Borough of Haddonfield is a borough in Camden County, New Jersey. Borough of Haddonfield adopts its own zoning, so inside its limits Borough of Haddonfield’s rules apply, not the county’s. 6 rules below are quoted from official sources and independently re-checked, most recently on October 23, 2026. Rules for unincorporated land are on the Camden County page.

Answers from the rulebook for Borough of Haddonfield

Borough of Haddonfield’s own rules

  • Building permitRequired

    New houses and additions inside Haddonfield borough limits.

    • Zoning approval must be granted before construction permits are submitted; zoning and construction permits cannot be submitted at the same time.
    • The page states that the following items must be submitted with a construction permit for new houses or additions, and that incomplete construction permit applications will not be accepted; the full checklist was not opened.
    • Construction may proceed only after the permit is issued.
    “construction permit will not be released and work cannot begin without this signed agreement.”
  • Building code adoptedAdopted

    Construction inside Haddonfield borough limits under the borough's construction codes chapter (eCode360 Chapter 92) and the Uniform Construction Code subcode forms the borough uses.

    • Chapter 92 text was not opened; only its title in the code table of contents and the borough's UCC subcode form list were seen.
    • The Uniform Construction Code itself is a state code (N.J.A.C. Title 5); this claim records the borough's own chapter and forms, not the state text.
    “chapter 92 construction codes, uniform (§ 92-1 – § 92-4)”
  • InspectionsRequired

    Work under borough UCC construction permits inside Haddonfield borough limits.

    • The page links a document titled as required inspections for UCC permits; that document was not opened, so the inspection sequence is unverified.
    • Inspections are required before final inspections for the affordable housing fee second payment, as the page states for construction permits.
    “this agreement states that no new building or addition shall be occupied or used without all final inspections and a certificate of occupancy (co) being issued by the construction office.”
  • Local zoningPresent (with conditions)

    Land inside Haddonfield borough limits: the borough's own land development and zoning ordinance (eCode360 Chapter 135, Land Development) administered by the borough Construction and Zoning department.

    • Zoning approval must be granted before a construction permit can be submitted.
    • Only the chapter title and the approval sequence were opened; the district schedule in Chapter 135 was not opened in this session.
    “zoning permits and construction permits cannot be submitted at the same time. zoning approval must be granted prior to submission of construction permits.”
  • Permit feesPublished

    Construction and zoning permit fees inside Haddonfield borough limits.

    • The page links a Haddonfield borough construction fee schedule; the schedule amounts were not opened, so no dollar amount is recorded.
    • Fees are payable by cash or check only; the borough does not accept electronic payment for permit application fees.
    “the borough of haddonfield does not accept electronic payment for permit application fees. cash and checks are both accepted.”
  • Permit processPublished

    Construction and zoning permit applications inside Haddonfield borough limits.

    • Applications are not accepted unless all forms are correctly completed.
    • Zoning approval comes before construction permit submission.
    • Payment is by cash or check only.
    “applications will not be accepted unless all forms are correctly completed.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Borough of Haddonfield or Camden County directly.

  • Owner-builder exemption — Owner-builder construction inside Haddonfield borough limits.
  • Zoning districts — Zoning district schedule of Haddonfield borough.
  • Minimum dwelling size — Minimum dwelling size in Haddonfield borough's single-family residential district.
  • Minimum lot size — Minimum lot size in Haddonfield borough's single-family residential district.
  • Setbacks — Yard setbacks in Haddonfield borough's single-family residential district.
18 more unanswered
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Borough of Haddonfield publishes no rule on the point, not that none exists. Camden County’s page lists the county offices to call.

Off-grid gear

Going off-grid in Borough of Haddonfield means bringing your own water and power. The kit we’d start with: