Bolthole Index

Monroe County, Pennsylvania

Borough of Mount Pocono, PA: building permits, zoning and septic rules

The Borough of Mount Pocono, Pennsylvania requires a building permit before construction, alterations or repairs other than ordinary repairs.1 Mount Pocono has its own zoning, and the borough Zoning and Code Enforcement office is the local contact.23 Septic construction and alteration permits come from the borough Sewage Enforcement Officer.4 For land outside the borough, use the Monroe County guide to identify the applicable municipal rules.5

At a glance

Building permit
Required before covered construction, alterations and repairs; ordinary repairs excepted1
Zoning
Borough zoning applies; ask the borough officer for the parcel’s district and permitted uses23
Septic authority
Borough Sewage Enforcement Officer handles sewage-system construction and alteration permits4
Building permit fees
Set by borough resolution; request the current schedule6
Owner-builder
Pennsylvania has no statewide license requirement for most contractors; local requirements may apply, and building permits still apply71
Occupancy
A UCC-regulated residential building needs a certificate of occupancy before use8

Who to call

Building permits

Borough of Mount Pocono Zoning and Code Enforcement

Local zoning and code-enforcement inquiries; contact the office about building applications and parcel-specific zoning.

(570) 664-2023

smcglynn@sfmconsultingllc.org

1361 Pocono Boulevard Suite 100

Septic permits

Borough of Mount Pocono Sewage Enforcement Officer

Grants or denies permits for construction or alteration of individual and community sewage systems. Ask Borough Hall for the current officer’s contact.

Also useful

Mount Pocono Borough Hall

General borough contact; request a referral to the Sewage Enforcement Officer or the official handling floodplain development.

(570) 839-8436

1361 Pocono Blvd. Suite 100 Mount Pocono, PA 18344

Contact details are copied from each office’s official page and were checked against it on October 14, 2026.

Off-grid gear

Going off-grid in Borough of Mount Pocono means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in the Borough of Mount Pocono, PA?

Mount Pocono requires a building permit before construction, alteration or repairs, with an exception for ordinary repairs.1 The borough has adopted Pennsylvania’s Uniform Construction Code as its municipal building code.9 For a home project, start with the borough Zoning and Code Enforcement office and describe the proposed work before ordering materials.3

Mount Pocono’s building-code administration fees are established by borough resolution; request the current fee schedule with the application forms.6 Doing the work yourself does not remove the borough’s building-permit requirement: Pennsylvania’s lack of a statewide license requirement for most contractors is a separate issue.17

Does the Borough of Mount Pocono have zoning, and can you use an RV or tiny home?

Mount Pocono has its own zoning ordinance, zoning officer and zoning hearing board.2 Bring the parcel address and a description of the intended use to the borough Zoning and Code Enforcement office, and ask for the applicable district, permitted dwelling types, minimum lot size, setbacks and lot coverage.32

We could not confirm Mount Pocono’s rules for living in an RV, temporary camping, tiny homes, accessory dwellings or minimum dwelling size; ask the borough zoning officer about each proposed use before buying.3 A building permit for construction does not establish that a proposed land use fits Mount Pocono’s zoning; resolve both questions with the borough office.123

How do septic permits work inside the Borough of Mount Pocono?

Mount Pocono’s Sewage Enforcement Officer has authority to grant or deny permits for construction or alteration of individual and community sewage systems.4 Ask Borough Hall for the current officer’s contact and establish whether the parcel needs on-lot sewage approval or a public-sewer connection before committing to a house design.104

Pennsylvania generally requires a sewage permit before installing, altering, repairing or connecting to a sewage system covered by the Sewage Facilities Act.11 For an on-lot system, the local agency must inspect and approve the installation before occupancy, subject to the state’s rules on permission to cover.12 A composting toilet for a new residence does not eliminate the need for an approved method to treat washwater and excess liquid.13

What are the steps for building a home in the Borough of Mount Pocono?

Start by resolving the proposed use with the borough zoning office, then coordinate sewage approval and the building application before construction.2341

  1. Ask the borough zoning officer to identify the parcel’s district and review the intended home and site layout.23
  2. Ask the Sewage Enforcement Officer about on-lot sewage approval, and ask Borough Hall who handles public-sewer service questions.410
  3. Obtain the required building permit before starting covered work and request the current borough fee schedule.16
  4. Arrange required residential UCC inspections, keep the work accessible and notify the construction code official when work is ready.14
  5. Obtain the certificate of occupancy before using a UCC-regulated residential building.8

What should you check before buying land in the Borough of Mount Pocono?

