Building permits, zoning and septic in Borough of Shamokin Dam, Pennsylvania

The Borough of Shamokin Dam, Pennsylvania requires a building permit before residential construction covered by the Uniform Construction Code begins.1 Shamokin Dam also requires a borough zoning permit; Snyder County’s subdivision review does not replace borough approval.23 On-lot sewage questions go to the borough-designated Sewage Enforcement Officer, with Snyder County Planning Commission designated as the alternate enforcement agency.4

At a glance

Building permits
Required before UCC-covered residential construction; limited work is exempt.1
Zoning
Borough zoning permit required; contact Shamokin Dam Borough.25
Septic authority
Borough-designated Sewage Enforcement Officer; county Planning Commission is the alternate agency.4
Subdivision approval
County and borough planning commissions review; borough council approves.3
Owner-builder
No statewide license for most contractors; local requirements and building approval still need attention.61
Move-in approval
UCC-covered residential buildings need a certificate of occupancy.7

Who to call

Zoning

Shamokin Dam Borough Office

Borough contact for zoning applications and referrals to the building official, Sewage Enforcement Officer and Floodplain Administrator.

(570) 743-7565

lleitzel@shamokindam.net

42 West 8th Avenue PO Box 273 Shamokin Dam, PA 17876

Building permits

Central Keystone Council of Governments — Building Code Department

Contact the regional building-code office about building applications and inspections; the county’s Shamokin Dam directory links to its building-permits page.

(570) 522-1326

permits@ckcog.com

1610 Industrial Boulevard Suite 400A Lewisburg, PA 17837

Building permits

Central Keystone Council of Governments — Building Applications

Publishes building application submission instructions.

Septic permits

Shamokin Dam Borough Sewage Enforcement Officer

Borough-designated on-lot sewage enforcement office; ask the borough office for the current officer. The code identifies Snyder County Planning Commission as the alternate enforcement agency.

Contact details are copied from each office’s official page and were checked against it on October 15, 2026.

Off-grid gear

Going off-grid in Borough of Shamokin Dam means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Borough of Shamokin Dam, PA?

A new home in Shamokin Dam needs a building permit before UCC-covered residential construction begins.1 Pennsylvania exempts specified limited work, including ordinary repairs, but an exemption applies only where the work does not violate another law or ordinance.1 Borough zoning approval therefore remains a separate question for the proposed project.2

Doing the work yourself does not remove the building-permit requirement: Pennsylvania has no statewide license requirement for most contractors, while municipalities may impose local contractor requirements.61 Ask the borough office about local contractor requirements before arranging owner-built work.8

Who handles building applications in Borough of Shamokin Dam?

Contact the Shamokin Dam Borough Office at (570) 743-7565 for the borough side of a project, including the required zoning permit.85 For building-code questions, Central Keystone Council of Governments lists its Building Code Department and can be reached at (570) 522-1326 or permits@ckcog.com.9

CKCOG’s building-application instructions call for a completed application, complete construction drawings and required supporting documents such as zoning and sewer approvals.10 CKCOG accepts the form, drawings and supporting documents by mail or delivery.10 Request a project-specific building fee estimate and inspection schedule before submitting drawings.

Does Borough of Shamokin Dam have zoning and setback rules?

Shamokin Dam has borough zoning and requires a zoning permit; contact the borough for application guidance.25 We could not confirm district-specific minimum lot sizes, setbacks, dwelling floor areas or lot coverage limits; ask the borough zoning office for the district and dimensional standards for the parcel you intend to buy.8

For a subdivision or land development in Shamokin Dam, Snyder County Planning Commission and Shamokin Dam Planning Commission review the proposal, and borough council approves it.3 Bring both the proposed use and a site layout to the borough discussion so the zoning question and any land-development review can be addressed together.23

How do septic permits work inside Borough of Shamokin Dam?

Shamokin Dam’s code assigns sewage enforcement to a qualified Borough Code Enforcement Officer or another qualified person designated by borough council; Snyder County Planning Commission is the alternate enforcement agency.4 Ask the borough office to identify the current Sewage Enforcement Officer and confirm the parcel’s sewer-service situation before commissioning an on-lot system.84

Pennsylvania generally requires a local-agency septic permit before installing, contracting for construction of, or using a building served by an on-lot sewage system, subject to specific exceptions.11 We could not confirm the borough’s mandatory sewer-connection rules or whether an on-lot system would be acceptable on a particular parcel; take those questions to the borough and its Sewage Enforcement Officer.84

Can you live in an RV or tiny home in Borough of Shamokin Dam?

We could not confirm permission for full-time RV living, temporary camping during construction, tiny homes, manufactured homes or accessory dwellings in Shamokin Dam; ask the borough zoning office about the exact dwelling type and intended occupancy.8 Borough zoning approval is required, so get an answer for the proposed use before buying an RV or ordering a small dwelling.2

For a tiny home regulated as a residential building under Pennsylvania’s UCC, the building-permit and certificate-of-occupancy requirements still apply.17 A construction plan alone is not permission to move into a UCC-covered residential building before the building official issues its certificate of occupancy.7

Building a home in Borough of Shamokin Dam: what comes first?

