Building permits, zoning and land rules in Southeast Fairbanks Census Area, Alaska
46Index Score / 100 #8 of 30 in Alaska
Unincorporated Southeast Fairbanks Census Area, Alaska has no area-wide residential building permit and no zoning12. Inside the city of Delta Junction, the city issues building permits for any structure and sets zoning by district34. Septic permits for every address, city or not, come from the Alaska Department of Environmental Conservation, not a local office5.
At a glance
Building permit
No area-wide residential permit in unincorporated areas; Delta Junction requires a city permit for any structure, with no permit fee136
Zoning
None area-wide in unincorporated areas; Delta Junction regulates land by city zoning districts24
Septic permits
Alaska DEC Domestic Wastewater Program, not a local office; written approval required before construction unless the system qualifies for authorization-by-rule78
Owner-installed septic
Allowed for one conventional system at the owner's occupied home after DEC training, testing and a $275 fee9
Subdivision / platting
The Alaska Department of Natural Resources is the platting authority outside a city subdivision ordinance, with a 45-day statutory review period10
Septic soil difficulty
Only 0.6% of the area's soils are free of severe limitations for a conventional drain field11
Driveway permits
DOT&PF permits new or changed access to state roads; Delta Junction also requires a city permit for driveway construction123
Building code
Alaska's adopted state building code is the primary standard in the unorganized borough13
Statewide fire-and-life-safety plan review and permitting for commercial construction and other covered projects; residential housing of three units or fewer is exempt. This is the closest thing to a building department reaching Southeast Fairbanks Census Area outside city limits.
Platting authority for subdividing land in the unorganized borough, including Southeast Fairbanks Census Area outside a municipal subdivision ordinance
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Southeast Fairbanks Census Area, Alaska?
An ordinary home in unincorporated Southeast Fairbanks Census Area does not go through an area-wide local building-permit program1. The Alaska State Fire Marshal requires advance plan approval for covered commercial construction, repairs, remodeling, additions, and occupancy changes, but residential housing of three units or fewer is exempt from that state review14. Alaska has adopted a state building code that is the primary standard in the unorganized borough even where no local permit desk reviews an ordinary house13. Inside Delta Junction, the city issues building permits and a permit is required to construct any structure, and the city charges no fee for that permit36. We could not confirm Eagle's building-permit rules, so ask the city before building there.
Who handles building, platting and land-use matters in Southeast Fairbanks?
Southeast Fairbanks Census Area has no area-wide building department for unincorporated land1. The Alaska State Fire Marshal's Plan Review Bureau handles covered commercial projects and can be reached at (907) 269-2004 or dps.prb@alaska.gov15. The Alaska Department of Natural Resources is the platting authority where land lies in the unorganized borough or a municipality has not adopted a subdivision ordinance; a municipality exercising platting authority approves plats under its own ordinance instead16. DNR's Division of Mining, Land and Water can be reached at (907) 269-852317. Its statutory review period is 45 days after a complete submittal, and the first two reviews on the first two parcels cost $8001018. DOT&PF's Northern Region, at (907) 451-5371, handles new or changed approaches to state roads1912.
Does Southeast Fairbanks Census Area have zoning?
Unincorporated Southeast Fairbanks Census Area has no area-wide zoning, and because no county zoning ordinance exists, no county rule sets minimum lot size, setbacks, building height, lot coverage, minimum dwelling size or accessory dwellings220. Zoning does not stop state rules: DNR still controls subdivision platting outside a municipality exercising its own platting authority, and legal access must reach both the subdivision and every lot within it1016. Delta Junction is not governed by the unincorporated default: its council regulates land and improvements by zoning districts, including designated residential areas identified in the city code4. Delta Junction zoning applies only inside the city, and septic permits there still come from Alaska DEC5. We could not confirm Eagle's zoning rules, so ask the city of Eagle before buying inside its limits.
How do septic permits work in Southeast Fairbanks Census Area?
Alaska DEC requires prior written approval before construction, installation, modification, or operation of a wastewater system unless a regulatory exception applies8. A qualifying conventional system may use authorization by rule if it meets the prescriptive standards and separation distances, but DEC still requires electronic notice at least 24 hours before work begins21. A homeowner may become certified to install one conventional system at the homeowner's occupied private residence within one year; the pathway requires training, a test, a $275 fee, soil classification, advance notice, and construction documentation within 90 days9. An engineer is required for multiple buildings, commercial flows over 500 gallons per day, non-domestic wastewater, nonconventional conditions, or unmet separation distances22. Only 0.6% of the area's soils lack severe limitations for a conventional drain field, so arrange the site evaluation early11. DEC administers the program statewide rather than through a local health department235.
Can you live in an RV or tiny home on your land in Southeast Fairbanks?
In unincorporated Southeast Fairbanks Census Area, no county zoning rule restricts living in an RV, tiny home or manufactured home on land you own20. That answer is about zoning only: septic still needs Alaska DEC approval, so settle the wastewater design before treating an RV or small dwelling as habitable85. DEC's camp rules address temporary camps rather than private residences24, and DNR's permit threshold for an occupiable camp remaining in one location applies to state-owned land, not privately owned land25. Inside Delta Junction, the city regulates land by zoning districts and requires a building permit for any structure, but we could not confirm an express city rule for residential RVs or tiny homes43. Ask Delta Junction before relying on an RV or tiny home inside its limits, and ask Eagle directly for land there.
Building a home in Southeast Fairbanks Census Area: the steps, in order
Map the parcel against city limits before designing: the unincorporated area has no area-wide residential permit, while Delta Junction requires a permit for any structure13.
For a Delta Junction project, obtain the city permit; the published fee is $06. For covered commercial work, obtain State Fire Marshal approval before work begins1514.
Arrange the septic site evaluation early because only 0.6% of area soils lack severe limits for a conventional drain field; then obtain DEC approval or follow authorization by rule, including 24-hour notice112321.
Obtain a DOT&PF driveway permit for new or changed access to a state road; apply at least 60 days before construction, and residential applications carry a $100 non-refundable fee plus a $500 refundable deposit2627; inside Delta Junction, driveway construction also requires a city permit19123.
