Bolthole Index

Northampton County, Pennsylvania

Building permits, zoning and septic rules in Walnutport, Pennsylvania

The Borough of Walnutport, in Northampton County, Pennsylvania, runs its own zoning under Chapter 450 of its code1. Building permits follow Pennsylvania's Uniform Construction Code, which the borough has elected to administer and enforce2. Septic permits come from a local sewage agency under state law, and we could not confirm which one covers the borough3. Call the borough office before you buy or build.

At a glance

Zoning
Yes. Borough-wide zoning with eight districts plus floodplain and steep-slope overlays14
Building permit
Required under the state Uniform Construction Code, which the borough administers25
Permit fees
Set by borough resolution; amounts not confirmed6
Septic
Permit required from a local agency; not confirmed which one serves the borough. Sewer hookup is required near a borough sewer line37
Maximum height
35 feet generally; 15 feet for accessory structures to dwellings8
Owner-builder
Pennsylvania has no statewide contractor licensing for most construction9

Who to call

Building permits

Borough of Walnutport office

The borough's main office: first call for zoning, building permit and sewer questions inside Walnutport

610-767-1322

office@walnutportpa.org

417 Lincoln Avenue, Walnutport, PA 18088

Contact details are copied from each office’s official page and were checked against it on October 14, 2026.

Off-grid gear

Going off-grid in Borough of Walnutport means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Does Walnutport, PA have zoning, and what does it mean for your lot?

Yes. The Borough of Walnutport adopted its own zoning in Chapter 450 of the borough code, so zoning is decided by the borough, not by Northampton County1. The borough is divided into eight districts: recreation/conservation (RC), low-, medium- and high-density residential (R-1, R-2, R-3), town center (TC), town commercial/business (TCB), general commercial (GC) and industrial (I)4. Floodplain and steep slopes are overlay districts, so a lot in a flood area or on a steep slope can carry extra rules on top of its base district4.

Structures are limited to 35 feet in height, with a 15-foot limit for structures that are accessory to dwellings; principal buildings in the TC or GC districts can go up to 60 feet8. A permitted detached structure accessory to a dwelling needs at least 3 feet of side and rear yard setback, with exceptions10. We could not confirm lot sizes, principal-building setbacks, or whether RVs, tiny homes or accessory dwellings are allowed in a given district; ask the borough office which district a parcel sits in and what it permits.

Do you need a building permit in Walnutport, and who issues it?

Yes, for most construction. Pennsylvania's statewide Uniform Construction Code requires the owner or an authorized representative to obtain a building permit before beginning construction or building work5. Inside Walnutport, Chapter 165 of the borough code elects to administer and enforce the code locally, so the borough is the place to start2. County government does not issue these permits11.

Permit fees are set by borough resolution, and we could not confirm the amounts6. Pennsylvania lists some small projects that need no permit, such as fences up to 6 feet high, but only where the work breaks no other law or ordinance, and zoning still applies12. Agricultural buildings without habitable space are excluded from the state construction code13.

Call the borough office at 610-767-1322 to confirm who reviews plans and inspects work14.

How do septic and sewer work in Walnutport?

A building on an individual on-lot sewage system needs a permit from the local sewage agency before installation, construction, occupancy or use3. Pennsylvania lets municipalities, groups of municipalities or county health departments act as that agency, and we could not confirm which one serves Walnutport15. Ask the borough office who the sewage enforcement officer is.

Sewer connection is its own rule. Where an occupied building is within 150 feet of a borough sanitary sewer and can reach it, the owner must connect within 90 days after official notice, and the borough may build the connection if the owner refuses7. That means many lots inside the borough will be on public sewer rather than a septic field, so check whether a sewer line abuts the street before you plan an on-lot system.

Building a home in Walnutport: the steps, in order

  1. Ask the borough office which zoning district the parcel is in and what that district permits4.
  2. Check for floodplain or steep-slope overlays, which add rules in the borough4.
  3. If you are dividing land or developing a lot, expect review under the borough's subdivision and land development chapter16.
  4. Confirm sewer or on-lot septic: sewer connection where a line is close, or a septic permit from the local agency73.
  5. Apply for the building permit through the borough, which administers the state code2.
  6. A driveway that meets a state highway needs a PennDOT permit17.
  7. Pass the required inspections and get a certificate of occupancy before moving in18.

What stays with Northampton County, and what to check before you buy

Land outside the borough is not covered by Walnutport's rules; see the Northampton County page for unincorporated and township land. Septic is a local-agency or state matter rather than a zoning decision, so verify it separately for any address3.

Before you buy, confirm three things with the borough office. First, the district and any floodplain overlay, since a flood-area lot needs a floodplain development permit from the municipality before work begins19. Second, whether sewer is available7. Third, whether the lot is a legal buildable lot under the borough's subdivision rules16. A private water well drilled by a homeowner on their own land does not require the driller's license, though borough rules on wells were not confirmed20.

Watch-outs

  • We could not confirm the borough's permit fee amounts, its principal-building setbacks, minimum lot sizes, or its rules on RVs, tiny homes and accessory dwellings; ask the borough office6.
  • Search results for "Walnutport" often show Lehigh Township, which surrounds the borough and has its own zoning office; the township's rules do not apply inside the borough1.
  • Floodplain lots need a municipal floodplain development permit before work, in addition to a building permit19.

