Bolthole Index

Burlington County, New Jersey

Zoning, building permits and septic rules in Maple Shade Township, New Jersey

Maple Shade Township is a township in Burlington County, New Jersey. Maple Shade Township adopts its own zoning, so inside its limits Maple Shade Township’s rules apply, not the county’s. 8 rules below are quoted from official sources and independently re-checked, most recently on October 23, 2026. Rules for unincorporated land are on the Burlington County page.

Answers from the rulebook for Maple Shade Township

Maple Shade Township’s own rules

  • Local zoningPresent (with conditions)

    All land inside Maple Shade township limits, where the township's own Chapter 205 Zoning ordinance applies.

    • Chapter 205 was adopted by the township council on 12-6-2000 and its section headings show amendments through 3-13-2026 (Ord. No. 2026-05).
    “chapter 205 zoning (§ 205-1 – § 205-125)”
  • Zoning districtsPartial

    Zoning districts of Maple Shade township inside its limits.

    • The text divides the township into nine classes of districts (RA, R-1, R-2, DB, C, BD, BD-1, HC, LHC, PD, R-AH as listed in § 205-5), but the zoning map itself is incorporated by reference and a copy is kept by the township clerk rather than published in the code.
    “for the purpose of this chapter, the township of maple shade is hereby divided into nine classes of districts, which shall be designated as follows”
  • Minimum lot sizeDistrict specific (with conditions)

    Dwellings in the R-1 residence district inside Maple Shade township (§ 205-17.a).

    • Each lot must have a width at the building line of not less than 60 feet; the minimum width at the right-of-way must be at least the building-line width unless the land use board grants a variance.
    • Where lots were recorded at the effective date of Chapter 205 and are less than 150 feet in depth, the minimum lot area may be reduced to 7,500 square feet.

    minimum lot area per family (dwelling): >= 9000 square feet (7,500 square feet for lots recorded at the chapter's effective date that are less than 150 feet deep) · minimum lot width at building line: >= 60 feet (land use board variance for right-of-way width)

    “a lot area of not less than 9,000 square feet per family shall be provided for every building hereafter erected or used in whole or in part as a dwelling, provided that, where lots are recorded at the effective date of this chapter which are less than 150 feet in depth, the lot area may be reduced to not less than 7,500 square feet.”
  • SetbacksDistrict specific (with conditions)

    Principal dwellings in the R-1 residence district inside Maple Shade township (§ 205-17.c); accessory structures in R-1 (§ 205-17.d).

    • Front yard setback is subject to the provisions of § 205-76 (yard exceptions).
    • Accessory uses and structures may not be placed in the front yard setback or forward of the front building line.
    • Sheds of 192 square feet or less may be located no closer than three feet from a side or rear property line.

    front yard depth (principal): >= 30 feet (subject to § 205-76) · side yards combined (principal): >= 20 feet (neither side less than 8 feet; corner lot street-abutting yard at least 15 feet) · side yard each (principal): >= 8 feet (corner lot street-abutting yard at least 15 feet) · rear yard depth (principal): >= 25 feet · accessory side yard: >= 5 feet (corner lot side yard adjacent a street 7.5 feet) · accessory rear yard: >= 12.5 feet

    “(1) front yard. one yard not less than 30 feet in depth, subject to the provisions of § 205-76. (2) side yards. two yards, not less than 20 feet in aggregate width, and neither less than eight feet, except that, in the ease of a corner lot, any yard which abuts a street shall be not less than 15 feet in width. (3) rear yard. one yard, not less than 25 feet in depth.”
  • Lot coverageDistrict specific (with conditions)

    Buildings on lots in the R-1 residence district inside Maple Shade township (§ 205-17.b).

    maximum building coverage of lot: <= 35 percent

    “not more than 35% of each lot may be occupied by buildings.”
  • Building heightDistrict specific (with conditions)

    Buildings and structures in the R-1 residence district inside Maple Shade township (§ 205-18).

    • Roof-mounted structures customarily incidental to residential use may not exceed the distance from the nearest property line to the base of the structure.

    maximum building or structure height: <= 35 feet (measured from grade)

    “no building or structure shall exceed 35 feet in height measured from grade. the height of roof-mounted structures customarily incidental to residential use shall not exceed the distance from the nearest property line to the base of the structure.”
  • Subdividing landRegulated (with conditions)

    Land divisions inside Maple Shade township.

    • Only the existence of the chapter is verified here; the approval thresholds and procedures in Chapter 178 (§§ 178-1 to 178-32) were not opened.
    “chapter 178 subdivisions and site plans (§ 178-1 &ndash; § 178-32)”
  • Permit processPartial

    Zoning permits for work inside Maple Shade township (Chapter 205, Article XIX).

    • Only the section titles of Article XIX (§§ 205-80 to 205-83) were read; the application steps and building-permit process are not established here.
    “article xix administration and enforcement § 205-80 enforcement officer designated; duties. § 205-81 zoning permit required. § 205-82 issuance of zoning permits and zoning permit duration. § 205-83 fees.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Maple Shade Township or Burlington County directly.

  • Building permit — Building permits for new homes inside Maple Shade township.
  • Owner-builder exemption — Owner-builder exemption for owner-built homes inside Maple Shade township.
  • Building code adopted — Construction codes enforced inside Maple Shade township.
  • Inspections — Building inspections inside Maple Shade township.
  • Certificate of occupancy — Certificates of occupancy for new homes inside Maple Shade township.
17 more unanswered
  • Minimum dwelling size
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Driveway access
  • Building in a floodplain
  • Short-term rentals
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Maple Shade Township publishes no rule on the point, not that none exists. Burlington County’s page lists the county offices to call.

Off-grid gear

Going off-grid in Maple Shade Township means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

← All of Burlington County: county rules, score and offices