Onondaga County, New York
Town of Geddes is a town in Onondaga County, New York. Town of Geddes adopts its own zoning, so inside its limits Town of Geddes’s rules apply, not the county’s. 8 rules below are quoted from official sources and independently re-checked, most recently on October 23, 2026. Rules for unincorporated land are on the Onondaga County page.
Construction, buildings, structures, and alterations inside the Town of Geddes.
“No construction shall be started nor any building or structure or the alteration of any existing building started without first obtaining a building permit. Nothing in this chapter shall require a permit to perform ordinary maintenance or to make internal rearrangements which do not involve structural change or changes in water and drainage lines or installation of new electric circuits.”
Construction of new structures and alteration of existing structures inside the Town of Geddes.
“New York State Uniform Fire Prevention and Building Code”
Buildings, structures, and sites subject to a Town of Geddes building-permit application.
“Before issuing a certificate of occupancy, the Code Enforcement Officer shall examine or cause to be examined all buildings, structures and sites for which an application has been filed for a building permit to construct, enlarge, alter, repair or change the use or nature of occupancy, and he may conduct such inspections as he deems appropriate from time to time during and upon completion of the work for which a building permit has been issued.”
Buildings inside the Town of Geddes requiring construction permits, and changes in the nature of occupancy of existing buildings.
“No building [...] shall be used or occupied”
Land inside the Town of Geddes, New York.
“the Town of Geddes is hereby divided into the following zoning districts:”
Zoning districts inside the Town of Geddes.
“Residential A [...] Residential B [...] Residential C [...] Residential D”
Building permits issued by the Town of Geddes.
“Building permit fees shall be as set by resolution of the Board of Trustees from time to time.”
Building-permit applications inside the Town of Geddes.
approval-or-disapproval period: <= 30 days (Measured from submission of the application.)
“Application for a building permit shall be made to the Code Enforcement Officer on forms provided by him and shall contain the following information:”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Geddes or Onondaga County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Geddes publishes no rule on the point, not that none exists. Onondaga County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Geddes means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.