If subdividing outside a municipality exercising platting authority, submit the plat to DNR1716.
Before building in a mapped flood area, identify the governing community; Delta Junction considers available flood-hazard information in planning, but the cited city rule does not create a general floodplain permit28.
What to check before you buy land in Southeast Fairbanks Census Area
Confirm city limits first: Delta Junction requires building and driveway permits and regulates land by zoning districts, while unincorporated Southeast Fairbanks has no area-wide zoning or residential permit desk3421. Plan for a difficult septic build because only 0.6% of area soils lack severe limitations for a conventional drain field11. Check legal access before closing; DNR requires access to a subdivision and every lot within it, and access to a state road needs DOT&PF approval1012. Check flood exposure with the governing community. Unincorporated communities lack authority to implement NFIP land-use compliance, while Delta Junction's planning commission considers current flood-hazard information without the cited provision establishing a general floodplain permit228. The effective property-tax rate is about 0.7%, and the median annual bill is about $1,8712930.
Watch-outs
The no-area-wide-permit rule applies only outside incorporated cities; Delta Junction requires a permit for any structure and regulates land by zoning districts134.
We could not confirm long-term RV, tiny-home, or manufactured-home occupancy rules on private land; DNR's camp-permit threshold applies to state-owned land, not land you own25.
Only 0.6% of the census area's soils are free of severe limitations for a conventional septic drain field, so assume you'll need an engineered or alternative system rather than a standard gravity field11.
Written October 9, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.
Southeast Fairbanks Census Area highlighted among the Alaska counties · colored by Index score
How Southeast Fairbanks Census Area scores
Seclusion98100% ev.
Self-Sufficiency1549% ev.
Admin Boringness8090% ev.
Durability3674% ev.
Property Autonomy69100% ev.
Carry Cost8796% ev.
Evidence strength: 81%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →
Each button opens a current land search for Southeast Fairbanks Census Area. Listing sites control their own results and filters.
Analyze a property
Add setup-cost allowances
Use rough quotes or placeholders. Blank fields count as $0.
Working estimate
—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—
A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.
Before an offer
Parcel due diligence
0/8 checked
Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.
Cities and towns in Southeast Fairbanks Census Area
Inside a city or town, that city usually issues building permits and sets zoning; the county’s rules above cover unincorporated land. Septic, wells and floodplain rules usually stay with the county or state everywhere.
Delta Junction · Eagle
Answers from the rulebook for Southeast Fairbanks Census Area
What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.
Southeast Fairbanks Census Area rules
County-wide zoningAbsent
Unincorporated areas of Southeast Fairbanks Census Area within Alaska’s unorganized borough.
The cited state publication addresses unincorporated communities generally in Alaska’s unorganized borough.
Municipal zoning, subdivision, floodplain, septic, and other applicable rules may still apply inside incorporated city boundaries or to particular regulated resources.
The source specifically states that there is no authority to implement NFIP compliance in unincorporated communities.
“Because there is no legal basis for land use regulation in Alaska’s unincorporated communities, there is no authority to implement any compliance with the NFIP standards.”
Minimum dwelling size · by state lawNone
Unincorporated Southeast Fairbanks Census Area: no county rule sets this, because Southeast Fairbanks Census Area's own reviewed answer confirms it has no county-wide zoning ordinance.
Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
The cited state publication addresses unincorporated communities generally in Alaska’s unorganized borough.
Municipal zoning, subdivision, floodplain, septic, and other applicable rules may still apply inside incorporated city boundaries or to particular regulated resources.
“Because there is no legal basis for land use regulation in Alaska’s unincorporated communities, there is no authority to implement any compliance with the NFIP standards.”
Minimum lot size · by state lawNone
Unincorporated Southeast Fairbanks Census Area: no county rule sets this, because Southeast Fairbanks Census Area's own reviewed answer confirms it has no county-wide zoning ordinance.
Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
The cited state publication addresses unincorporated communities generally in Alaska’s unorganized borough.
Municipal zoning, subdivision, floodplain, septic, and other applicable rules may still apply inside incorporated city boundaries or to particular regulated resources.
“Because there is no legal basis for land use regulation in Alaska’s unincorporated communities, there is no authority to implement any compliance with the NFIP standards.”
Setbacks · by state lawNone
Unincorporated Southeast Fairbanks Census Area: no county rule sets this, because Southeast Fairbanks Census Area's own reviewed answer confirms it has no county-wide zoning ordinance.
Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
The cited state publication addresses unincorporated communities generally in Alaska’s unorganized borough.
Municipal zoning, subdivision, floodplain, septic, and other applicable rules may still apply inside incorporated city boundaries or to particular regulated resources.
“Because there is no legal basis for land use regulation in Alaska’s unincorporated communities, there is no authority to implement any compliance with the NFIP standards.”
Lot coverage · by state lawNone
Unincorporated Southeast Fairbanks Census Area: no county rule sets this, because Southeast Fairbanks Census Area's own reviewed answer confirms it has no county-wide zoning ordinance.
Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
The cited state publication addresses unincorporated communities generally in Alaska’s unorganized borough.
Municipal zoning, subdivision, floodplain, septic, and other applicable rules may still apply inside incorporated city boundaries or to particular regulated resources.
“Because there is no legal basis for land use regulation in Alaska’s unincorporated communities, there is no authority to implement any compliance with the NFIP standards.”
Building height · by state lawNone
Unincorporated Southeast Fairbanks Census Area: no county rule sets this, because Southeast Fairbanks Census Area's own reviewed answer confirms it has no county-wide zoning ordinance.
Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
The cited state publication addresses unincorporated communities generally in Alaska’s unorganized borough.
Municipal zoning, subdivision, floodplain, septic, and other applicable rules may still apply inside incorporated city boundaries or to particular regulated resources.
“Because there is no legal basis for land use regulation in Alaska’s unincorporated communities, there is no authority to implement any compliance with the NFIP standards.”
Living in an RV · by state lawUnrestricted
Unincorporated Southeast Fairbanks Census Area: no county rule sets this, because Southeast Fairbanks Census Area's own reviewed answer confirms it has no county-wide zoning ordinance.
Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
The cited state publication addresses unincorporated communities generally in Alaska’s unorganized borough.
