Holladay is a city in Salt Lake County, Utah. Holladay adopts its own zoning, so inside its limits Holladay’s rules apply, not the county’s. 7 rules below are quoted from official sources and independently re-checked, most recently on October 24, 2026. Rules for unincorporated land are on the Salt Lake County page.
Building construction, alteration, remodeling, and repair in Holladay city.
“As provided in title 15a of the Utah code, the building code, national electrical code, residential one- and two-family dwelling code, plumbing code, mechanical code, fuel gas code, energy conservation code, and manufactured housing installation standard code as adopted by the uniform building code commission (collectively, the “state building code”) shall be applied to building construction, alteration, remodeling and repair, and in the regulation of building construction, alteration, remodeling and repair in the city.”
Use or occupancy of any lot, parcel, or building inside Holladay city limits.
“No lot, parcel, or building shall be used or occupied until a certificate of occupancy has been issued pursuant to applicable provisions of building codes and regulations adopted by the city.”
Land inside Holladay city limits.
“For the purpose of this title, the City is divided into the following classes of zones:”
Zoning districts inside Holladay city limits.
“Forestry and Recreation Zone | FR-0.5 [...] Residential Zone | R-1-4 [...] Professional Office Zone | PO [...] Commercial Zone | C-1 [...] Limited Use Zone | LU [...] Regional/Mixed-Use Zone | R/M-U [...] Holladay Village Zone | HV [...] Foothills and Canyons Overlay Zone | FCOZ”
Utility service to structures, buildings, equipment, or wiring for which a permit is required inside Holladay city limits.
“It shall be unlawful for any utility company to provide service to any structure or building, or to service equipment or wiring for which a permit is required, until approval is granted by the building official. The building official may order the utility services terminated at any location where the use is not authorized or is in violation of the building, land use or other ordinances of the city.”
Plan review and building-department services inside Holladay city limits.
plan review fee for other R-3 and U occupancies: 40 percent of building permit fee · plan review fee for all other occupancies: 65 percent of building permit fee
“Forty percent (40%) of the building permit for other R-3 and U occupancies; and [...] Sixty five percent (65%) of the building permit fee for all other occupancies.”
Projects requiring submittal documents inside Holladay city limits.
“When submittal documents are required by section 106.3.2 of the 1997 uniform building code, a plan review fee shall be paid at the time of submitting the submittal documents for review.”
We looked and could not find an official answer yet. Silence is not permission; ask Holladay or Salt Lake County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Holladay publishes no rule on the point, not that none exists. Salt Lake County’s page lists the county offices to call.