Zoning, building permits and septic rules in Upper Township, New Jersey
Upper Township is a township in Cape May County, New Jersey. Upper Township adopts its own zoning, so inside its limits Upper Township’s rules apply, not the county’s. 7 rules below are quoted from official sources and independently re-checked, most recently on October 23, 2026. Rules for unincorporated land are on the Cape May County page.
Answers from the rulebook for Upper Township
Upper Township’s own rules
Building code adoptedAdopted (with conditions)
Building construction in Upper Township administered through the Township Construction Code office
The township office runs uniform construction code inspections; the adopting chapter (Chapter 10, Building and Housing) and the state construction code citation were not opened, so the adoption source is the township office page only.
“this office can assist you with: uniform construction code inspections smoke detector & carbon monoxide certification for home resale development fee certification form”
InspectionsRequired
Construction inspections for work in Upper Township administered by the Township Construction Code office
Inspections must be scheduled in advance by phone; the page lists building inspections Monday to Friday 9:00 am to 2:30 pm, electrical Monday to Thursday, plumbing Tuesday and Thursday, and fire Tuesday and Thursday.
The construction department does not perform resale inspections; resale smoke and carbon monoxide certification is handled separately.
“inspections must be scheduled in advance. please call 609-628-2011 ext. 220 at least the day before you would like the inspection.”
Local zoningPresent (with conditions)
Land inside Upper Township, NJ limits; the Township's own zoning chapter (Chapter 20) governs use and bulk
Chapter 20 attaches Schedule A (residential uses), Schedule B (commercial and mixed-use uses), Schedule C (area and yard requirements) and a zoning map; if the text of § 20-4 conflicts with a schedule, the § 20-4 text controls.
§ 20-1.5 states that all uses not expressly permitted in the chapter are prohibited.
The eCode index lists legislation through 05-26-2026, and the Chapter 20 new-laws listing shows Ord. No. 015-2026 (zoning amendment, ch 20) dated 2026-09-14; the amendment's effective date was not opened.
Pinelands area provisions (§ 20-2.2, pv and rppv districts) apply to parts of the Township; Pinelands Commission rules were not checked.
“all uses not expressly permitted in this chapter are prohibited.”
Zoning districtsPublished (with conditions)
Zoning districts of Upper Township, including the AR and R2 residential districts
The district list is in Chapter 20 § 20-4 and the zoning map is Attachment 4; the district boundaries on the map were not opened.
“§ 20-4.2 "ar" agriculture and rural density residential. § 20-4.3 "r2" moderate density residential.”
Minimum dwelling sizeDistrict specific (with conditions)
Single-family detached dwellings in the AR agriculture and rural density residential district inside Upper Township
Applies to the AR district only; the R2 moderate density residential district minimum gross floor area was not established from the opened text.
The 1,000 square foot minimum does not apply to dwellings provided as affordable housing units under the same subsection.
minimum gross floor area, single-family detached dwelling: 1000 sq ft (unless provided as affordable housing units)
Land subdivision and site plan review for land inside Upper Township
Chapter 19 (§ 19-1 to § 19-13) text was not opened; the table of contents title establishes that subdivision and site plan regulation is in the code.
Planning and zoning office handles site plan review and subdivisions (see planning office page).
“chapter 19 land subdivision, site plan and land use administration”
Permit processPartial
Permit and inspection process for construction and land-use applications in Upper Township
The published process covers inspection scheduling and the planning and zoning office's service list; the step-by-step permit application and its fees were not found on the pages opened.
Construction office hours: 8:30 am to 4:00 pm, Monday through Friday (per the construction page).
“the office is open from 8:30 am to 4:00 pm, monday through friday.”
Still unanswered
We looked and could not find an official answer yet. Silence is not permission; ask Upper Township or Cape May County directly.
Building permit — Construction permits for work inside Upper Township
Owner-builder exemption — Owner-builder exemption for homeowners building on their own land in Upper Township
Minimum lot size — Minimum lot area for single-family lots in the AR and R2 districts inside Upper Township
Setbacks — Front, side and rear yard setbacks for single-family lots in the AR and R2 districts inside Upper Township
Lot coverage — Building and impervious coverage limits for single-family lots in the AR and R2 districts inside Upper Township
16 more unanswered
Building height
Living in an RV
Camping on your land
Tiny homes
Manufactured homes
Accessory dwellings
Who permits septic
Septic permit
Septic inspection
Off-grid sanitation
Well permit
Mandatory utility hookup
Agricultural exemption
Driveway access
Short-term rentals
Permit fees
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Upper Township publishes no rule on the point, not that none exists. Cape May County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Upper Township means bringing your own water and power. The kit we’d start with: