Othello is a city in Adams County, Washington. Othello adopts its own zoning, so inside its limits Othello’s rules apply, not the county’s. 7 rules below are quoted from official sources and independently re-checked, most recently on October 24, 2026. Rules for unincorporated land are on the Adams County page.
Development and building work inside Othello city limits where a permit is required by Chapter 14.04.
“Whenever any work for which a permit is required by this code has been commenced without first obtaining said permit, a special investigation shall be made before a permit may be issued for such work.”
Buildings and construction inside Othello city limits.
“Pursuant to Chapters 19.27 and 35A.12 RCW, the State Building Code is established. The following appendices to the State Building Code are adopted for use within the city:”
Use or occupancy of any residential, commercial, or industrial building inside Othello city limits.
“Notwithstanding any provision of the International Building Code or the International Residential Code to the contrary, a certificate of occupancy must be issued or deemed to have been issued by the building official prior to the use or occupancy of any building, residential, commercial or industrial.”
Land inside Othello city limits.
“The Zoning Code sets the specific rules for how development takes place”
Placement of manufactured or mobile homes inside Othello city limits.
“No person, firm, or corporation as the owner, buyer, or vendor of a manufactured home or as manufactured home park management shall cause or permit any manufactured home to be located, placed or set within the corporate limits of the city without first having secured a proper manufactured home placement permit.”
A City-platted lot lacking extensions or provision of City water and City sewer, when applying for a development or building permit.
“Any lot so affected shall be permitted to develop and a building permit will be issued upon the installation of city water, city sewer, storm drains, curbs, sidewalks, streets and other improvements to community standards, including fire protection devices, or upon the posting of security in an amount approved by the city, which is equal to the estimated cost of the extensions and/or improvements remaining to be installed through the lot, in a form acceptable to the city attorney to insure the construction of the required improvements and extensions at the same time as construction of the building for which the building permit was issued or at the time of the improvement of the affected lot.”
Building permits for unplatted land inside Othello city limits.
“Building permits shall be issued only for structures located within recorded plats except as provided in this chapter.”
We looked and could not find an official answer yet. Silence is not permission; ask Othello or Adams County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Othello publishes no rule on the point, not that none exists. Adams County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Othello means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.