Bolthole Index

Centre County, Pennsylvania

Spring Township, Pennsylvania: building permits, zoning and septic

Spring Township, Pennsylvania, in Centre County, requires building and/or zoning permits for new construction and alterations; start with the township Code Enforcement / Zoning office.1 Spring Township has its own zoning, so a parcel needs a township-specific land-use answer.2 Septic applications go to the township secretary, and the township appoints a Sewage Enforcement Officer for inspections.3

At a glance

Building approval
Building and/or zoning permits required for new construction and alterations1
Zoning
Township zoning applies; ask the zoning officer about the parcel2
Septic applications
Written application to the township secretary3
Septic maintenance
Pump every 3 years; inspect every 6 years4
Owner-builder
No statewide license for most contractors; township requirements may apply5
Occupancy
UCC-covered residential buildings need a certificate of occupancy6

Who to call

Building permits

Spring Township Code Enforcement / Zoning

First contact for township building and zoning approval

355-7543 Ext. 104

code@springtownship.org

1309 Blanchard Street Bellefonte, PA 16823

Planning & zoning

Spring Township Application Forms

Building, zoning, plan review and township road occupancy application forms

Septic permits

Spring Township Secretary / Sewage Enforcement Officer

Township septic application intake and sewage inspections

Contact details are copied from each office’s official page and were checked against it on October 15, 2026.

Off-grid gear

Going off-grid in Spring Township means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Spring Township, PA?

Spring Township requires building and/or zoning permits for new construction and alterations, including additions, decks, sheds, garages and pools; ask the Code Enforcement / Zoning office which approvals your project needs.1 The township publishes a building application for most construction and remodeling projects, plumbing and changes of heating sources.7

For residential work covered by Pennsylvania’s Uniform Construction Code, the construction code official must inspect permitted construction, and the permit holder must keep the work accessible for inspection.8 A UCC-covered residential building cannot be used or occupied before a building code official issues a certificate of occupancy.6

Does Spring Township have zoning, and can you live in an RV or tiny home?

Spring Township has its own zoning officer and zoning hearing board; direct parcel-use questions to the township rather than treating the county’s zoning answer as permission to build.2 The township offers a zoning permit application for minor construction, temporary uses and changes of property use.7

We could not confirm Spring Township’s rules for living in an RV, temporary camping, tiny homes, accessory dwellings, minimum dwelling size, district lot sizes or setbacks. Ask the township zoning officer to identify the parcel’s district and explain whether your proposed dwelling and any temporary accommodation are allowed. Request the applicable dimensional standards before choosing a building footprint. The township directs applicants to check which building and zoning approvals are required before starting work.9

How do septic permits work inside Spring Township?

Spring Township’s code directs written septic permit applications to the township secretary and assigns inspections to a township-appointed Sewage Enforcement Officer.3 Pennsylvania generally requires local-agency approval before installing or constructing an on-lot sewage system or occupying a building it serves, subject to statutory exceptions.10 Ask the township secretary for the current Sewage Enforcement Officer and the site-evaluation application before committing to an unsewered parcel.

Spring Township requires septic tanks to be pumped every 3 years and inspected every 6 years; ask for the seller’s maintenance records.4 For a new residence using a composting or incinerating toilet, Pennsylvania still requires an approved way to treat washwater or excess liquid; the toilet alone does not resolve wastewater disposal.11

Building a home in Spring Township: what steps come first?

  1. Ask Spring Township Code Enforcement / Zoning which building and zoning approvals apply to the proposed home and any outbuildings.1
  2. For an on-lot sewage system, contact the township secretary for the septic application and Sewage Enforcement Officer before arranging construction.310
  3. Obtain the appropriate building and zoning forms from the township; the forms page distinguishes building projects from minor construction and temporary uses.7
  4. Keep UCC-permitted residential construction accessible and notify the construction code official when work is ready for inspection.8
  5. Obtain the required residential certificate of occupancy before moving into a UCC-covered home.6

Pennsylvania has no statewide licensing requirement for most contractors, but municipalities may impose requirements of their own; doing the work yourself does not answer the township approval question.51

What should you check before buying land in Spring Township?

Ask Spring Township about road access early: the township publishes a road occupancy application for new driveways, widening a driveway at the road entrance and utility work within township road rights-of-way.7 Work on state highway land, including constructing or changing a driveway, instead triggers PennDOT’s Highway Occupancy Permit requirements.12 Development within a Special Flood Hazard Area requires a municipal floodplain development permit or equivalent before work begins.13

Spring Township also has subdivision and land-development regulations; ask about review before buying land you intend to divide.14 For a search extending beyond the township, consult the Centre County guide. We could not confirm township well approvals, mandatory utility connections or current building permit fees; ask the township Code Enforcement / Zoning office for the applicable requirements and fee schedule.

Watch-outs

  • A qualifying agricultural building can be exempt from Pennsylvania’s Construction Code Act, but the exemption excludes habitable space and does not remove municipal land-use requirements.15
  • We could not confirm RV or tiny-home occupancy rules in Spring Township; obtain a parcel-specific answer from the township zoning officer before planning to live on the land.2
  • Spring Township’s septic pumping and inspection obligations continue after purchase: pump every 3 years and inspect every 6 years.4

Sources

  1. Code Enforcement / Zoning - Spring Township, PA (Spring Township), quoted and re-checked
  2. Code Enforcement / Zoning - Spring Township, PA (Spring Township), quoted and re-checked
  3. Spring Township Secretary / Sewage Enforcement Officer (ecode360.com)
  4. Code Enforcement / Zoning - Spring Township, PA (Spring Township), quoted and re-checked
  5. Contractor Licensing (Pennsylvania statewide rule), quoted and re-checked
  6. Part XIV, Uniform Construction Code, Chapter 403 Administration (Pennsylvania statewide rule), quoted and re-checked
  7. Spring Township Application Forms (springtownship.org)
  8. Part XIV, Uniform Construction Code, Chapter 403 Administration (Pennsylvania statewide rule), quoted and re-checked
  9. Spring Township Code Enforcement / Zoning (springtownship.org)
  10. 25 Pa. Code § 72.22. Permit issuance (Pennsylvania statewide rule), quoted and re-checked
  11. 25 Pa. Code § 73.65. Recycling toilet, incinerating toilet or composting toilet (Pennsylvania statewide rule), quoted and re-checked
  12. Apply for a PennDOT Highway Occupancy Permit (Pennsylvania statewide rule), quoted and re-checked
  13. PennsylvaniA Floodplain Development Guide (Pennsylvania statewide rule), quoted and re-checked
  14. Township of Spring, PA eCode360 table of contents (Spring Township), quoted and re-checked
  15. Pennsylvania Construction Code Act — Chapter 1 (Pennsylvania statewide rule), quoted and re-checked

Written October 15, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Spring Township

Spring Township’s own rules

  • Building permitRequired

    New construction and alterations to structures inside Spring township

    • Page advises to check with the township first to see what permits are required.
    “permits - a building and/or zoning permits are required for any new construction and alternations to a structure, including additions, decks, sheds, garages, pools etc. always check with the township first to see what permits are required.”
  • Local zoningPresent

    Land inside Spring township

    • Township has a zoning officer and a zoning hearing board; code Chapter 27 Zoning is listed on eCode360.
    “zoning officer: vaughn zimmerman - 355-7543 ext. 104 e-mail: code@springtownship.org zoning hearing board (3-year term)”
  • Septic inspectionRequired

    On-lot disposal (septic) systems inside Spring township

    • Periodic pumping and inspection cycle stated on township page; ordinance section not opened.

    pump interval: 3 years · inspection interval: 6 years

    “on lot disposal systems (septic) - all septic tanks shall be pumped every three years and inspected every six years.”
  • Subdividing landRegulated (with conditions)

    Subdivision and land development inside Spring township

    • Chapter 22 text not opened; only its existence in the code is confirmed.
    “chapter 22 subdivision and land development (§ 22-101 – § 22-707)”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Spring Township or Centre County directly.

  • Owner-builder exemption — Owner-builder exemption inside Spring township
  • Building code adopted — Building code inside Spring township
  • Inspections — Building inspections inside Spring township
  • Certificate of occupancy — Certificate of occupancy inside Spring township
  • Zoning districts — Zoning districts inside Spring township
21 more unanswered
  • Minimum dwelling size
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Driveway access
  • Building in a floodplain
  • Short-term rentals
  • Permit fees
  • Permit process

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Spring Township publishes no rule on the point, not that none exists. Centre County’s page lists the county offices to call.

← All of Centre County: county rules, score and offices