Onondaga County, New York
Town of Pompey is a town in Onondaga County, New York. 7 rules below are quoted from official sources and independently re-checked, most recently on October 23, 2026. Rules for unincorporated land are on the Onondaga County page.
Work inside the Town of Pompey that must conform to the Uniform Code or Energy Code, including residential construction.
detached exempt structure gross floor area: <= 144 square feet (Tool and storage sheds, playhouses, or similar one-story detached structures associated with specified dwellings.)
“Except as otherwise provided in Subsection B of this section, a building permit shall be required for any work which must conform to the Uniform Code and/or the Energy Code, including, but not limited to, the construction, enlargement, alteration, improvement, removal, relocation, or demolition of any building or structure or any portion thereof, and the installation of a solid-fuel-burning heating appliance, chimney, or flue in any dwelling unit.”
Buildings, structures, and premises inside the Town of Pompey.
“The Uniform Code, the Energy Code and the International Residential Code, and all appendixes, supplements and the like, set forth in Title 19 NYCRR Parts 1219 through 1227, are hereby adopted by the Town of Pompey.”
Permitted construction inside the Town of Pompey.
“Work shall remain accessible and exposed until inspected and accepted by the Code Enforcement Officer or by an inspector authorized by the Code Enforcement Officer. The permit holder shall notify the Code Enforcement Officer when any element of work described in Subsection B of this section is ready for inspection.”
Work subject to a building permit and structures converted to another use or occupancy classification inside the Town of Pompey.
temporary certificate maximum period: <= 6 months (Only when the Code Enforcement Officer determines the statutory safety conditions are met.)
“A certificate of occupancy or certificate of compliance shall be required for any work which is the subject of a building permit and for all structures, buildings, or portions thereof, which are converted from one use or occupancy classification or subclassification to another.”
Subdivision of land inside the Town of Pompey.
“Chapter 144 Subdivision of Land [HISTORY: Adopted by the Town Board of the Town of Pompey 3-12-1979. Amendments noted where applicable.]”
Building permits, amendments, and renewals inside the Town of Pompey.
“The fee specified in or determined in accordance with the provisions set forth in § 93-18 (Fees) of this chapter must be paid at the time of submission of an application for a building permit, for an amended building permit, or for renewal of a building permit.”
Building-permit applications inside the Town of Pompey.
“Applications for a building permit shall be made in writing on a form provided by or otherwise acceptable to the Code Enforcement Officer. The application shall be signed by the owner of the property where the work is to be performed or an authorized agent of the owner.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Pompey or Onondaga County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Pompey publishes no rule on the point, not that none exists. Onondaga County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Pompey means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.