Bolthole Index

Cumberland County, New Jersey

Zoning, building permits and septic rules in Maurice River Township, New Jersey

Maurice River Township is a township in Cumberland County, New Jersey. Maurice River Township adopts its own zoning, so inside its limits Maurice River Township’s rules apply, not the county’s. 6 rules below are quoted from official sources and independently re-checked, most recently on October 23, 2026. Rules for unincorporated land are on the Cumberland County page.

Answers from the rulebook for Maurice River Township

Maurice River Township’s own rules

  • Building permitRequired

    Construction in Maurice River township: premanufactured accessory structures over 200 square feet, and building subcode fees on new construction and additions under section 11-1.3

    • Under Ordinance 763, accessory structures under 200 square feet need only a zoning permit ($25.00); larger ones also need a building permit.
    • Construction may proceed after the permit is issued.
    • The ordinance amends section 11-1.3 of the Revised General Ordinances; other provisions of Chapter 11 remain in effect.

    building permit flat fee, premanufactured accessory structure over 200 sq ft: 100 USD (plus zoning permit)

    “premanufactured accessory structures over 200 square feet require a zoning permit ($25.00) with drawings to determine set back requirements, a building permit with a flat fee of $100.00 and as per current ordinance”
  • Certificate of occupancyLimited

    Residential storage buildings over 200 square feet in Maurice River township

    • The ordinance sets a $60.00 CO fee only for residential storage buildings over 200 square feet; it does not state a general certificate-of-occupancy requirement for dwellings.
    • The general CO rule for dwellings was not retrieved.

    certificate of occupancy fee, residential storage building over 200 sq ft: 60 USD (residential storage buildings only)

    “residential storage buildings over 200 square feet require a $60.00 co fee”
  • Local zoningPresent (with conditions)

    Land inside Maurice River township limits: the township adopts and administers its own zoning ordinance, Chapter 35 Land Development Regulations, which divides the township into zone districts.

    • The zone districts listed for land outside the Pinelands area include C, C-15, R-5, R-10, MH, VC, VR, VB, VHB, VLI and RC; land inside the Pinelands area is under separate Pinelands districts.
    • The district dimensional schedules are attachments to Chapter 35 and were not retrieved (see dimensional claims).
    “for the purposes of this chapter, the township of maurice river is divided into the following zone districts:”
  • Zoning districtsPublished (with conditions)

    Land inside Maurice River township limits: zone district list and district regulations adopted in Chapter 35.

    • The zoning map is dated March 15, 2000, as amended; the originals are kept by the township land use board and an editor's note says the maps may be found on file at the township offices.
    • The district schedules are attachments that were not retrieved, so the district-by-district contents are not confirmed here.
    “outside the pinelands area of the township: c conservation c-15 conservation r-5 residential r-10 residential mh mobile home”
  • Permit feesPublished (with conditions)

    Construction permit fees inside Maurice River township under section 11-1.3 as amended by Ordinance 763

    • Fees are set by Ordinance 763, adopted 2026-02-19 and published as notice of adoption 2026-03-02; it takes effect upon adoption and publication.
    • The minimum building subcode fee is $100.00 for finished-interior new construction and additions.
    • Fees for factory-built portions of premanufactured homes are not charged under the state UCC reference.
    • Other provisions of Chapter 11 remain in effect except as amended.

    building subcode fee, new construction with finished interior: 0.3 USD per cubic foot of volume (minimum fee $100.00) · zoning permit fee, premanufactured accessory structures: 25 USD (structures under 200 sq ft and over 200 sq ft)

    “new construction, including additions, with finished interior, the fee shall be $0.30 per cubic foot of volume; provided the minimum fee shall be $100.00.”
  • Permit processPartial

    Zoning permit step for premanufactured accessory structures inside Maurice River township

    • Only the zoning-permit step for accessory structures is confirmed; the application, plan review and inspection sequence was not retrieved.
    • Drawings are required so setback requirements can be determined.
    “require a zoning permit ($25.00) with drawings to determine set back requirements”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Maurice River Township or Cumberland County directly.

  • Owner-builder exemption — Owner-builder exemption from permits in Maurice River township
  • Inspections — Building inspections for construction inside Maurice River township limits
  • Minimum dwelling size — Minimum dwelling floor area inside Maurice River township limits
  • Living in an RV — Occupancy of recreational vehicles on private land inside Maurice River township
  • Camping on your land — Temporary camping on private land inside Maurice River township
11 more unanswered
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Maurice River Township publishes no rule on the point, not that none exists. Cumberland County’s page lists the county offices to call.

Off-grid gear

Going off-grid in Maurice River Township means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

← All of Cumberland County: county rules, score and offices