Bolthole Index

Cass County, Texas

Zoning, building permits and septic rules in Queen City, Texas

Queen City is a city in Cass County, Texas. 8 rules below are quoted from official sources and independently re-checked, most recently on October 24, 2026. Rules for unincorporated land are on the Cass County page.

Answers from the rulebook for Queen City

Queen City’s own rules

  • Building permitRequired

    Work regulated by the city's plumbing code, including construction or alteration of a building or plumbing system, inside Queen City city limits

    • Exempt work includes specified minor leak and stoppage repairs; exemption does not authorize work violating another city law or ordinance.
    “Any owner, authorized agent, or contractor who desires to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert or replace any plumbing system, the installation of which is regulated by this code, or to cause any such work to be done, shall first made application to the plumbing inspector and obtain the required permit for the work.”
  • Building code adoptedAdopted (with conditions)

    Structures within Queen City corporate limits

    • The ordinance identifies the latest 2009 International Codes edition on file and states future updates are automatically adopted.
    “Certain documents, being marked and designated as the full range of International Codes, with the latest 2009 edition being on file in the office of the city secretary and the city, including appendix chapters, as published by the International Code Council, are hereby adopted as the code of the city in their entirety, for regulating the design, construction, quality of materials, erection, installation, alteration, repair, location, replacement, addition to, use or maintenance of any and all structures within the corporate limits of the city.”
  • InspectionsRequired

    Plumbing work inside Queen City city limits

    • Applies to plumbing work for compliance with the plumbing division and adopted plumbing code.
    “It shall be the duty of the plumbing inspector to inspect and test all plumbing work for compliance with this division and the plumbing code adopted by this article and to enforce changing of such installations that do not meet the requirements.”
  • Living in an RVProhibited

    Recreational vehicles inside Queen City city limits

    • Exception: occupancy is allowed in approved recreational vehicle parks.
    “Recreational vehicles shall not be occupied while in the city except in approved recreational vehicle parks.”
  • Agricultural exemptionConditional

    Abandoned or unoccupied mobile homes or mobile home parks inside Queen City city limits

    • Applies only to non-profit organizations and ag-exempt businesses qualifying under Texas exemption law, and only to the cited abandoned-mobile-home removal code.
    “Non-profit organizations and ag-exempt businesses that qualify under Texas State Law concerning exemptions are exempt from this code.”
  • Building in a floodplainRequired

    Floodplain development inside Queen City city limits

    • Application goes to the floodplain administrator on supplied forms.
    • Application may require duplicate scale plans, dimensions and elevations, proposed structures and landscape alterations, and relation to special flood hazard areas.
    “Application for a floodplain development permit shall be presented to the floodplain administrator on forms furnished by him/her and may include, but not be limited to, plans in duplicate drawn to scale showing the location, dimensions, and elevation of proposed landscape alterations, existing and proposed structures, including the placement of manufactured homes, and the location of the foregoing in relation to areas of special flood hazard.”
  • Permit feesPublished (with conditions)

    Building permits and inspections inside Queen City city limits

    • All permit fees double for projects started without a permit.

    new residential permit fee: per 0.18 USD per square foot (Minimum $50.00) · new residential minimum fee: >= 50 USD (New residential) · residential certificate of occupancy fee: 5 USD

    “New residential $0.18 per sq. ft., minimum $50.00”
  • Permit processPublished (with conditions)

    Work regulated by the city plumbing code inside Queen City city limits

    • Application must be made to the plumbing inspector and the required permit obtained before regulated work.
    • Specified exempt work remains subject to all other laws and ordinances.
    “Any owner, authorized agent, or contractor who desires to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert or replace any plumbing system, the installation of which is regulated by this code, or to cause any such work to be done, shall first made application to the plumbing inspector and obtain the required permit for the work.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Queen City or Cass County directly.

  • Owner-builder exemption — Owner-built residential work inside Queen City city limits
  • Certificate of occupancy — Occupancy of buildings inside Queen City city limits
  • Local zoning — Land inside Queen City city limits
  • Zoning districts — Land inside Queen City city limits
  • Minimum dwelling size — Dwellings inside Queen City city limits
14 more unanswered
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Camping on your land
  • Tiny homes
  • Accessory dwellings
  • Septic permit
  • Septic inspection
  • Well permit
  • Mandatory utility hookup
  • Subdividing land
  • Driveway access
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Queen City publishes no rule on the point, not that none exists. Cass County’s page lists the county offices to call.

Off-grid gear

Going off-grid in Queen City means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

← All of Cass County: county rules, score and offices