For a driveway built or changed on state highway land, or connected to a PennDOT drainage facility, Pennsylvania requires a highway occupancy permit; ask PennDOT about the proposed access.15 For development in a Special Flood Hazard Area, Pennsylvania municipalities review applications and issue or deny local floodplain development permits; ask Borough Hall for Mount Pocono’s responsible official.1610

We could not confirm Mount Pocono’s local private-well approval or public-water connection requirements; ask Borough Hall which office reviews the parcel’s proposed water supply.10 Pennsylvania requires water-well drilling companies to obtain licenses and permits, with a homeowner or farmer self-drilling exception, but that state rule does not settle the borough’s local approval question.17

Watch-outs

  • We could not confirm Mount Pocono’s RV or tiny-home occupancy rules; obtain an answer from the borough zoning officer for the intended parcel and use.3
  • Pennsylvania’s owner-builder licensing position does not waive Mount Pocono’s building permits or required UCC inspections.7114
  • Ask the Sewage Enforcement Officer to review a proposed on-lot sewage system before treating a building-permit application as the complete approval process.411

Sources

  1. Borough of Mount Pocono Code, Chapter 78 Construction Codes, Uniform (Borough of Mount Pocono), quoted and re-checked
  2. Borough of Mount Pocono Code, Chapter 215 Zoning (table of contents) (Borough of Mount Pocono), quoted and re-checked
  3. Borough of Mount Pocono Zoning and Code Enforcement (mountpocono-pa.gov)
  4. Borough of Mount Pocono Sewage Enforcement Officer (ecode360.com)
  5. 2025 Annual Report, quoted and re-checked
  6. Borough of Mount Pocono Code, Chapter 78 Construction Codes, Uniform (Borough of Mount Pocono), quoted and re-checked
  7. Contractor Licensing (Pennsylvania statewide rule), quoted and re-checked
  8. Part XIV, Uniform Construction Code, Chapter 403 Administration (Pennsylvania statewide rule), quoted and re-checked
  9. Borough of Mount Pocono Code, Chapter 78 Construction Codes, Uniform (Borough of Mount Pocono), quoted and re-checked
  10. Mount Pocono Borough Hall (mountpocono-pa.gov)
  11. Act 537 Pennsylvania Sewage Facilities Act, quoted and re-checked
  12. 25 Pa. Code § 72.30. Inspection, quoted and re-checked
  13. 25 Pa. Code § 73.65. Recycling toilet, incinerating toilet or composting toilet (Pennsylvania statewide rule), quoted and re-checked
  14. Part XIV, Uniform Construction Code, Chapter 403 Administration (Pennsylvania statewide rule), quoted and re-checked
  15. Apply for a PennDOT Highway Occupancy Permit (Pennsylvania statewide rule), quoted and re-checked
  16. PennsylvaniA Floodplain Development Guide (Pennsylvania statewide rule), quoted and re-checked
  17. Apply for a Water Well Drillers License and Rig Permit (Pennsylvania statewide rule), quoted and re-checked

Written October 14, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Borough of Mount Pocono

Borough of Mount Pocono’s own rules

  • Building permitRequired

    Construction, alteration or repairs inside Mount Pocono borough

    • Ordinary repairs excepted
    • Construction permit required for garages, carports, greenhouses and sheds accessory to a single-family dwelling greater than 200 feet
    “a permit shall be obtained before beginning construction, alteration or repairs, other than ordinary repairs, using application forms furnished by the building official.”
  • Building code adoptedAdopted

    Construction inside Mount Pocono borough

    • Adopted as amended from time to time
    • Enforcement method set by governing body resolution (§ 78-3)
    “the uniform construction code, contained in 34 pa. code chapters 401 through 405, as amended from time to time, is hereby adopted and incorporated herein by reference as the municipal building code of the borough of mount pocono.”
  • Local zoningPresent

    Land inside Mount Pocono borough; the borough codifies its own Chapter 215 Zoning with a zoning officer and zoning hearing board

    • Only the chapter table of contents was readable; district text was not opened.
    “§ 215-107 zoning officer. § 215-108 zoning hearing board.”
  • Permit feesVariable (with conditions)

    Building permit and code administration fees inside Mount Pocono borough

    • Amounts are set by governing body resolution; the fee schedule itself was not located
    “fees assessable by the borough of mount pocono for the administration and enforcement undertaken pursuant to this chapter and the code shall be established by the governing body by resolution from time to time.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Borough of Mount Pocono or Monroe County directly.

  • Owner-builder exemption — Owner-builder exemption inside Mount Pocono borough
  • Inspections — Inspections inside Mount Pocono borough
  • Certificate of occupancy — Certificates of occupancy inside Mount Pocono borough
  • Zoning districts — Zoning districts inside Mount Pocono borough
  • Minimum dwelling size — Minimum dwelling size inside Mount Pocono borough
21 more unanswered
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals
  • Permit process

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Borough of Mount Pocono publishes no rule on the point, not that none exists. Monroe County’s page lists the county offices to call.

← All of Monroe County: county rules, score and offices