Municipal zoning, subdivision, floodplain, septic, and other applicable rules may still apply inside incorporated city boundaries or to particular regulated resources.
“Because there is no legal basis for land use regulation in Alaska’s unincorporated communities, there is no authority to implement any compliance with the NFIP standards.”
Tiny homes · by state lawUnrestricted
Unincorporated Southeast Fairbanks Census Area: no county rule sets this, because Southeast Fairbanks Census Area's own reviewed answer confirms it has no county-wide zoning ordinance.
Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
The cited state publication addresses unincorporated communities generally in Alaska’s unorganized borough.
Municipal zoning, subdivision, floodplain, septic, and other applicable rules may still apply inside incorporated city boundaries or to particular regulated resources.
“Because there is no legal basis for land use regulation in Alaska’s unincorporated communities, there is no authority to implement any compliance with the NFIP standards.”
Manufactured homes · by state lawUnrestricted
Unincorporated Southeast Fairbanks Census Area: no county rule sets this, because Southeast Fairbanks Census Area's own reviewed answer confirms it has no county-wide zoning ordinance.
Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
The cited state publication addresses unincorporated communities generally in Alaska’s unorganized borough.
Municipal zoning, subdivision, floodplain, septic, and other applicable rules may still apply inside incorporated city boundaries or to particular regulated resources.
“Because there is no legal basis for land use regulation in Alaska’s unincorporated communities, there is no authority to implement any compliance with the NFIP standards.”
Accessory dwellings · by state lawUnrestricted
Unincorporated Southeast Fairbanks Census Area: no county rule sets this, because Southeast Fairbanks Census Area's own reviewed answer confirms it has no county-wide zoning ordinance.
Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
The cited state publication addresses unincorporated communities generally in Alaska’s unorganized borough.
Municipal zoning, subdivision, floodplain, septic, and other applicable rules may still apply inside incorporated city boundaries or to particular regulated resources.
“Because there is no legal basis for land use regulation in Alaska’s unincorporated communities, there is no authority to implement any compliance with the NFIP standards.”
Subdividing landRegulated (with conditions)
Subdivision of land in the unincorporated portion of Southeast Fairbanks Census Area, outside an incorporated municipality exercising platting authority.
The Alaska Department of Natural Resources is the platting authority for the Unorganized Borough; any subdivision must be platted and approved before it can be recorded.
If land is within a municipality that has land-use-regulation power and is exercising platting authority, the municipal platting authority approves the subdivision instead.
Legal access must be provided to the subdivision and to all lots within it.
For subdivisions of five or fewer lots, controlling exterior corners must be monumented as specified by the DNR requirements; for subdivisions of more than five lots, each applicable interior corner must be monumented.
For subdivisions abutting the State Highway System, DOT/PF review and comments may affect access points, sight distances, and plat approval.
Subdivisions of agricultural parcels must be approved by the Division of Agriculture before survey.
Under AS 40.15.305, DNR review and approval is required before recording; the commissioner generally has 45 days to approve or return a plat for correction, subject to applicant consent to an extension.
DNR plat review period: 45 days (Unless the applicant consents to an extension of time.) · minimum monument size: 5/8 inch by 24 inch rebar with cap (Applicable to the statutory five-or-fewer-lot rule; DNR web guidance also specifies cap materials and additional monumentation details.)
“Any subdivision, as defined in AS 40.15.900, must be platted and approved by a platting authority in order to be recorded.”
One more reviewed finding on this topic
Regulated (with conditions) — Subdivision in the unorganized-borough portions of the Southeast Fairbanks Census Area.
“This established the Department of Natural Resources as the platting authority for the Unorganized Borough. Any subdivision, as defined in AS 40.15.900, must be platted and approved by a platting authority in order to be recorded.”
Building in a floodplainLimited
Floodplain development and NFIP participation outside incorporated cities in Alaska's Unorganized Borough, including unincorporated portions of the Southeast Fairbanks Census Area.
The official state page states that federal flood insurance is not available outside an incorporated city in the Unorganized Borough.
A participating NFIP community must adopt and enforce a flood damage prevention ordinance and require permits for development within the floodplain.
The Southeast Fairbanks Census Area itself is not identified by the source as an NFIP community; participation may exist within a participating incorporated city.
“No. Federal flood insurance may be available within the city limits of a participating city in the Unorganized Borough, but not outside of an incorporated city in the Unorganized Borough. In order to adopt and enforce land use regulations there has to be an identified entity to enact and enforce the regulations. AS 29.03.020 allows the Alaska Legislature to establish service areas for land use regulation and other purposes in the Unorganized Borough but so far this has not been done.”
Permit processPublished (with conditions)
Subdivision plat approval in the unorganized borough portion of the Southeast Fairbanks Census Area.
If a municipality is exercising its platting authority through a subdivision ordinance, the municipality approves the subdivision under that ordinance.
If a municipality has not adopted a subdivision ordinance or the subdivision is in an unorganized borough, the State Department of Natural Resources is the platting authority responsible for approving the subdivision plat.
“According to AS 40.15.070, if a municipality is exercising its platting authority through a subdivision ordinance, the municipality is the entity that approves a subdivision as provided by the ordinance. If a municipality has not adopted a subdivision ordinance or if the subdivision is in an unorganized borough, the State Department of Natural Resources (DNR) is the platting authority responsible for approving a subdivision plat.”
Alaska rules that apply here
Building permitLimited
Residential construction in Alaska, including Southeast Fairbanks Census Area, when the residential housing is larger than a three-plex or otherwise falls within the State Fire Marshal plan-review categories.
State Fire Marshal approval is required before work begins for construction, repair, remodel, addition, or change of occupancy of any building or structure, and for installation or change of fuel tanks.
Residential housing that is three-plex or smaller is exempt from this State Fire Marshal plan-review requirement.
Plans and specifications must be submitted by the owner or owner’s representative.
A plan-review fee is calculated by the Division and must be paid before review.
After review, a permit is issued and construction may begin.