  1. Take the parcel and proposed use to Shamokin Dam Borough for zoning approval and, if relevant, the borough’s subdivision or land-development review.53
  2. Resolve sewer service or on-lot sewage approval with the borough and its designated Sewage Enforcement Officer.8411
  3. Prepare the building application, construction drawings and required supporting approvals using CKCOG’s submission instructions; obtain the required building permit before covered work starts.101
  4. Notify the construction code official when work is ready for inspection and keep permitted construction accessible.12
  5. Complete the final inspection and obtain the residential certificate of occupancy before moving in.127

What should you check before buying land in Borough of Shamokin Dam?

Ask the borough to identify the Floodplain Administrator and determine whether the proposed building site lies in a Special Flood Hazard Area; Pennsylvania requires a municipal floodplain development permit or equivalent before development there.813 A driveway built or changed on state highway land, or connecting to a PennDOT drainage facility, needs PennDOT highway occupancy approval.14

We could not confirm borough well-permit or water-connection requirements; ask the borough office before planning private water service.8 For property outside borough limits, consult the Snyder County guide and identify the municipality responsible for the parcel’s zoning rather than carrying Shamokin Dam’s zoning answer across the boundary.15

Watch-outs

  • Shamokin Dam’s zoning permit is separate from the building permit required for UCC-covered work; resolve both before starting a home.21
  • Snyder County Planning Commission participates in Shamokin Dam subdivision review, but borough council grants subdivision and land-development approval.3
  • Confirm RV or tiny-home occupancy with Shamokin Dam Borough before relying on either as temporary housing during construction.8

Sources

  1. Part XIV, Uniform Construction Code, Chapter 403 Administration (Pennsylvania statewide rule), quoted and re-checked
  2. Shamokin Dam Borough, PA Code of Ordinances overview (Borough of Shamokin Dam), quoted and re-checked
  3. Shamokin Dam Borough – Snyder County, PA Government (Borough of Shamokin Dam), quoted and re-checked
  4. Shamokin Dam Borough Sewage Enforcement Officer (codelibrary.amlegal.com)
  5. Shamokin Dam Borough – Snyder County, PA Government (Borough of Shamokin Dam), quoted and re-checked
  6. Contractor Licensing (Pennsylvania statewide rule), quoted and re-checked
  7. Part XIV, Uniform Construction Code, Chapter 403 Administration (Pennsylvania statewide rule), quoted and re-checked
  8. Shamokin Dam Borough Office (shamokindam.net)
  9. Central Keystone Council of Governments — Building Code Department (ckcog.com)
  10. Central Keystone Council of Governments — Building Applications (ckcog.com)
  11. 25 Pa. Code § 72.22. Permit issuance (Pennsylvania statewide rule), quoted and re-checked
  12. Part XIV, Uniform Construction Code, Chapter 403 Administration (Pennsylvania statewide rule), quoted and re-checked
  13. PennsylvaniA Floodplain Development Guide (Pennsylvania statewide rule), quoted and re-checked
  14. Apply for a PennDOT Highway Occupancy Permit (Pennsylvania statewide rule), quoted and re-checked
  15. Planning Commission – Snyder County, PA Government, quoted and re-checked

Written October 15, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Borough of Shamokin Dam

Borough of Shamokin Dam’s own rules

  • Local zoningPresent (with conditions)

    Land inside Shamokin Dam borough; the borough's code of ordinances contains a zoning chapter (Chapter 27) and a zoning permit is required

    • Zoning chapter text itself was not read; district rules not verified
    “zoning permit is required. contact shamokin dam borough for more information.”
  • Subdividing landRegulated (with conditions)

    Subdivisions and land developments inside Shamokin Dam borough

    • Reviewed by Snyder County Planning Commission and Shamokin Dam Planning Commission
    • Approved by borough council
    • Code Chapter 22 is subdivision and land development
    “subdivisions / land developments are reviewed by the snyder county planning commission and the shamokin dam planning commission and approved by the shamokin dam borough council.”
  • Permit processPartial

    Zoning permits inside Shamokin Dam borough

    • County page only says to contact the borough for more information
    “zoning permit is required. contact shamokin dam borough for more information.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Borough of Shamokin Dam or Snyder County directly.

  • Building permit — Building permits inside Shamokin Dam borough
  • Owner-builder exemption — Owner-builder exemption inside Shamokin Dam borough
  • Building code adopted — Building code inside Shamokin Dam borough
  • Inspections — Building inspections inside Shamokin Dam borough
  • Certificate of occupancy — Certificates of occupancy inside Shamokin Dam borough
22 more unanswered
  • Zoning districts
  • Minimum dwelling size
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Driveway access
  • Building in a floodplain
  • Short-term rentals
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Borough of Shamokin Dam publishes no rule on the point, not that none exists. Snyder County’s page lists the county offices to call.

← All of Snyder County: county rules, score and offices