Zoning, building permits and septic rules in Farmingdale, New Jersey

The Borough of Farmingdale in Monmouth County, New Jersey adopts its own zoning, and building permits are issued under the statewide Uniform Construction Code through the borough's construction department12. Septic systems answer to the Monmouth County Board of Health, the borough's listed health department3. Properties on borough sewer must connect before occupancy4.

At a glance

Building permit
Required under the state Uniform Construction Code; the borough construction department handles it25
Zoning
Borough zoning chapter and zoning map apply inside Farmingdale1
Septic
Monmouth County Board of Health is the borough's listed health department3
Sewer connection
New or improved structures that may be occupied must connect to borough sewer before occupancy where available4
Certificate of occupancy
Required for new buildings; the borough will not issue one for a sewer violation67
Owner-builder
A permit is still required; the exemption only covers builder registration8

Who to call

Building permits

Borough of Farmingdale Administrative Offices

Front desk for construction permit submission, inspection scheduling and zoning inquiries; lists the Monmouth County Board of Health as the borough's health department

732-938-4077

11 Asbury Avenue, Farmingdale, New Jersey 07727

Building permits

Farmingdale Construction Department

Building permits and inspections under the Uniform Construction Code

construction@farmingdaleborough.org

Planning & zoning

Farmingdale Zoning Officer

Zoning questions and the borough zoning map

zoning@farmingdaleborough.org

Contact details are copied from each office’s official page and were checked against it on October 13, 2026.

Off-grid gear

Going off-grid in Borough of Farmingdale means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Does Farmingdale, NJ have zoning, and what does it mean for RVs, tiny homes and setbacks?

Yes. The Borough of Farmingdale divides its land into zoning districts under its own zoning chapter, and uses and development remain subject to the borough zoning map and land-development regulations1. Monmouth County does not zone for the borough; the county's own regulations leave land use and development intensity to municipal zoning9.

Lot size, setbacks, minimum home size and height are set district by district in New Jersey, so the answer depends on which zone a parcel sits in1011. We could not confirm the borough's rules on RV occupancy, tiny homes or camping; ask the Zoning Officer through the borough's administrative offices before planning any of them12.

Do you need a building permit in Farmingdale, and who issues it?

Yes. New Jersey's Uniform Construction Code requires a permit before covered construction, alteration or demolition begins2. In Farmingdale the Construction Department handles permits, and submission and scheduling go through the Borough Administrative Office5. Inspections are by appointment, and fees depend on the scope of work5.

Monmouth County does not issue the building permit; the code is enforced by municipal code officials13. Farmingdale's own code chapters did not give us a separate general permit rule, so the state code is the operative requirement.

How do septic permits work inside Farmingdale?

The borough lists the Monmouth County Board of Health as its health department3. Monmouth County's Office of Public Health states that it oversees septic-system approvals and inspections for its member municipalities14. Call the county Office of Public Health to confirm how a specific lot is handled.

New Jersey requires a permit for sewerage facilities, including septic, and inspection before the system is covered1516. Wells need a state drilling permit17. Much of Farmingdale is served by borough sewer, which changes the septic question entirely, as the next section explains.

Do you have to connect to Farmingdale's sewer?

Where the borough sewer is ready and available, a new, modified or improved structure that may be occupied by people must connect before it is occupied or used4. Existing structures must connect within 120 days after the system is ready and available4.

The borough will not issue a certificate of occupancy if the Code Enforcement Officer finds a violation of the sewer chapter7. Whether a septic system is permitted on a lot that lacks sewer access was not stated in the borough code we reviewed, so ask the borough utilities office and the Monmouth County Board of Health.

Building a home in Farmingdale: the steps, in order

  1. Ask the Zoning Officer which district the parcel is in and whether the use and lot dimensions fit12.
  2. Confirm sewer or septic with the borough and the Monmouth County Board of Health3.
  3. Check whether a subdivision or a driveway onto a county road triggers county review18.
  4. Submit the construction permit application through the Borough Administrative Office5.
  5. Schedule inspections by appointment; the state requires at least 24 hours' notice19.
  6. Obtain the certificate of occupancy before moving in6.

Owner-builders skip builder registration for a home built for personal use, but not the construction permit8.

What stays with Monmouth County, and what to check before you buy?

Monmouth County reviews certain subdivisions and site plans, including those that touch county roads or drainage, and municipal building permits for covered projects cannot issue until that approval is in hand18. A driveway onto a state highway needs a state access permit20.

For land outside the borough, see the Monmouth County page; the county's figures there apply to the whole county, not just Farmingdale.