The page states that certain deferred jurisdictions handle plan review locally; Southeast Fairbanks jurisdictions are not listed among the named deferred jurisdictions.
residential housing exemption threshold: three-plex or smaller (Exempt from this State Fire Marshal plan-review requirement)
“Construction, repair, remodel, addition, or change of occupancy of any building or structure, and installation or change of fuel tanks, must be approved by the State Fire Marshal before any work begins. Exemption: Residential housing that is three-plex or smaller is exempt from this requirement.”
2 more reviewed findings on this topic
Limited — State Fire Marshal fire-and-life-safety plan approval and permit requirements for commercial construction and other covered construction, repair, remodeling, additions, changes of occupancy, and fuel-tank installations in Alaska.
“Construction, repair, remodel, addition, or change of occupancy of any building or structure, and installation or change of fuel tanks, must be approved by the State Fire Marshal before any work begins. [...] Exemption: Residential housing that is three-plex or smaller is exempt from this requirement. [...] After review is complete, a permit is issued.”
Limited — Alaska State Fire Marshal building plan review and approval for construction, repair, remodeling, additions, changes of occupancy, and fuel-tank work statewide.
“Exemption: Residential housing that is three-plex or smaller is exempt from this requirement.”
Owner-builder exemptionConditional
A homeowner installing or modifying a conventional onsite wastewater system serving the homeowner's owner-occupied private residence, including in Southeast Fairbanks Census Area.
The homeowner must complete the DEC interactive training and pass its test.
The homeowner must submit the confirmation letter of completion and pay the homeowner training fee; the page states the current fee is $275.
The certification permits installation of one septic system on the homeowner's own owner-occupied private residence within one year of the certification date.
Before installation, onsite soils within 25 feet of the proposed soil absorption system must be properly classified, with results submitted with the Documentation of Construction form.
Soil classification must use either a soil sample from the absorption-field soil strata analyzed by a registered engineer or soils laboratory using sieve analysis, or an onsite evaluation by a registered engineer with a percolation test if necessary and a soils report stating the appropriate application rate based on field observations.
The homeowner must submit prior-day notice of installation to the local DEC office.
The homeowner must submit installation photographs and a completed Documentation of Construction form to DEC within 90 days after construction.
An engineer is required for systems serving multiple buildings, commercial buildings with wastewater flows over 500 gallons per day, non-domestic wastewater flows, conditions that do not allow installation of a conventional wastewater system, or when minimum requirements or separation distances cannot be met.
If an engineer provides oversight of the design and installation, the homeowner-installer fee and the test are not required.
The Municipality of Anchorage and the City of Valdez have additional requirements; those municipal requirements do not apply to Southeast Fairbanks Census Area unless separately applicable.
homeowner installer fee: 275 USD (The page states the fee is not required if an engineer provides oversight of the design and installation.) · soil-classification area: 25 feet from proposed soil absorption system · residence limit: 1 septic system per certification · certification period: 1 year from certification date · construction documentation deadline: 90 days after construction
“become certified as a homeowner to install one septic system on your own owner-occupied private residence within one year of the date of certification.”
3 more reviewed findings on this topic
Conditional — A property owner acting as the owner's own contractor for construction, including work on the owner's own existing residence, statewide in Alaska.
“To the extent that this chapter governs contractors, this chapter does not apply to [...] an owner who acts as the owner's own contractor”
Conditional — State-administered building plan review and construction inspections for an owner-built primary residence or other residential building in Alaska.
“Exemption: Residential housing that is three-plex or smaller is exempt from this requirement.”
Conditional — An owner acting as the owner's own contractor for construction in Alaska, including independent work or work performed using hired workers or subcontractors.
“(11) an owner who acts as the owner's own contractor and in doing so performs the work independently or hires workers or subcontractors, purchases materials, and, as such, sees to the paying for all labor, subcontractors, and materials; in this case, the owner shall be limited to construction of one home, duplex, triplex, four-plex, or commercial building every two years;”
Building code adoptedAdopted
Construction governed by Alaska’s state building-code framework, including the unorganized borough portion of Southeast Fairbanks Census Area.
The source identifies the 2021 International Building Code, 2021 International Existing Building Code, 2018 International Energy Conservation Code, 2021 International Fire Code, 2021 International Fuel Gas Code, 2021 International Mechanical Code, and 2018 International Residential Code as adopted by the State of Alaska.
Title 13 of the Alaska Administrative Code, Chapters 50 through 55, together with the listed model codes, forms the Alaska State Building Code.
The source states that some boroughs may implement their own building codes, but the state code is the primary standard within the unorganized borough.
The source does not establish a county building department or county-specific permit process for Southeast Fairbanks Census Area.
International Building Code edition: 2021 · International Existing Building Code edition: 2021 · International Energy Conservation Code edition: 2018 · International Fire Code edition: 2021 · International Fuel Gas Code edition: 2021 · International Mechanical Code edition: 2021 · International Residential Code edition: 2018
“The following building codes are adopted by the State of Alaska:”
2 more reviewed findings on this topic
Adopted — Statewide Alaska building-code adoption, including the Alaska State Building Code formed by the listed international codes and Title 13 of the Alaska Administrative Code, Chapters 50 through 55.
“Title 13 of the Alaska Administrative Code, Chapters 50 through 55, along with the above codes, make up Alaska State Building Code.”
Adopted (with conditions) — Alaska Building and Fire Codes used for state building-plan review and approval.
“The International Building Code 2021 Edition (IBC), Chapters 1 — 12, 14 — 28, and 30 — 35, and Appendix C are adopted by reference to regulate all occupancies and buildings”
InspectionsLimited
Alaska Division of Fire and Life Safety fire inspections statewide.
The official state page describes scheduled and complaint-based inspections of commercial and public buildings.
The cited page does not establish a general statewide construction-inspection schedule for one- to three-unit residential housing.
Deferred jurisdictions may administer local inspection requirements separately.
“Scheduled and complaint-based inspections of commercial and public buildings to verify compliance with fire and life safety codes statewide.”
Certificate of occupancyNot required
Projects subject to Alaska State Fire Marshal plan review outside deferred local jurisdictions.
Occupancy is granted upon completion of construction according to the approved plans.
The State Fire Marshal page states that certificates of occupancy are not provided separately.
This claim concerns the state plan-review process and does not determine whether a deferred municipality requires its own certificate or approval.
