Borough of Spring Grove, Pennsylvania requires building permits and administers its own building code; borough zoning also applies.12 For a property in York County served by an on-lot sewage system, Pennsylvania generally requires a septic permit from the local agency, with DEP providing oversight.34 Start with the borough office for building and zoning applications and to identify the current sewage-enforcement contact.5
At a glance
- Building permits
- Required; borough administers the building code1
- Zoning
- Borough zoning applies2
- Lot area
- Town Residential: minimum 4,000 square feet per dwelling unit; not a boroughwide figure6
- Septic permits
- Generally required for on-lot systems; local agency issues, DEP oversees34
- Owner work
- Uncompensated owner work has a home-improvement-law exclusion, not a building-permit waiver78
- Move-in approval
- Residential UCC certificate of occupancy required9
Who to call
Planning & zoning
Starting point for borough building and zoning application forms and requests for the current sewage-enforcement contact
1 Campus Avenue Spring Grove, PA
Building permits
Spring Grove Borough Building Code Official
Borough building-code administration, building applications and coordinated occupancy approvals
Septic permits
Pennsylvania DEP Southcentral Regional Office — Clean Water
Regional state contact for sewage-program oversight and referrals; local agencies issue ordinary on-lot sewage permits
909 Elmerton Ave Harrisburg, PA 17110
Contact details are copied from each office’s official page and were checked against it on October 14, 2026.
Off-grid gear
Going off-grid in Borough of Spring Grove means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Borough of Spring Grove, PA?
Spring Grove requires a permit for building and structural work and has elected to administer Pennsylvania's Uniform Construction Code locally.1 Pennsylvania requires a building permit before covered residential construction, alterations and regulated systems work begins, subject to the state's scope exclusions and limited-work exemptions.8 Do not treat an owner doing the work as a building-permit exemption: Pennsylvania's exclusion for uncompensated owner work concerns home-improvement regulation, while covered residential work still requires a building permit.78
Who handles building and zoning applications in Borough of Spring Grove?
Spring Grove's general-forms page provides building-permit, zoning-permit and renovation-demolition application forms.5 Contact the Spring Grove Borough Office for those forms and ask to be connected with the Building Code Official and Zoning Enforcement Officer.51 A building application must describe the exact location, extent and character of the proposed construction, repair or alteration.1 Before move-in, Spring Grove requires the applicant to request the coordinated inspections and certificates from both the Building Code Official and Zoning Enforcement Officer.1
Does Borough of Spring Grove have zoning for RVs, tiny homes and setbacks?
Spring Grove has a borough zoning ordinance; a lack of countywide zoning does not remove Spring Grove's local zoning requirements.2 In Spring Grove's Town Residential district, the minimum lot area is 4,000 square feet per dwelling unit, with variance requests handled through the Zoning Hearing Board.6 That figure applies to the named district, rather than every property in Spring Grove.6 We could not confirm Spring Grove's rules for living in an RV, tiny-home occupancy, minimum dwelling size or district setbacks; ask the borough office to obtain a parcel-specific zoning answer before buying for those uses.5
How do septic permits and sewer connections work in Borough of Spring Grove?
For a new Spring Grove building connecting to public or community sewer, the Building Code Official requires satisfactory evidence of an irrevocable right to connect with enough capacity for the proposed use.1 Pennsylvania generally requires a local-agency septic permit before installation, construction or use of a building served by an on-lot sewage system, subject to specific exceptions.3 Local agencies administer on-lot sewage permitting; DEP supplies oversight.4 Ask the borough office to identify the current sewage-enforcement agency, or contact DEP's Southcentral Clean Water office for a referral.510 A composting toilet in a new residence still needs approved washwater or excess-liquid disposal under Pennsylvania's sanitation rules.11
Building a home in Borough of Spring Grove: what comes first?
Start by asking the borough office for zoning review of your proposed use and the applicable building and zoning forms.52 Establish the sewer connection right and capacity for a public-sewer project, or obtain the required local-agency septic approval for an on-lot project.13 Obtain the residential building permit before covered construction begins, then notify the construction code official as work becomes ready for inspection and keep the work accessible.812 Request Spring Grove's coordinated building and zoning final approvals before occupancy; a residential UCC building cannot be occupied without its certificate of occupancy.19 For land outside the borough, consult the York County guide; Spring Grove's zoning applies inside the borough.2
Watch-outs
- Spring Grove's Town Residential lot-area requirement is district-specific; do not use it as a boroughwide lot-size standard.6
- We could not confirm local RV or tiny-home occupancy rules; ask the borough office for the applicable zoning determination before planning either use.5
- A new residence using a composting toilet still needs approved disposal of washwater or excess liquid under Pennsylvania rules.11
Sources
- Spring Grove Borough Building Code Official (ecode360.com)
- Borough of Spring Grove, PA – eCode360 table of contents (Borough of Spring Grove), quoted and re-checked
- 25 Pa. Code § 72.22. Permit issuance (Pennsylvania statewide rule), quoted and re-checked
- Act 537 Sewage Facilities (Pennsylvania statewide rule), quoted and re-checked
- Spring Grove Borough Office (springgrovepa.gov)
- Spring Grove Borough Zoning Hearing Board agenda, April 16, 2026 (Borough of Spring Grove), quoted and re-checked
- Contractor Licensing (Pennsylvania statewide rule), quoted and re-checked
- Part XIV, Uniform Construction Code, Chapter 403 Administration (Pennsylvania statewide rule), quoted and re-checked
- Part XIV, Uniform Construction Code, Chapter 403 Administration (Pennsylvania statewide rule), quoted and re-checked
- Pennsylvania DEP Southcentral Regional Office — Clean Water (pa.gov)
- 25 Pa. Code § 73.65. Recycling toilet, incinerating toilet or composting toilet (Pennsylvania statewide rule), quoted and re-checked
- Part XIV, Uniform Construction Code, Chapter 403 Administration (Pennsylvania statewide rule), quoted and re-checked
Written October 14, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.