The Town of Corte Madera, in Marin County, California, has its own zoning code, and its Town Building Division reviews building permit applications for work inside town limits12. Living in a camp car or trailer on any lot in town is unlawful3. Septic permits come from Marin County Environmental Health Services, not the town4.
At a glance
- Zoning
- Town of Corte Madera zoning code (Title 18), including R-1 residential districts1
- Building permits
- Town Building Division reviews applications; full rules for every project type unconfirmed2
- Septic
- Marin County Environmental Health Services4
- Sewer connections
- Written district permit required before connecting5
- RV or trailer living
- Unlawful on any lot in town3
- Maximum height (R-1 and R-1-A)
- 30 feet67
- Maximum lot coverage (R-1-A)
- 25 percent of site area8
- Flood zones
- Residential lowest floor at least 1 foot above base flood elevation in zones A, AE, V and VE9
Who to call
Building permits
Town of Corte Madera Building Division
Building permit applications, plan review, inspections and code enforcement inside Corte Madera town limits
buildingpermit@cortemadera.gov
300 Tamalpais Drive, Corte Madera, CA 94925
Zoning
Town of Corte Madera Planning Division
Zoning ordinance, land use and design review applications inside Corte Madera town limits
300 Tamalpais Drive, Corte Madera, CA 94925
Septic permits
Marin County Community Development Agency - Environmental Health Services
Septic systems and wells in Marin County
3501 Civic Center Drive, Suite 236, San Rafael, CA 94903
Contact details are copied from each office’s official page and were checked against it on October 16, 2026.
Off-grid gear
Going off-grid in Town of Corte Madera means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Does Corte Madera have zoning, and what does it mean for RVs and lot rules?
Yes. The Town of Corte Madera, California adopts its own zoning code, Title 18 of the municipal code, with residential districts named R-1, R-1-A, R-1-B and R-1-C10. The Planning Division maintains the zoning ordinance and handles land use applications11.
Rules differ by district. In the R-1 district, no structure may exceed 30 feet in height6. In the R-1-A district, structures are also capped at 30 feet, and structures taller than three feet may cover no more than 25 percent of the site78.
RV living is not an option on a Corte Madera lot. Using or occupying a camp car or trailer for living or sleeping on any lot or parcel in the town is unlawful3. The same section rules out temporary camping in a trailer12. Whether tiny homes are allowed here we could not confirm; ask the Planning Division.
Do you need a building permit in Corte Madera, and who issues it?
Inside Corte Madera town limits, the Town of Corte Madera Building Division, not Marin County, reviews building permit applications and plans for compliance with state and local building codes2. The county's own building permit rules cover only unincorporated Marin County13.
We could not confirm which small projects the town exempts from a building permit, or the town's inspection and certificate-of-occupancy rules, so call the Building Division at 415-927-5128 before you assume any job is exempt2. Applications are submitted electronically by email to buildingpermit@cortemadera.gov2.
Owner-builders: California law has a contractor-licensing exemption for owners who build on their own property, but it concerns licensing and does not replace a town permit14. Ask the Building Division which permit types an owner-builder may take out.
How do septic permits and sewer connections work in Corte Madera?
Septic systems everywhere in Marin County are permitted through Marin County Environmental Health Services, which processes permits for new and replacement septic systems4. A septic construction permit is required before building a system, and the county inspects the work before it is covered1516.
Sewer connections are a separate process. Connecting to, altering or disturbing a district sewer requires a written permit from the district first, with fees, connection charges and deposits as required5. The district board sets those fees17. We could not confirm a general rule on when connection is mandatory; ask the sanitary district before you buy.
For a well, drilling requires a county permit from Environmental Health Services in unincorporated Marin; we could not confirm the rule inside the town, so ask18.
Building a home in Corte Madera: the steps, in order
- Confirm your lot's zoning district, height and coverage limits with the Planning Division11.
- Check whether the lot lies in a special flood hazard area: new residential construction in zones A, AE, V and VE needs its lowest floor at least 1 foot above base flood elevation9.
- Ask the sanitary district for a sewer permit before any connection work5.
- Submit your building permit application by email to the Building Division2.
- Schedule inspections through the town's online inspection portal; phone requests were discontinued in 20242.
- If any septic or well work is involved, contact Marin County Environmental Health Services18.
What stays with Marin County, and what to check before you buy in Corte Madera
Marin County's rules for land outside town limits do not apply inside Corte Madera: the county's Title 22 Development Code covers unincorporated areas only19. For land outside the town, see the Marin County page.
What stays with the county is septic and well permitting through Environmental Health Services4. Also check short-term rental limits: in town, only owner-offered units that meet eligibility conditions can get a license, and the owner may not hold another licensed rental in town20.
The typical home value is about $1,504,466 and the median property tax bill is about $10,001 a year, at an effective rate of 0.7 percent212223. These figures are for Marin County as a whole.
Watch-outs
- We could not confirm the town's complete building permit exemptions, inspection rules or certificate-of-occupancy rules; call the Building Division at 415-927-51282.
- Accessory dwelling unit rules are unconfirmed; ask the Planning Division, since the town code points to a separate ADU chapter11.
- Camp cars and trailers cannot be lived in on any Corte Madera lot, so an RV is not a workable stopgap while you build3.
- The county's emergency RV and tiny-home allowance for people designated as homeless applies only in unincorporated Marin County, not inside Corte Madera24.
Sources
- Corte Madera Municipal Code § 18.08.220 (Town of Corte Madera), quoted and re-checked
- Town of Corte Madera Building Division (cortemadera.gov)
- Corte Madera Municipal Code § 9.24.030 (Town of Corte Madera), quoted and re-checked
- Septic systems/onsite wastewater treatment systems, quoted and re-checked
- Corte Madera Municipal Code § 21.28.010 (Town of Corte Madera), quoted and re-checked
- Corte Madera Municipal Code § 18.08.220 (Town of Corte Madera), quoted and re-checked
- Corte Madera Municipal Code § 18.08.320 (Town of Corte Madera), quoted and re-checked
- library.municode.com (Town of Corte Madera), quoted and re-checked
- Corte Madera Municipal Code § 16.10.080 (Town of Corte Madera), quoted and re-checked
- Corte Madera Municipal Code § 18.08.220 (Town of Corte Madera), quoted and re-checked
- Town of Corte Madera Planning Division (cortemadera.gov)
- Corte Madera Municipal Code § 9.24.030 (Town of Corte Madera), quoted and re-checked
- Do I need a building permit?, quoted and re-checked
- Owner-Builder Overview, quoted and re-checked
- Septic systems/onsite wastewater treatment systems, quoted and re-checked
- Septic systems/onsite wastewater treatment systems, quoted and re-checked
- Corte Madera Municipal Code § 21.28.010 (Town of Corte Madera), quoted and re-checked
- Marin County Community Development Agency - Environmental Health Services (marincounty.gov)
- Title 22 - Development Code, quoted and re-checked
- Corte Madera Municipal Code § 5.34.040 (Town of Corte Madera), quoted and re-checked
- Typical home value (Zillow): Bolthole Index county data
- Median property tax bill: Bolthole Index county data
- Effective property tax rate: Bolthole Index county data
- County Declares Shelter Crisis to Provide Temporary Emergency Housing, quoted and re-checked
Written October 16, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.