“Occupancy is granted upon completion of construction according to the approved plans. Certificates of occupancy are not provided separately.”
One more reviewed finding on this topic
Not required (with conditions) — Buildings subject to Alaska State Fire Marshal plan review.
“Occupancy is granted upon completion of construction according to the approved plans. Certificates of occupancy are not provided separately.”
Zoning districtsPartial
Statewide identification of the authorities that may administer zoning and land-use regulation for a specific Alaska parcel; the actual zoning district map and standards remain parcel- and municipality-specific.
First class, second class, and home rule boroughs, including unified municipalities, provide for planning, platting, and land-use regulation, subject to the statutory and charter distinctions stated by DCRA.
A borough must exercise planning power on an areawide basis but may delegate planning powers and duties to a city inside the borough if the city agrees.
First class and home rule cities outside boroughs must provide for planning, platting, and land-use regulation; second class cities outside boroughs may provide for those powers.
If a municipality has not adopted a subdivision ordinance or the parcel is in an unorganized borough, DNR is the platting authority for subdivision plats; this does not by itself identify the parcel’s zoning administrator.
The DCRA municipal code library warns that posted ordinances are informational and not official versions.
“The term “planning power” means the authority for planning, platting, and land use regulation as provided for in Alaska Statutes and, if applicable, home rule charter. The Alaska Statutes require that first class, second class, and home rule boroughs (including unified municipalities) provide for planning, platting, and land use regulation.”
One more reviewed finding on this topic
Published (with conditions) — Alaska statutory framework governing when municipalities may provide planning, platting, land-use regulation, and zoning districts.
“The Alaska Statutes require that first class, second class, and home rule boroughs (including unified municipalities) provide for planning, platting, and land use regulation.”
Camping on your landLimited
Camping or an occupiable camp, structure, or facility on Alaska state-owned lands.
A permit is required when the camp, structure, or facility remains in the same location for more than 14 days.
Camps should be temporary and must be removable within 48 hours.
Private, non-commercial camping for less than 14 days in the same location does not require a DNR permit.
Commercial recreational use requires a permit when the occupiable camp, structure, or facility remains in the same location for more than 24 hours.
The rule applies to state-owned lands, not generally to privately owned land or municipal land.
permit threshold for non-commercial occupiable camp: > 14 days (Private, non-commercial use for less than 14 days in the same location does not require a DNR permit.) · maximum removal period: <= 48 hours (Camps should be temporary and removable within 48 hours.) · commercial recreation permit threshold: > 24 hours (Applies to commercial recreational use.)
“A permit is required for the use of state-owned lands to establish an occupiable camp, structure, or facility that remains in the same location for more than 14 days. Camps should be temporary in nature and must be able to be removed within 48 hours. Examples include man-camps used for construction sites, scientific research camps, and set-net support camps. A camp used for private, non-commercial purposes for less than 14-days in the same location does not require a permit from DNR.”
One more reviewed finding on this topic
Limited — Temporary camps in Alaska, including temporary or seasonal camps operated in the Southeast Fairbanks Census Area.
“Short-term camps have 24 or less people and operate in the same location for 14 days or less. These camps do not require authorization or permits from the Department of Environmental Conservation, but are recommended to follow the best practices for small camps.”
Who permits septicMixed
Administration of statewide onsite wastewater and septic requirements.
The Alaska Department of Environmental Conservation administers the statewide wastewater program.
The Municipality of Anchorage and City of Valdez have separate locally administered programs.
Local governments may impose additional pit-privy restrictions.
“Certification is valid throughout the state except within the Municipality of Anchorage and the City of Valdez. Those areas have their own programs”
One more reviewed finding on this topic
State — Onsite septic systems in Southeast Fairbanks Census Area, including unincorporated areas, are governed under Alaska's statewide wastewater rules administered by the Alaska Department of Environmental Conservation.
“All septic systems in Alaska are subject to Alaska Regulations Chapter 72.”
Septic permitLimited
Construction, installation, modification, or operation of onsite wastewater systems statewide.
Systems within the authorization-by-rule categories of 18 AAC 72.511 or 18 AAC 72.611 may proceed without prior plan approval if prescriptive standards and separation distances are met.
Those systems require electronic notice at least 24 hours before construction or modification and later documentation/registration.
Systems outside those categories require prior written DEC approval before construction, modification, installation, or operation.
Emergency repairs and routine maintenance have separate exceptions under 18 AAC 72.201 and 18 AAC 72.990.
construction notification lead time: >= 24 hours (For systems installed without prior plan approval) · registration fee: 115 USD (For documentation of conventional and alternative systems not requiring plan approval)
“Wastewater systems that do not meet the requirements listed in 18 AAC [...] 72.511 or 18 AAC [...] 72.611 require prior Department approval.”
2 more reviewed findings on this topic
Required — Construction, installation, modification, or operation of a wastewater collection, treatment, storage, or disposal system in Southeast Fairbanks Census Area when no regulatory exception applies.
“18 AAC 72.200 states that except as otherwise provided in 18 AAC 72.010(c), 18 AAC 72.201, 18 AAC 72.511, or 18 AAC 72.611, in order to construct, install, modify, or operate a wastewater collection, treatment, storage, or disposal system, a person must obtain prior written approval.”
Limited — Onsite wastewater systems in Southeast Fairbanks Census Area installed without prior plan approval under Alaska's authorization-by-rule or prescriptive standards process.
“Installation or modification of an onsite wastewater system installed under the authorization by rule outlined in 18 AAC 72.511 or 18 AAC 72.611 requires a qualified person: a certified installer, approved homeowner, or registered engineer to submit a notification at least one day before beginning construction or modification of an onsite wastewater disposal system.”
Septic inspectionLimited
Septic systems in Southeast Fairbanks Census Area that serve multiple buildings, commercial buildings with wastewater flows over 500 gallons per day, receive non-domestic wastewater, cannot use a conventional system, or cannot meet minimum requirements or separation distances.
A registered professional engineer is required for the listed system types and conditions.
The engineer evaluates soils, performs a percolation test if necessary, designs the system, and certifies that the completed installation meets requirements.
