Building permits, zoning and septic in University Place, Washington

University Place, Washington has city zoning and adopted building codes; start a home-building application with the city, which publishes residential application forms and submittal requirements.123 In Pierce County, University Place’s residential checklist requires health department approval for a septic system at application submittal and names Tacoma-Pierce County Health Department as the contact.4

At a glance

Building applications
City residential application and submittal checklist3
Zoning
City zoning applies inside University Place1
Septic
Health department approval required at building application submittal4
Tiny houses
State building code applies; local location and installation approval still needed5
Owner-builder
Conditional contractor-registration exemption; building requirements still apply6
Subdivision
City subdivision regulations apply7

Who to call

Building permits

University Place Development Services Department

Residential building application forms and application processing

253.566.5656

Permits@cityofup.com

3609 Market Place West, Suite 200

Zoning

University Place Planning & Development Services

Residential plan requirements, utility prerequisites and project questions

Septic permits

Tacoma-Pierce County Health Department

Septic-system approval identified in the city residential submittal checklist

Contact details are copied from each office’s official page and were checked against it on October 15, 2026.

Off-grid gear

Going off-grid in University Place means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Does University Place have zoning, and what does it mean for a lot?

University Place has its own zoning regulations, and land subdivision is also regulated by the city.17 We could not confirm district-specific minimum lot sizes, setbacks, lot coverage or height limits; ask University Place Planning & Development Services to identify the parcel’s district and the standards for your proposed home.8 Before buying land to split, request a city subdivision review: Washington requires subdivision approval to conform to applicable zoning and other land-use controls.9

Do you need a building permit in University Place, and who issues it?

University Place has adopted the 2021 international building codes, uniform plumbing code and Washington state energy code.2 The city provides a Residential Building Application and Residential Submittal Requirements, and directs completed applications to Permits@cityofup.com for processing.3 Start with that city application counter to establish the building permit requirements for your project.3 Ask Planning & Development Services which drawings and supporting documents apply; the city requires plans to show the location, nature and extent of proposed work and conform to adopted codes and city ordinances.8

How do septic permits work inside University Place?

University Place’s residential checklist requires health department approval of a septic system at building permit submittal and directs septic questions to Tacoma-Pierce County Health Department.4 Washington requires a septic permit before installing, repairing, modifying, connecting to or expanding an on-site sewage system, except for minor repairs.10 Ask the health department about the proposed system before finalizing the house plan: the state application requirements include the drinking-water source, sewer-utility status, soil and site evaluation, site plan and detailed system design.10

Can you live in an RV or tiny home in University Place?

We could not confirm permission to occupy an RV on a private University Place lot; ask the city about the intended use and duration before buying an RV for that purpose.1 Washington’s tiny-house guidance requires compliance with the state building code and local building-department requirements for foundation, installation and location.5 A tiny house meeting the state construction standard still needs local location approval, so ask University Place to review the specific parcel and design before ordering a home.5

Building a home in University Place: what steps come first?

  1. Ask the city to identify the parcel’s zoning requirements and review the proposed use before preparing the building application.1
  2. Resolve wastewater approval: the city checklist requires septic approval at application submittal and sewer permits before building permit issuance.48
  3. Use the city’s residential application and submittal checklist, then send completed applications to the city’s permit email.3
  4. Ask about driveway and utility work: the city checklist requires separate right-of-way permits and financial guarantees for their installation.8

What should you check before buying land in University Place?

Ask University Place Planning & Development Services for the current project checklist and the requirements for driveway approaches and utilities.8 Washington’s owner-builder exemption concerns contractor registration and does not remove applicable building, electrical, plumbing, mechanical, land-use or inspection requirements; work performed to sell, demolish or lease the property is outside the own-property exemption.6 For a property outside University Place city limits, use the Pierce County guide for the county’s building permit and zoning answers for unincorporated land.1112

Watch-outs

  • We could not confirm University Place’s RV occupancy, ADU or district-specific dimensional rules; ask the city before committing to a lot or home design.1
  • University Place’s residential checklist requires sewer permits before building permit issuance and septic-system approval at application submittal.84

Sources

  1. City of University Place, WA Municipal Code table of contents (eCode360) (University Place), quoted and re-checked
  2. University Place Ordinance 778 amending Chapter 14.05 Building and Construction Code (University Place), quoted and re-checked
  3. University Place Development Services Department (cityofup.com)
  4. Tacoma-Pierce County Health Department (cityofup.com)
  5. Tiny Houses (Washington statewide rule), quoted and re-checked
  6. RCW 18.27.090 — Exemptions (Washington statewide rule), quoted and re-checked
  7. City of University Place, WA Municipal Code table of contents (eCode360) (University Place), quoted and re-checked
  8. University Place Planning & Development Services (cityofup.com)
  9. RCW 58.17.030 — Subdivisions to comply with chapter, local regulations (Washington statewide rule), quoted and re-checked
  10. WAC 246-272A-0200 Permit requirements (Washington statewide rule), quoted and re-checked
  11. Residential (2026 county census)
  12. Codes Administered by PPW (2026 county census)

Written October 15, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for University Place

University Place’s own rules

  • Building code adoptedAdopted

    Building and construction inside University Place city; Chapter 14.05 adopts the 2021 international building codes, uniform plumbing code and Washington state energy code

    • Does not apply to vested permit applications under prior codes or to enforcement of prior codes.
    • Takes effect on the later of 5 days from publication or March 15, 2024.

    adopted codes: 2021 International Building Codes, 2021 Uniform Plumbing Code, 2021 Washington State Energy Code

    “by adopting by reference the 2021 international building codes, 2021 uniform plumbing code and the 2021 washington state energy code”
  • Local zoningPresent

    Land inside University Place city limits

    • Only the code table of contents was read; district-level rules were not opened.
    “title 19 zoning (§ 19.05.010 – § 19.85.100)”
  • Subdividing landRegulated (with conditions)

    Land subdivision inside University Place city

    • Details of Title 21 were not opened.
    “title 21 subdivision regulations (§ 21.05.010 – § 21.75.040)”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask University Place or Pierce County directly.

  • Building permit — Building permits inside University Place city
  • Owner-builder exemption — Owner-builder exemption inside University Place city
  • Inspections — Building inspections inside University Place city
  • Certificate of occupancy — Certificates of occupancy inside University Place city
  • Zoning districts — Zoning districts inside University Place city
22 more unanswered
  • Minimum dwelling size
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Driveway access
  • Building in a floodplain
  • Short-term rentals
  • Permit fees
  • Permit process

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that University Place publishes no rule on the point, not that none exists. Pierce County’s page lists the county offices to call.

← All of Pierce County: county rules, score and offices