Winkler County, Texas
Kermit is a city in Winkler County, Texas. 5 rules below are quoted from official sources and independently re-checked, most recently on October 24, 2026. Rules for unincorporated land are on the Winkler County page.
Recreational-vehicle parks inside Kermit city limits.
annual inspection frequency: per 1 inspection per RV park (Additional inspections are allowed as necessary.)
“The city building official or designee shall make one (1) annual inspection per RV park and additional inspections as are necessary, without prior notice, to determine compliance with this article.”
RV parks and RV sites inside Kermit city limits where City sewer service is unavailable.
“In the event that city sewer services are not available, such waste shall be discharged into a private disposal system approved by the Texas Commission on Environmental Quality (TCEQ).”
RV parks and RV sites inside Kermit city limits.
minimum sewer piping diameter: >= 4 inches
“Potable water for each RV park or RV site shall be provided by the city’s water supply system and utilize a master meter, separate from any other water service that supplies any existing residence or business upon or adjoining the owner’s property. [...] Each RV park or RV site must discharge into the city’s public sewer system and utilize a minimum of four-inch diameter piping, separate from any other sewer service that supplies any existing residence or business upon or adjoining the owner’s property.”
City building permits and inspections inside Kermit city limits.
“Permit and inspection fees shall be paid to the city before the issuance of a permit and before any work is started. Where work for which a permit is required by these codes is started or proceeded with prior to receiving a permit, the permit fee shall be doubled.”
Appeals from building-official permit decisions inside Kermit city limits.
appeal filing deadline: <= 30 days
“Whenever the building official shall disapprove an application or refuse to grant a permit applied for, or when it is claimed the provisions of the referenced codes do not apply or that the true intent and meaning of the codes have been misconstrued or wrongly interpreted, the applicant may appeal from the decision of the building official to the mayor and city council within 30 days from the date of the decision appealed.”
We looked and could not find an official answer yet. Silence is not permission; ask Kermit or Winkler County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Kermit publishes no rule on the point, not that none exists. Winkler County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Kermit means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.