The source does not state that every conventional residential system requires an engineer inspection.
commercial wastewater flow threshold: > 500 gallons per day
“An engineer is required for any system serving multiple buildings, commercial buildings with wastewater flows over 500 gallons per day, non-domestic wastewater flows and conditions that do not allow installation of conventional wastewater system. An engineer is also required if minimum requirements or separation distances cannot be met.”
One more reviewed finding on this topic
Limited — Inspection and construction verification for engineered onsite wastewater systems.
“During the construction, the engineer responsible for observing construction will visually observe the quality of construction, and the equipment and materials used for construction”
Off-grid sanitationLimited
Off-grid human-waste and graywater sanitation arrangements at qualifying Alaska small camps, including camps in the Southeast Fairbanks Census Area; this source does not establish a general authorization for off-grid sanitation at ordinary permanent residences.
The small-camp framework applies to camps operated for more than 14 days and occupied by 24 or fewer people.
A small camp must apply to the Alaska Department of Environmental Conservation for authorization and may not begin operating until authorization is approved.
For qualifying small camps, human waste may be handled using a pit privy, incinerating toilet, or composting toilet.
Commercially manufactured composting or incinerating toilets must be installed, operated, and maintained according to manufacturer specifications and recommendations.
Toilet compost or ash must be buried at least two feet below the surface, at least 100 feet horizontally from surface water, and at least 150 feet horizontally from a drinking-water source serving an approvable small-camp facility.
Composting and incinerating toilets may be used only for human waste and may not receive graywater, garbage, oil, hazardous substances, toxic waste, ash from burned solid waste, or non-burnable solid waste.
Pit privies must be at least 100 feet horizontally from the main high-water level of surface water, at least 150 feet horizontally from an applicable drinking-water source, and have the lowest point at least four feet above the high water table; graywater may not be disposed of in the pit privy.
If another human-waste treatment or disposal system is used, such as a flush toilet with a septic system or holding tank, the operation may need wastewater plan approval.
For non-remote small camps, the remote-camp graywater methods do not apply and wastewater engineering plans must be submitted for review and approval.
For remote small camps, graywater surface discharge is limited to no more than 500 gallons per day and no more than 90 days in a calendar year, with specified treatment, location, low-phosphate-detergent, access-control, and no-oil/floating-solids/garbage conditions.
For remote small camps, subsurface graywater treatment and disposal is required when daily graywater volume exceeds 500 gallons per day or discharge occurs for more than 90 days in a calendar year, with specified separation distances and soil-absorption treatment.
The small-camp authorization annual fee is $250; a $30 wastewater fee is added for camps not used for oil and gas activities within the North Slope Borough.
maximum small-camp occupancy: <= 24 people (The source defines small camps as operated for more than 14 days.) · pit-privy separation from surface water: >= 100 feet horizontal (Measured from the main high-water level.) · pit-privy separation from drinking-water source: >= 150 feet horizontal (The source refers to a drinking-water source serving a facility approvable as part of the small camp.) · pit-privy clearance above high water table: >= 4 feet · toilet compost or ash burial depth: >= 2 feet below surface · toilet compost or ash separation from surface water: >= 100 feet horizontal · toilet compost or ash separation from drinking-water source: >= 150 feet horizontal (The source refers to a drinking-water source serving a facility approvable as part of the small camp.) · remote-camp surface graywater discharge volume: <= 500 gallons per day (Discharge may occur for no more than 90 days in a calendar year and all listed requirements must be met.) · remote-camp surface graywater discharge duration: <= 90 days per calendar year (If exceeded, subsurface graywater treatment and disposal is required.) · small-camp annual authorization fee: 250 USD · additional North Slope Borough wastewater fee: 30 USD (Added for camps not used for oil and gas activities within the boundaries of the North Slope Borough.)
“Small camps must apply to the Department of Environmental Conservation for authorization. A camp may not begin operating until authorization is approved. [...] Human waste must be disposed of in a pit privy, incinerating toilet, or composting toilet”
Agricultural exemptionAvailable (with conditions)
The statutory payment requirement for the right to construct housing on agricultural parcels subdivided under Chapter 20, SLA 1997.
For a subdivided parcel under 640 acres, payment is generally required before exercising the housing right.
The DNR fact sheet states $6,349 as the 2021-dollar amount, adjusted annually; it does not state the current 2026 adjusted amount.
An appraisal may be used instead of the standard amount; appraisal is mandatory before subdivision of specific agricultural parcels at Point MacKenzie, and the appraiser must be approved by DNR, contact DNR before beginning, and submit the appraisal for DNR approval.
If each subdivided parcel is at least 640 acres, no payment is required.
If a subdivided parcel is conveyed to an immediate family member, payment is delayed until conveyance outside the immediate family and a lien secures payment.
If the original parcel was obtained under the State homestead program, Chapter 20, SLA 1997 does not require payment for subdividing.
housing-right payment: 6349 USD in 2021 dollars (Adjusted annually; amount is not stated as the current 2026 amount in the source.) · parcel threshold for no payment: >= 640 acres (Each subdivided parcel must meet the threshold.)
“$6,349 (current price in 2021 dollars – adjusted annually) [...] 640 acres [...] immediate family [...] homestead program”
Driveway accessRequired
New or modified driveway or approach-road access involving a state highway right-of-way in the Southeast Fairbanks Census Area.
An owner must apply when the driveway or approach road provides new access and no permit has been issued.
The rule also covers changing the width, grade, slope, or radius of an existing driveway or approach road, and certain land-use changes that increase traffic.
The Department of Transportation and Public Facilities issues permits at its discretion on highways that are not controlled-access facilities.
The proposed location must satisfy 17 AAC 10.040, be compatible with public safety, and not interfere with highway use.
The permittee assumes applicable construction and maintenance costs and liability.
Ingress and egress are subject to 17 AAC 10.020 through 17 AAC 10.080 and the department's Driveway Standards.
“An owner of land must apply for a permit under this section if the (1) land is serviced by a driveway or approach road (A) that was constructed as part of a highway construction project after January 1, 2000, and for which a permit was issued before January 1, 2000; or (B) for which a permit has not been issued; and 2) owner proposes to (A) install a driveway or approach road to provide a new access; (B) change the width, grade, slope, or radius of an existing driveway or approach road; or (C) change the land use for the land provided access, if the projected increase in traffic onto the land increases (i) from fewer than 20 to more than 25 vehicle trips during any hour of the day; or (ii) by more than 100 vehicle trips during any hour of the day.”
