Town of Boston is a town in Erie County, New York. Septic permits inside Town of Boston come from Erie County (Erie County Department of Health — Division of Environmental Health · 716-961-6800). 7 rules below are quoted from official sources and independently re-checked, most recently on October 23, 2026. Rules for unincorporated land are on the Erie County page.
Erection, construction, enlargement, alteration, improvement, removal, or demolition of a building or structure, and installation of woodburning equipment, inside Boston town.
small noncommercial structure exemption threshold: < 100 square feet (Only if not intended for living, sleeping, eating, or cooking.) · permit commencement deadline: <= 180 days (Work must commence within this period.) · permit completion deadline: <= 1 calendar year (Measured from issuance.)
“No person, firm, corporation, association or other organization shall commence the erection, construction, enlargement, alteration, improvement, removal or demolition of any building or structure, nor install woodburning equipment, without having applied for and obtained a permit from the Code Enforcement Officer.”
Work inside Boston town for which a building permit has been issued.
inspection notice: >= 24 hours (Owner, applicant, or agent must inform the Code Enforcement Officer that work is ready.)
“Work for which a building permit has been issued under this chapter shall be inspected for approval prior to enclosing or covering any portion thereof”
Buildings subject to the Uniform Code and Chapter 57 inside Boston town.
temporary certificate duration: 6 months (Renewal thereafter only for good cause by Town Board resolution.)
“No building erected subject to the Uniform Code and this chapter shall be used or occupied, except to the extent provided in this section, until a certificate of occupancy has been issued.”
Mobile/manufactured homes in mobile-home courts inside Boston town.
“By the regulation of mobile homes in courts and the requirement that all mobile home courts be properly licensed by the Town Board.”
New construction for which a building permit is sought inside Boston town.
“Erie County Health Department certificate of approval for septic systems, or sewer tap permit from Erie County, Sewer District.”
Building-permit applications inside Boston town.
architect/engineer plan-seal floor-area threshold: > 1500 square feet (Gross habitable area.) · architect/engineer plan-seal alteration-cost threshold: > 10000 USD (Alterations costing over this amount.)
“Applications for a building permit may be obtained from the office of the Town Clerk. A completed application shall be delivered to the Code Enforcement Officer and must include:”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Boston or Erie County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Boston publishes no rule on the point, not that none exists. Erie County’s page lists the county offices to call.