King County, Washington
Town of Hunts Point is a town in King County, Washington. Town of Hunts Point adopts its own zoning, so inside its limits Town of Hunts Point’s rules apply, not the county’s. 8 rules below are quoted from official sources and independently re-checked, most recently on October 24, 2026. Rules for unincorporated land are on the King County page.
Construction, alteration, repair, demolition, occupancy changes, and regulated electrical, gas, mechanical, or plumbing work inside Hunts Point town.
“shall first make application to the building official and obtain the required permit.”
All construction activity and construction materials in Hunts Point town.
code edition: 2021 (With amendments, except where noted.)
“All codes referenced above are hereby adopted by reference and included as if set forth in their entirety.”
Work authorized by a Town building permit inside Hunts Point town.
final-inspection deadline: <= 540 calendar days (Measured from permit issuance; subject to stated extension and renewal provisions.)
“All work authorized by permit shall be completed and final inspections made and the completed work under the permit approved within five hundred forty (540) calendar days”
Land inside Hunts Point town limits, including the R-20 residential zone.
“The following bulk and area regulations apply to each zoning lot or lot of record:”
Accessory dwelling units in the R-20 zone inside Hunts Point town.
maximum ADU floor area: <= 1250 square feet
“No more than one accessory dwelling unit, subordinate to and either attached to or detached from the primary residential building, may be constructed or occupied on each zoning lot or lot of record.”
Driveways serving lots in Hunts Point's R-20 zone.
driveways per lot: 1 driveway · maximum driveway width: <= 20 feet (In the public right-of-way.)
“Each lot shall use one driveway which has a maximum width of 20 feet in the public right-of-way.”
Town building permits inside Hunts Point town.
additional inspection fee for qualifying extension: 20 percent of original plan review fee (Only where the Building Official finds the extension reasons acceptable and the stated requirements are met.) · administrative extension fee: 50 USD (Only where the Building Official finds the extension reasons acceptable and the stated requirements are met.)
“An additional inspection fee equal to twenty percent (20%) of the original plan review fee and an additional administrative extension fee of fifty dollars ($50.00) is paid.”
Regulated building work inside Hunts Point town.
“Submittal of all application elements are necessary to begin processing the building permit. The application shall be accompanied by the fee as set forth by resolution.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Hunts Point or King County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Hunts Point publishes no rule on the point, not that none exists. King County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Hunts Point means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.