Butler County, Pennsylvania
Brady Township is a township in Butler County, Pennsylvania. Brady Township adopts its own zoning, so inside its limits Brady Township’s rules apply, not the county’s. Septic permits inside Brady Township come from Brady Township. 18 rules below are quoted from official sources and independently re-checked, most recently on October 24, 2026. Rules for unincorporated land are on the Butler County page.
Buildings inside Brady Township exceeding 200 square feet.
building area threshold: > 200 square feet (Agricultural buildings)
“This municipality hereby elects to require building permits for any building, except agricultural buildings, exceeding 200 square feet.”
Construction governed by Brady Township's municipal building code inside the Township.
“The Uniform Construction Code, contained in 34 Pa. Code, Chapters 401 through 405, as amended from time to time, is hereby adopted and incorporated herein by reference as the municipal building code of the municipality.”
Buildings of any type in Brady Township for zoning compliance.
“Buildings of any type shall require a minimum of a zoning permit and an inspection by the Zoning Officer to determine that proper setbacks, zoning and maximum size requirements are met.”
Commercial, industrial, single-family, multifamily, and institutional buildings before occupancy or use in Brady Township.
“Before a commercial, industrial, single or multifamily or institutional building is occupied or used, or a property occupied or used without the need of a building permit, zoning permit, or other structures used in compliance with the issued zoning permit or building permit, the owner shall secure the approval of the Zoning Officer in writing.”
Land inside Brady Township, Butler County, Pennsylvania.
“[HISTORY: Adopted by the Board of Supervisors of the Township of Brady 11-16-2005 by Ord. No. 2005-H. Amendments noted where applicable.]”
Zoning districts inside Brady Township.
“AR | = | Agricultural Residential Zoning District R | = | Residential Zoning District HC | = | Highway Commercial Zoning District LI | = | Light Industrial Zoning District PC | = | Park Conservation Zoning District”
Manufactured, mobile, or modular homes on their own lots in the AR Agricultural Residential and R Residential Districts of Brady Township.
“Manufactured, mobile or modular home on its own lot | P | P | | | P”
Installation of a privy, four or more portable toilets at one site, or a permanent or temporary sewage holding tank inside Brady Township.
portable-toilet threshold: >= 4 portable toilets at a single site (Sewage permit is required before installation or contract award)
“No person may install or award a contract for the installation of a privy or four or more portable toilets at a single site without first obtaining a sewage permit from the SEO.”
Alternate, experimental, and retaining-tank sewage systems inside Brady Township where the Township requires an operations-and-maintenance agreement.
“An agreement between the system owner and Township establishing the owner's operating and maintenance responsibilities and authorizing the Township to conduct periodic inspections of the system.”
Privies, portable toilets, and sewage holding tanks inside Brady Township.
permanent holding-tank flow limit: < 800 gallons per day (Institutions, recreational vehicle dumping stations, or commercial establishments)
“Permanent sewage holding tanks shall only be permitted: [...] For institutions, recreational vehicle dumping stations or commercial establishments with a sewage flow of less than 800 gallons per day; or [...] When the use is necessary to abate a nuisance or public health hazard.”
Agricultural buildings inside Brady Township.
“This municipality hereby elects to require building permits for any building, except agricultural buildings, exceeding 200 square feet.”
Lots requiring subdivision or land-development approval inside Brady Township.
“No zoning permit shall be issued unless the applicant presents the Zoning Officer with proof that any applicable subdivision and/or land development approval has been granted, a sewage permit has been issued by the Township Sewage Enforcement Officer for the lot, a driveway permit or a highway occupancy permit issued by the Department of Transportation of the Commonwealth of Pennsylvania or a Brady Township road occupancy permit has been issued in order that access may be gained to the lot, and all other required Township approvals and permits have been granted or issued.”
Zoning-permit applicants seeking access to a lot inside Brady Township.
“No zoning permit shall be issued unless the applicant presents the Zoning Officer with proof that any applicable subdivision and/or land development approval has been granted, a sewage permit has been issued by the Township Sewage Enforcement Officer for the lot, a driveway permit or a highway occupancy permit issued by the Department of Transportation of the Commonwealth of Pennsylvania or a Brady Township road occupancy permit has been issued in order that access may be gained to the lot, and all other required Township approvals and permits have been granted or issued.”
Zoning permits and other listed land-use actions inside Brady Township.
“The Board of Supervisors shall establish by resolution a schedule of fees to cover the cost of permits, conditional use approvals, petitions to amend the ordinance, or any action brought before the Zoning Hearing Board or Planning Commission. The current fee schedule shall be available at the office of the Township Secretary and may be amended only by official resolution of the Board.”
New construction, structural or site alteration, and changes in building or lot use inside Brady Township.
zoning-officer action period without referral: <= 30 days (No referrals required) · zoning-officer action period with Board referral: <= 90 days (From complete application including required fees)
“The Zoning Officer shall complete this examination and take action on the permit within 30 days if no referrals are required. However, if referral to the Board of Supervisors is required, action by the Zoning Officer shall take place within 90 days from the date of the application including required fees, filed with the Township.”
Brady Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Buildings and impervious surfaces in the AR Agricultural Residential District inside Brady Township.
maximum lot coverage: <= 20 percent
“By impervious surface (percent of property) | 20% | 20% | 65% | 65% | 15%”
“By impervious surface (percent of property) | 20% | 20% | 65% | 65% | 15%”
We looked and could not find an official answer yet. Silence is not permission; ask Brady Township or Butler County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Brady Township publishes no rule on the point, not that none exists. Butler County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Brady Township means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.