One more reviewed finding on this topic
Required — Access to Alaska state roads in the Southeast Fairbanks Census Area when constructing a new approach, changing an existing approach, or changing the land use served by an existing approach.
“Property owners who construct new approaches, change existing approaches, or change land use on existing approaches to state roads must obtain driveway permits from the Alaska Department of Transportation and Public Facilities (DOT&PF).”
Short-term rentalsLimited
Short-term rental or other property rental activity in Alaska when the operator collects rental income.
An Alaska business license is required for rental activity producing income.
Local governments or agencies may impose additional licensing requirements, local-ordinance restrictions, and sales-tax requirements.
This claim does not establish that a particular short-term rental use is allowed under local zoning.
“Yes, if you are collecting rental income then you are engaged in business activity and an Alaska Business License is required.”
Permit feesVariable (with conditions)
State Fire Marshal plan-review fees for commercial construction and other projects within the State Fire Marshal's jurisdiction.
Fees are calculated using the valuation schedule, plan-review fee table, and fee formula.
For new buildings, the fee is based on occupancy type, construction type, and square footage; for existing buildings, the fee is based on renovation cost.
If project value cannot be determined using the valuation schedule or construction estimate, the fee is $75 per hour or fraction of an hour.
The minimum review fee for industrial oil, gas, and mining use facilities is $1,000.
The plan-review fee for home day cares is $100.
The plan-review fee for a relocation review is $150.
The minimum fee for other uses requiring administrative approval, including impairments, code modifications, foundations, and framings, is $150.
If required work begins without plan review and approval, an additional special-processing fee equal to the standard plan-review fee is charged; subsequent violations produce an additional special-processing fee multiplied by the number of previous violations.
The State Fire Marshal page states that the following deferred jurisdictions handle plan review locally: Anchorage Fire Department, Anchorage Building Safety, City of Palmer, Juneau, Fairbanks, Kenai, Ketchikan, Seward, Kodiak, Sitka, Soldotna, University of Alaska Fairbanks, and Central Mat-Su FSA.
hourly fee when value cannot be determined: per 75 USD per hour or fraction of an hour · industrial use minimum review fee: >= 1000 USD (oil, gas, and mining use facilities) · home day care plan-review fee: 100 USD · relocation review fee: 150 USD · other administrative-approval minimum fee: >= 150 USD (impairments, code modifications, foundations, and framings) · special-processing fee: standard plan-review fee (additional charge when work begins before required review and approval)
“if the division of fire and life safety cannot determine project value using the valuation schedule or the construction estimate, an hourly fee of $75 per hour or fraction of an hour will be charged; the minimum review fee for industrial (oil, gas, and mining) use facilities is $1000; the plan review fee for home day cares is $100; the plan review fee for a relocation review is $150; the minimum fee for other uses requiring administrative approval, such as impairments, code modifications, foundations, and framings is $150;”
3 more reviewed findings on this topic
Published (with conditions) — State Department of Natural Resources plat review within Alaska's unorganized borough, including the Southeast Fairbanks Census Area where the property is in the unorganized borough.
“Plat Review Within The Unorganized Borough (under AS 40.15.305) Description Fees Staff Time For first two reviews on first two parcels or tracts for each plat, plus: $800 27 hrs For each additional parcel or tract on first two reviews for each plat + $80 + 3 hrs For third and each additional review of a plat + $320 + 11 hrs For each additional parcel or tract on third and each additional review of a plat + $40 + 1.5 hrs For final plat approval and signing + $0”
Variable (with conditions) — Alaska DEC wastewater discharge permits and plan reviews applicable to wastewater activities in the Southeast Fairbanks Census Area.
“Fees are charged for wastewater discharge permits and plan reviews. Consult the following tables to determine the fee for your permit. If your permit type is not in the tables, your fee may be an "hourly or negotiated" fee as described in 18 AAC 72.959.”
Published (with conditions) — Driveway and approach-road permits for access onto a state-maintained highway in the Southeast Fairbanks Census Area.
“Residential & Farm: $100 (One Hundred Dollars) non-refundable application process fee. Residential & Farm: $500 Refundable Performance Deposit when driveway is constructed and built to standard. Commercial Property and Approach Roads: Retainer to be determined when application is submitted.”
Campground & park staysLimited
Temporary camping at Eklutna Lake Campground in Chugach State Park.
The campground page states the limit for Eklutna Lake Campground specifically.
“ALL CAMPSITES ARE FIRST COME, FIRST SERVED Eklutna Lake Campground has 50 campsites, water, latrines, picnic tables and fire pits. An overflow camping area has 15 sites. Camping fees are posted, and camping is allowed for 15 consecutive nights.”
2 more reviewed findings on this topic
Limited — Temporary camping in developed campgrounds and designated parking areas within Chena River State Recreation Area.
“Overnight use of a developed campsite, including designated parking areas, requires payment of a fee or an annual pass. Camping within the park is limited to 15 consecutive days thereafter. In developed campgrounds, camping is permitted only at a developed campsite.”
Limited — Temporary RV camping at Eklutna Lake Campground in Chugach State Park.
“★ RV Length Limit - 30ft ★ Camping Limit - 15 nights [...] Camping fees are posted, and camping is allowed for 15 consecutive nights.”
county zoning authorityLimited
Alaska borough authority to provide planning, zoning, and land-use regulation affecting unincorporated areas.
Alaska uses boroughs rather than counties as the relevant county-equivalent municipal governments.
The state agency source states that all cities and boroughs, excluding the unorganized borough, either must or may exercise planning and zoning authority.
First class and home rule cities in the unorganized borough must provide planning, platting, and land-use regulation; first class, second class, and home rule boroughs must provide planning, platting, and land-use regulation on an areawide basis, both inside and outside cities, under AS 29.40; second class cities may provide those powers.
Land-use regulations must be adopted by ordinance and may include zoning regulations restricting land and improvements by geographic districts and land-use permit requirements.
