Town of Gilbert is a town in Mingo County, West Virginia. Septic permits inside Town of Gilbert come from Town of Gilbert. 12 rules below are quoted from official sources and independently re-checked, most recently on October 24, 2026. Rules for unincorporated land are on the Mingo County page.
Development, new construction, substantial improvement, substantial-damage repair, and structure placement or relocation within Gilbert town
“It shall be unlawful for any contractor, person, partnership, business, or corporation to undertake, or cause to be undertaken, any development or the new construction, substantial improvement, repair of substantial damage, or the placement or relocation of any structure (including manufactured homes) within the town, unless a permit application and standard site plan has been completed, and a permit has been obtained from the Floodplain Administrator.”
Structures erected or removed throughout Gilbert town
“There is hereby adopted and incorporated by reference as if set out at length herein for the purpose of safeguarding life and property and to ensure the quality of construction of all structures erected or removed throughout the municipality that certain code know as the State Building Code as promulgated by the Fire Marshal under W. Va. Code § 29-3-5b.”
Construction and development covered by Gilbert's floodplain chapter
“During the construction period, the Floodplain Administrator or other authorized official may inspect the premises to determine that the work is progressing in compliance with the information provided on the permit application and with all applicable laws and ordinances.”
Land inside Gilbert town that is partially or fully in a special flood hazard area
“In addition, where land that is either partially or fully in the special flood hazard area is to be subdivided, utilized for a manufactured home park or subdivision, or otherwise developed, a detailed site plan shall be submitted to, and approved by, the Floodplain Administrator prior to any development.”
Development, new construction, substantial improvement, substantial-damage repair, or structure placement or relocation within Gilbert town
“In addition, where land that is either partially or fully in the special flood hazard area is to be subdivided, utilized for a manufactured home park or subdivision, or otherwise developed, a detailed site plan shall be submitted to, and approved by, the Floodplain Administrator prior to any development.”
Floodplain determinations and development regulated by Gilbert's floodplain chapter
“A floodplain determination fee shall be assessed on all proposed development. This shall be a flat fee approved by the town.”
Development and construction inside Gilbert town regulated by the floodplain chapter
“It shall be unlawful for any contractor, person, partnership, business, or corporation to undertake, or cause to be undertaken, any development or the new construction, substantial improvement, repair of substantial damage, or the placement or relocation of any structure (including manufactured homes) within the town, unless a permit application and standard site plan has been completed, and a permit has been obtained from the Floodplain Administrator.”
Town of Gilbert does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
New, modified, or repaired private on-site sewage systems inside Gilbert town, Mingo County
“Once the Sanitarian has approved the site a Construction Permit for the new system, modification, or repair will be issued by the Health Department.”
New, modified, or repaired private on-site sewage systems inside Gilbert town, Mingo County
“When construction/repair of the system is finished, but before the system is covered up, the certified installer must contact the Health Department for a final inspection.”
On-site sewage options for homes inside Gilbert town, Mingo County
minimum lot area for consideration of alternative on-site sewage system for new construction: >= 2 acres
“Alternative systems may be considered for new construction only if the lot is two acres or larger in size.”
Water-well installation inside Gilbert town, Mingo County
“The Mingo County Health Department conducts water well permitting and sampling activities. A permit is required for the installation of a water well.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Gilbert or Mingo County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Gilbert publishes no rule on the point, not that none exists. Mingo County’s page lists the county offices to call.