Zoning, building permits and septic rules in Forward Township, Pennsylvania
Forward Township is a township in Butler County, Pennsylvania. Septic permits inside Forward Township come from Forward Township. 9 rules below are quoted from official sources and independently re-checked, most recently on October 24, 2026. Rules for unincorporated land are on the Butler County page.
Answers from the rulebook for Forward Township
Forward Township’s own rules
Building permitRequired
Construction, reconstruction, enlargement, or relocation of a building or structure inside Forward Township.
Repairs to existing buildings or structures do not require a building permit when no structural changes are involved.
The permit must be obtained from the Municipal Building Permit Officer.
“unless an approved building permit has been obtained”
InspectionsLimited
Work proceeding under a Forward Township building permit.
The Building Permit Officer or another authorized official may inspect during the construction period to assess compliance with the permit application and applicable municipal laws and ordinances.
“During the construction period, the Building Permit Officer or other authorized official may inspect the premises to determine that the work is progressing in compliance with the information provided on the permit application and with all applicable municipal laws and ordinances.”
Manufactured homesLimited
Individual mobile homes not located in a mobile-home park inside Forward Township.
An individual mobile home is not required to obtain a mobile-home-park license.
It must obtain the building permits prescribed by Township ordinances and comply with all other applicable municipal ordinances and regulations governing single-family homes.
“Individual mobile homes not located in a mobile home park shall not be required to obtain a mobile home park license”
Who permits septicLocal (with conditions)
Nonresidential holding-tank use, sewage disposal, and sewage collection and transportation inside Forward Township.
This Township authority is stated in the holding-tank ordinance and does not establish the administering authority for every residential on-lot sewage system.
“The Township is authorized and empowered to undertake within the Township the regulation and inspection of holding tank use, sewage disposal, and sewage collection and transportation thereof.”
Septic permitRequired
Construction or installation of a holding tank on nonresidential property inside Forward Township.
The owner must apply for and obtain the permit before construction or installation.
The application is available from the Township Secretary.
The owner must enter into a written agreement with the Township for permitting, installation, maintenance, and inspection.
“obtain a permit prior to the construction”
Septic inspectionRequired
Permitted holding tanks inside Forward Township.
The Township Sewage Enforcement Officer inspects during installation and annually.
The stated rule is for holding tanks.
inspection frequency: per 1 year (Inspection also occurs during installation.)
“both during installation and on an annual basis”
Subdividing landRegulated (with conditions)
Subdivision and land development inside Forward Township.
The official code publishes Chapter 22, Subdivision and Land Development.
“Chapter 22 Subdivision and Land Development”
Building in a floodplainRequired
Construction or development inside Forward Township, including development in identified floodplain areas.
The floodplain administrator issues a permit only after determining conformance with applicable codes and ordinances.
Before issuance, the administrator reviews whether other necessary state and federal permits have been obtained.
For applications located entirely or partially in an identified floodplain area, the ordinance imposes additional submission and flood-damage-minimization requirements.
“A permit shall be required before any construction or development is undertaken within any area of the Township of Forward.”
Permit feesVariable (with conditions)
Forward Township building permits.
The fee is payable to the Township.
It is based on estimated construction cost as determined by the Building Permit Officer.
Rates are established from time to time by Board of Supervisors resolution.
“Applications for a building permit shall be accompanied by a fee, payable to the Township, based upon the estimated cost of the proposed construction as determined by the Building Permit Officer at the following rates established from time to time by resolution of the Board of Supervisors.”
Still unanswered
We looked and could not find an official answer yet. Silence is not permission; ask Forward Township or Butler County directly.
Owner-builder exemption — Owner construction inside Forward Township.
Building code adopted — Building-code adoption for construction inside Forward Township.
Certificate of occupancy — Occupancy of constructed buildings inside Forward Township.
Local zoning — Land inside Forward Township, Butler County, Pennsylvania.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Forward Township publishes no rule on the point, not that none exists. Butler County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Forward Township means bringing your own water and power. The kit we’d start with: