West Goshen Township, Pennsylvania requires building permits for covered residential construction, with applications through township Code Enforcement.12 West Goshen Township has its own zoning; Chester County Health Department handles on-lot sewage and well construction permits.34 The township’s minimum dwelling-size rules deserve attention before you buy land for a small home.5
At a glance
- Building permits
- Required for covered residential construction; apply through township Code Enforcement12
- Zoning
- Township zoning applies3
- Septic permits
- Chester County Health Department; new systems, repairs and modifications, with limited repair exceptions64
- Minimum dwelling size
- One-story: 1,100 sq ft first-floor living area; one-and-one-half-story: 950 sq ft first-floor living area; two-story: 700 sq ft projected living area5
- Wells
- County Health Department permit required; licensed contractor applies7
- Owner-builder
- Pennsylvania has no general contractor license requirement for most construction; municipal requirements may apply8
Who to call
Building permits
West Goshen Township Code Enforcement
Township building and zoning application forms, use and occupancy applications, and road occupancy applications
1025 Paoli Pike
Codes & inspections
West Goshen Township residential building application instructions
Residential plan submission requirements
1025 PAOLI PIKE
Septic permits
Chester County Health Department — Sewage & Water
On-lot sewage disposal and well construction permits
601 Westtown Road, Suite 295
Contact details are copied from each office’s official page and were checked against it on October 15, 2026.
Off-grid gear
Going off-grid in West Goshen Township means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in West Goshen Township, PA?
West Goshen Township home construction and other residential work covered by Pennsylvania’s Uniform Construction Code require a building permit before work begins.1 Township Code Enforcement publishes the residential building application package and use and occupancy application.2 Ordinary repairs have limited exemptions, but structural changes and changes to required escape routes are outside the ordinary-repair exemption.1 A residential building governed by the UCC also needs a certificate of occupancy before use or occupancy.9
Who handles West Goshen Township building and zoning applications?
Start with West Goshen Township Code Enforcement for building and zoning application forms, including the township’s residential building package, zoning application and use and occupancy application.2 The residential package directs applicants to obtain land-development and zoning approvals before submitting building plans.10 The township requires structural plans signed and sealed by an architect or engineer, and its application instructions call for original complete plans plus a digital copy emailed to permits@westgoshen.org.10 Septic and well construction permits remain with Chester County Health Department.4
Does West Goshen Township have zoning, and can you build a tiny home?
West Goshen Township has a zoning ordinance, so a building-code decision alone does not settle the proposed land use.310 The township’s dwelling-size provision specifies at least 1,100 square feet of first-floor living area for a one-story dwelling, 950 for a one-and-one-half-story dwelling, and 700 square feet of projected living area for a two-story dwelling.5 Porches, garages, breezeways, utility rooms and similar areas do not count toward living area.5 Ask Code Enforcement to confirm the parcel’s district, setbacks, lot coverage and how the dwelling-size provision applies to your design; we could not confirm the district-specific dimensions or a separate tiny-home occupancy rule.32
How do septic permits and wells work in West Goshen Township?
Chester County Health Department issues permits for individual and small-community on-lot sewage systems and well construction inside West Goshen Township.4 New sewage systems, repairs and modifications require a septic permit, with an exception for repairs completed without digging equipment; major new permits require soil testing.6 Do not cover a sewage system before final inspection and written approval from the county Sewage Enforcement Officer.11 A licensed contractor must apply for a well permit, and new construction must have public sewerage or a valid sewage permit.7
Can you live in an RV while building in West Goshen Township?
We could not confirm permission to occupy an RV on a private lot in West Goshen Township, including temporary occupancy during home construction; ask township Code Enforcement about the proposed use before making an RV part of your building plan.23 The township has zoning, and its residential application instructions require zoning approval ahead of building-plan submission.310 For occupancy of a residential building governed by the UCC, a certificate of occupancy is required; Pennsylvania allows a temporary certificate only where the covered portion can be occupied safely and the official sets its validity period.9
Building a home in West Goshen Township: what comes first?
Begin with township Code Enforcement to resolve zoning and any land-development approval before submitting building plans.10 For a site using on-lot sewage, arrange county soil testing and the sewage permit; for a new well, have the licensed contractor apply after the property has public sewerage or a valid sewage permit.67 Submit the township’s required building documents and obtain the building permit before covered construction.101 Keep permitted work accessible for inspections and obtain the residential certificate of occupancy before moving in.129 For land outside the township, consult the Chester County guide for county sewage and well requirements.4
Watch-outs
- West Goshen Township’s minimum dwelling-size rule excludes garages and porches from living area; do not count them toward a small-home design.5
- A new well application depends on public sewerage or a valid sewage permit for new construction, so resolve wastewater disposal early.7
- Building or changing a driveway on state highway land requires a PennDOT highway occupancy permit.13
Sources
- Part XIV, Uniform Construction Code, Chapter 403 Administration (Pennsylvania statewide rule), quoted and re-checked
- West Goshen Township Code Enforcement (westgoshen.org)
- Township of West Goshen, PA eCode360 table of contents (West Goshen Township), quoted and re-checked
- Chester County Health Department — Sewage & Water (chesco.org)
- West Goshen Township Chapter 28 Building Code (West Goshen Township), quoted and re-checked
- Permits for On-Lot Sewage Disposal Systems, quoted and re-checked
- Chester County Health Department Rules and Regulations, quoted and re-checked
- Contractor Licensing (Pennsylvania statewide rule), quoted and re-checked
- Part XIV, Uniform Construction Code, Chapter 403 Administration (Pennsylvania statewide rule), quoted and re-checked
- West Goshen Township residential building application instructions (westgoshen.org)
- Application and Permit Procedure for On Lot Sewage Systems, quoted and re-checked
- Part XIV, Uniform Construction Code, Chapter 403 Administration (Pennsylvania statewide rule), quoted and re-checked
- Apply for a PennDOT Highway Occupancy Permit (Pennsylvania statewide rule), quoted and re-checked
Written October 15, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.