The source is an agency summary and directs users to the official Alaska Statutes for a complete statement of law.
“As a side note, planning powers are either mandatory or optional for cities and boroughs. Thus, as a practical matter, all cities and boroughs (excluding the unorganized borough) either must exercise planning and zoning authority or may exercise planning and zoning authority.”
One more reviewed finding on this topic
General — Alaska boroughs, which perform the county-level governmental role, adopting zoning and related land-use regulations for areas outside incorporated cities and otherwise on an areawide basis.
“According to AS 29.40.040, a municipality must have a comprehensive plan in place [...] before it adopts land use regulations such as zoning and land use permits.”
Inside cities and towns in Southeast Fairbanks Census Area
Municipal rules found while researching the county. They apply inside that city or town, not to unincorporated land.
Local zoningPresent (with conditions)
Land use within the incorporated City of Delta Junction, Alaska, located in Southeast Fairbanks Census Area.
The City Council regulates and restricts land and improvements by districts in accordance with the comprehensive plan.
Regulations must be uniform for each class or kind of building, structure, land, or water area within each district, but may differ between districts.
Exceptions may be made for preservation, maintenance, and protection of historical sites, buildings, and monuments.
Residential zoning may be used for Neighborhood Business uses only under a Conditional Use Permit; Neighborhood Business zoning may be used for Commercial uses only under a Conditional Use Permit; and Commercial zoning may be used for Light Industrial uses only under a Conditional Use Permit.
A Conditional Use Permit must be granted by ordinance adopted by the City Council, and the city shall attempt to give property owners within 500 feet at least 15 days' written notice of the public hearing.
The City of Delta Junction Planning Commission performs planning, platting, and zoning functions and enforces applicable zoning ordinances and regulations.
conditional-use notice distance: 500 feet (Property owners located within this distance are covered by the notice provision.) · conditional-use public-hearing notice: >= 15 days (The city shall attempt to provide written notice.)
“4.20.010 Zoning: (a) In accordance with the comprehensive plan, the Council shall regulate and restrict the use of land and improvements by districts. Regulations shall be uniform for each class or kind of building, structure, land or water area within each district, but the regulations may differ between districts and exceptions may be made in order to provide for the preservation, maintenance and protection of historical sites, buildings and monuments.”
Zoning districtsPublished (with conditions)
Zoning within the incorporated City of Delta Junction.
The City Council regulates and restricts land and improvements by districts in accordance with the comprehensive plan.
Regulations must be uniform for each class or kind of building, structure, land, or water area within each district, but may differ between districts.
Exceptions may be made for preservation, maintenance, and protection of historical sites, buildings, and monuments.
The code separately designates residential areas in Delta Junction's North Addition and Block 21 of the North Addition of the Delta Junction Townsite; the cited section prohibits new businesses in the defined zone area, subject to the stated existing-use protections.
“In accordance with the comprehensive plan, the Council shall regulate and restrict the use of land and improvements by districts.”
Driveway accessRequired
Driveway construction within the City of Delta Junction.
The City of Delta Junction building-permit provision applies within city limits.
The code states that a building permit is required for driveway construction; it does not specify a separate driveway fee in the cited passage.
“4.50.010 Permits: A building permit is required to construct any type of structure, log clearing, street construction or driveway construction.”
Building in a floodplainLimited
Planning and zoning in the City of Delta Junction involving flood hazards or special flood hazards.
The planning commission must take flood hazards into account only to the extent practicable.
The information considered is the most recent flood plain information available to the planning commission.
The cited provisions do not establish a general floodplain development permit requirement.
“In developing, reviewing and amending the comprehensive plan under §4.15.020, the planning commission shall to the extent practicable take into account flood hazards and special flood hazards that may exist in the City, according to the most recent flood plain information available to the planning commission.”
Permit feesPublished (with conditions)
City of Delta Junction building permits for structures, log clearing, street construction, or driveway construction.
The cited provision applies within the City of Delta Junction; it does not establish a fee for unincorporated portions of the Southeast Fairbanks Census Area.
The source states that no fee will be charged for this permit.
building permit fee: 0 USD
“4.50.020 Fees: No fee will be charged for this permit.”
Still unanswered
We looked and could not find an official answer yet. Silence is not permission — ask the county directly.
Well permit — A private water well constructed in Southeast Fairbanks Census Area.
Mandatory utility hookup — Connection of a private parcel in Southeast Fairbanks Census Area to public water or sewer utilities.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Living off-grid in Southeast Fairbanks Census Area, Alaska
Is Southeast Fairbanks Census Area a good place to live off-grid or homestead?
Southeast Fairbanks Census Area scores 46/100 on the Bolthole Index, a marginal county profile. Its strengths: deep seclusion — about 7 people within 15 miles and manageable long-term carry cost. Watch-outs: its water supply and elevated current hazard exposure.
Do you need a building permit in Southeast Fairbanks Census Area, Alaska?
Southeast Fairbanks Census Area does not require a county building permit for a home in unincorporated areas, and it has no county-wide zoning. Onsite septic is permitted by Alaska Department of Environmental Conservation (ADEC) - Onsite Wastewater Program. Owner-builders may act as their own contractor to build their home. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.
Can you live in an RV or tiny home on your land in Southeast Fairbanks Census Area?
Living in an RV on your own land in Southeast Fairbanks Census Area is allowed: Unincorporated Southeast Fairbanks Census Area: no county rule sets this, because Southeast Fairbanks Census Area's own reviewed answer confirms it has no county-wide zoning ordinance. Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits. The cited state publication addresses unincorporated communities generally in Alaska’s unorganized borough. A tiny home is allowed. Confirm with the county before relying on it.
How much does land cost in Southeast Fairbanks Census Area, Alaska?
Land in Southeast Fairbanks Census Area runs about $2,296 per acre, based on the latest county data.
What is the water situation in Southeast Fairbanks Census Area?
Water data for Southeast Fairbanks Census Area is limited.
How remote is Southeast Fairbanks Census Area?
A typical private-land location has about 7 people within 15 miles and 9,349 within 100 miles. These radius catchments are the published fallback where road routing is unavailable.