013, c.106 (Municipal Land Use Law amendments) (New Jersey statewide rule), quoted and re-checked
- Bergen County Master Plan: Public Facilities and Services, quoted and re-checked
- New Jersey Statutes, R.S. 58:11-23 through 58:11-43 (New Jersey statewide rule), quoted and re-checked
- bergencountynj.gov, quoted and re-checked
- Bergen County Department of Health Services (bergencountynj.gov)
- New Jersey Department of Community Affairs, New Home Warranty—Consumer Information (New Jersey statewide rule), quoted and re-checked
- Chapter 13: Building and Construction (Borough of Little Ferry), quoted and re-checked
- Bergen County Standards for Sustainable Land Development—Subdivisions, quoted and re-checked
- Fee Schedule for Site Plan Application, quoted and re-checked
- Major Access Permits (New Jersey statewide rule), quoted and re-checked
Written October 13, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.