Watch-outs

  • We could not confirm the borough's rules on RV living, tiny homes, accessory dwellings or minimum lot size; ask the Zoning Officer through the borough administrative offices at 732-938-40773.
  • The borough's construction and zoning positions are part-time, and inspections and zoning visits are by appointment, so allow lead time5.
  • County septic oversight is stated for member municipalities, so confirm with the Monmouth County Office of Public Health that it covers a specific address14.

Sources

  1. Borough of Farmingdale, NJ Zoning Provisions (Borough of Farmingdale), quoted and re-checked
  2. N.J.A.C. 5:23-2.14, Construction permits—when required (New Jersey statewide rule), quoted and re-checked
  3. Borough of Farmingdale Administrative Offices (farmingdaleborough.org)
  4. Chapter 17: Sewers - Borough of Farmingdale, NJ (Borough of Farmingdale), quoted and re-checked
  5. Farmingdale Construction Department (farmingdaleborough.org)
  6. N.J.A.C. 5:23, Uniform Construction Code (New Jersey statewide rule), quoted and re-checked
  7. Chapter 17: Sewers - Borough of Farmingdale, NJ (Borough of Farmingdale), quoted and re-checked
  8. N.J.A.C. 5:25 — Regulations Governing New Home Warranties and Builders' Registration, quoted and re-checked
  9. Monmouth County Development Regulations Volume I, quoted and re-checked
  10. P.L. 2013, c.106 (Municipal Land Use Law amendments) (New Jersey statewide rule), quoted and re-checked
  11. P.L. 2013, c.106 (Municipal Land Use Law amendments) (New Jersey statewide rule), quoted and re-checked
  12. Farmingdale Zoning Officer (farmingdaleborough.org)
  13. The New Jersey State Uniform Construction Code — General Information, quoted and re-checked
  14. Office of Public Health Consumer Public Health/Inspection Services, quoted and re-checked
  15. New Jersey Statutes, R.S. 58:11-23 through 58:11-43 (New Jersey statewide rule), quoted and re-checked
  16. New Jersey Statutes, R.S. 58:11-23 through 58:11-43 (New Jersey statewide rule), quoted and re-checked
  17. Bulletin 88-10: Private On-Site Water Supply Systems (New Jersey statewide rule), quoted and re-checked
  18. Monmouth County Development Regulations Volume I, quoted and re-checked
  19. New Jersey Department of Community Affairs consumer construction information, quoted and re-checked
  20. Major Access Permits (New Jersey statewide rule), quoted and re-checked

Written October 13, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Borough of Farmingdale

Borough of Farmingdale’s own rules

  • Certificate of occupancyLimited

    Houses, buildings, and structures inside Farmingdale borough that are subject to the Borough sewer-connection requirement.

    • A new, modified, or improved structure that may be occupied by people must install sanitary-disposal facilities and connect before occupancy or use.
    • No owner may discharge effluent prohibited by Chapter 17.
    • No certificate of occupancy may issue if the Code Enforcement Officer deems the structure in violation of § 17-2.2.
    “No certificate of occupancy shall be issued”
  • Local zoningPresent (with conditions)

    Land inside Farmingdale borough limits.

    • Uses and development remain subject to the Borough zoning map and land-development regulations.
    “For the purpose of this chapter, the Borough of Farmingdale is divided into nine zones known as:”
  • Mandatory utility hookupSewer (with conditions)

    Houses, buildings, and structures inside Farmingdale borough limits when the Borough sewerage collection system is ready and available for connection.

    • Existing occupied or usable structures must connect all toilets and other waste-disposal units within 120 days after the system is ready and available.
    • New, modified, or improved structures that may be occupied by people must connect before occupancy or use.
    • Effluent prohibited by Chapter 17 may not be discharged to the sewer system.

    connection deadline for existing structures: 120 days (Runs from the date the sewerage collection system is ready and available for connection by the owner.)

    “within 120 days from the date the sewerage collection system is ready and available”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Borough of Farmingdale or Monmouth County directly.

  • Building permit — New residential construction inside Farmingdale borough limits.
  • Owner-builder exemption — Owner-built residences inside Farmingdale borough limits.
  • Inspections — New residential construction inside Farmingdale borough limits.
  • Minimum dwelling size — Single-family residential districts inside Farmingdale borough limits.
  • Minimum lot size — Single-family residential districts inside Farmingdale borough limits.
16 more unanswered
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Agricultural exemption
  • Driveway access
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Borough of Farmingdale publishes no rule on the point, not that none exists. Monmouth County’s page lists the county offices to call.