Sources

  1. Article IV: Districts - Borough of Walnutport, PA (Borough of Walnutport), quoted and re-checked
  2. Chapter 165: Construction Codes - Borough of Walnutport, PA (Borough of Walnutport), quoted and re-checked
  3. 25 Pa. Code § 72.22. Permit issuance (Pennsylvania statewide rule), quoted and re-checked
  4. Article IV: Districts - Borough of Walnutport, PA (Borough of Walnutport), quoted and re-checked
  5. Apply for a Uniform Construction Code Building Permit, quoted and re-checked
  6. Chapter 165: Construction Codes - Borough of Walnutport, PA (Borough of Walnutport), quoted and re-checked
  7. Chapter 346: Sewers and Sewage Disposal - Borough of Walnutport, PA (Borough of Walnutport), quoted and re-checked
  8. Article IV: Districts - Borough of Walnutport, PA (Borough of Walnutport), quoted and re-checked
  9. Contractor Licensing (Pennsylvania statewide rule), quoted and re-checked
  10. Article IV: Districts - Borough of Walnutport, PA (Borough of Walnutport), quoted and re-checked
  11. Pennsylvania Construction Code Act (Pennsylvania statewide rule), quoted and re-checked
  12. Part XIV, Uniform Construction Code, Chapter 403 Administration (Pennsylvania statewide rule), quoted and re-checked
  13. Pennsylvania Construction Code Act — Chapter 1 (Pennsylvania statewide rule), quoted and re-checked
  14. Borough of Walnutport office (walnutportpa.org)
  15. Municipal On Lot Sewage Service Areas, quoted and re-checked
  16. Table of Contents - Borough of Walnutport, PA - eCode360 (Borough of Walnutport), quoted and re-checked
  17. Apply for a PennDOT Highway Occupancy Permit (Pennsylvania statewide rule), quoted and re-checked
  18. Part XIV, Uniform Construction Code, Chapter 403 Administration (Pennsylvania statewide rule), quoted and re-checked
  19. PennsylvaniA Floodplain Development Guide (Pennsylvania statewide rule), quoted and re-checked
  20. Apply for a Water Well Drillers License and Rig Permit (Pennsylvania statewide rule), quoted and re-checked

Written October 14, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Borough of Walnutport

Borough of Walnutport’s own rules

  • Building code adoptedAdopted

    Construction in Walnutport borough

    • Article IV elects to administer and enforce the Uniform Construction Code; fees set by resolution; section text itself not opened
    “article iv uniform construction codes § 165-46 election to administer and enforce provisions. § 165-47 code incorporated by reference.”
  • Local zoningPresent

    Land inside Walnutport borough

    • Chapter 450 Zoning; eight districts plus floodplain and steep-slope overlay
    “for the purposes of this chapter, walnutport borough is hereby divided into the following zoning districts, with the following abbreviations:”
  • Zoning districtsPublished

    Zoning districts in Walnutport borough: RC, R-1, R-2, R-3, TC, TCB, GC, I

    • Official zoning map is part of Chapter 450
    • Floodplain and steep slopes are overlay districts
    “rc recreation/conservation district r-1 low-density residential district r-2 medium-density residential district r-3 high-density residential district tc town center district tcb town commercial/business district gc general commercial district i industrial district”
  • SetbacksDistrict specific (with conditions)

    Detached structures accessory to a dwelling in Walnutport borough; principal-building setbacks are in the dimensional table at the end of Chapter 450 (not read)

    • Garage no less than 5 feet from alley cartway
    • Must not obstruct sight clearance at intersections
    • No setback along a lot line where two dwellings are attached

    accessory structure side and rear setback: >= 3 feet

    “a three-foot-wide minimum side and rear yard setback shall apply for a permitted detached structure that is accessory to a dwelling, except:”
  • Building heightSpecified

    Structures in all Walnutport borough zoning districts including R-1 residential

    • Accessory structures to dwellings 15 feet maximum
    • Principal building up to 60 feet in TC or GC districts
    • See § 450-61 height exceptions

    maximum structure height: <= 35 feet (15 ft accessory to dwellings; 60 ft principal building in TC or GC)

    “the maximum height for structures shall be 35 feet, except as follows: (a) structures that are accessory to dwellings shall have a maximum height of 15 feet.”
  • Mandatory utility hookupSewer (with conditions)

    Occupied buildings in Walnutport borough abutting a street with a sanitary sewer

    • Connect within 90 days after official notice
    • Borough may construct the connection if owner refuses

    distance to sewer: <= 150 feet

    “where any part of such building is within 150 feet of said sewer and is accessible thereto, shall at his own expense install suitable sanitary facilities therein and connect such facilities directly with such sewer in accordance with the provisions of this article within 90 days after the date of official notice to do so”
  • Subdividing landRegulated (with conditions)

    Subdivision and land development in Walnutport borough

    • Chapter text not opened
    “chapter 395 subdivision and land development”
  • Permit feesVariable (with conditions)

    Uniform Construction Code permit fees in Walnutport borough

    • Fee amounts are in a resolution not reviewed
    “§ 165-51 fees to be established by resolution.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Borough of Walnutport or Northampton County directly.

  • Building permit — Building permits in Walnutport borough
  • Owner-builder exemption — Owner-builder exemption in Walnutport borough
  • Inspections — Building inspections in Walnutport borough
  • Certificate of occupancy — Certificates of occupancy in Walnutport borough
  • Minimum dwelling size — Minimum dwelling size in Walnutport borough
16 more unanswered
  • Minimum lot size
  • Lot coverage
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Agricultural exemption
  • Driveway access
  • Short-term rentals
  • Permit process

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Borough of Walnutport publishes no rule on the point, not that none exists. Northampton County’s page lists the county offices to call.

← All of Northampton County: county rules, score and offices