Clark County, Washington
La Center is a city in Clark County, Washington. La Center adopts its own zoning, so inside its limits La Center’s rules apply, not the county’s. 8 rules below are quoted from official sources and independently re-checked, most recently on October 24, 2026. Rules for unincorporated land are on the Clark County page.
Buildings and building-related work inside La Center city limits.
“International Building Code (IBC), 2021 Edition [...] are hereby adopted”
Land inside La Center city limits.
“The city shall zone land as LDR-7.5 that has the following characteristics:”
Individual lots in an LDR-7.5 subdivision inside La Center city limits.
minimum individual lot area: 7500 square feet (Subdivision without a density transfer pursuant to Chapter 18.300 LCMC) · reduced lot area: 6000 square feet (Up to 20 percent of individual single-family detached lots with an approved critical-areas density transfer) · duplex minimum lot area: 10000 square feet
“Minimum size for individual lots in a subdivision without a density transfer pursuant to Chapter 18.300 LCMC is 7,500 square feet.”
LDR-7.5 lots inside La Center city limits.
minimum front setback: 20 feet (LDR-7.5 table; subject to stated reductions and averaging) · minimum side setback: 7.5 feet (LDR-7.5 table) · minimum street-side setback: 10 feet (LDR-7.5 table) · minimum rear setback: 15 garage; 20 living area feet (LDR-7.5 table)
“LDR-7.5 | 60 | 90 | 20 | 20 | 7.5 | 10 | 15 (garage)20 (living area)”
LDR-7.5 lots inside La Center city limits.
maximum building lot coverage: <= 35 percent · maximum impervious surface area: <= 50 percent
“Maximum building lot coverage shall not exceed 35 percent. Maximum impervious surface area shall not exceed 50 percent.”
Buildings in all LDR districts inside La Center city limits.
maximum principal building height: <= 35 feet (Measured from lowest finished grade level to highest point on roof) · maximum detached garage height: <= 18 feet
“The maximum building height in all LDR districts shall be 35 feet measured from the lowest finished grade level to the highest point on the roof.”
Building and development permits inside La Center city limits.
building plan-review fee: 65 percent of building fee (Minimum plan-review fee is $25.00) · minimum building permit fee: 25 USD (For valuation from $1.00 through $500.00)
“The fees for building and development permits are as set forth in Table A below.”
New commercial and residential construction and land development inside La Center city limits.
“Plans shall be submitted to and approved by the building official for all new commercial building and residential construction or land development”
We looked and could not find an official answer yet. Silence is not permission; ask La Center or Clark County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that La Center publishes no rule on the point, not that none exists. Clark County’s page lists the county offices to call.
Off-grid gear
Going off-grid in La Center means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.