Inside Pacifica, California, the City of Pacifica runs building permits through its Building Division and sets zoning through its Planning Division123. San Mateo County leaves permitting inside incorporated cities to the cities4. Septic permits and well permits in San Mateo County come from County Environmental Health56; how that applies to a specific Pacifica lot is something we could not confirm.
At a glance
- Building permits
- Issued by the City of Pacifica Building Division, with the 2025 California Residential Code adopted72
- Zoning
- City zoning under Title 9, Chapter 4 of the Pacifica Code1
- R-1 minimum lot
- 5,000 sq ft building site, 50 ft wide8
- R-M minimum lot
- 5 acres9
- Septic and wells
- County Environmental Health permits septic systems and wells countywide56
- RV living
- State rule limits RVs to parks unless a local ordinance allows more; Pacifica's private-land rule unconfirmed10
- Owner-builder
- State licensing exemption exists; it does not remove the permit requirement11
Who to call
Building permits
City of Pacifica Community Development, Building Division
Building permit applications, plan review and inspections inside Pacifica city limits
1800 Francisco Boulevard Pacifica, CA 94044
Zoning
City of Pacifica Community Development, Planning Division
Zoning, planning permits and the zoning ordinance inside Pacifica city limits
1800 Francisco Boulevard Pacifica, CA 94044
Septic permits
San Mateo County Environmental Health Services
Septic (OWTS) permits and water-well drilling permits in San Mateo County
Contact details are copied from each office’s official page and were checked against it on October 16, 2026.
Off-grid gear
Going off-grid in Pacifica means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Does Pacifica, California have zoning, and what does it mean for lot size and setbacks?
Yes. The City of Pacifica sets its own zoning for land inside city limits, codified in Title 9, Chapter 4 of the Pacifica Code1. San Mateo County's own zoning maps cover only unincorporated land, and the county tells city residents to contact the city's Planning Department12.
Standards depend on the district. In the R-1 Single-Family Residential District, the minimum building site is 5,000 square feet and the minimum lot width is 50 feet8. R-1 lots need a front setback of 15 feet, or 20 feet to a garage entrance13, and structures may cover at most 40 percent of the lot14. The maximum height is 35 feet, or 12 feet for a detached accessory building15.
In the R-M Resource Management District, the minimum lot size is 5 acres, with density limited by slope, flood, landslide, fault and remoteness criteria9. R-M yards are 50 feet at the front and 20 feet at the sides and rear16, and the height limit is 35 feet17.
Do you need a building permit in Pacifica, and who issues it?
Inside Pacifica city limits, the city issues building permits, not San Mateo County; the county states that incorporated cities and towns administer their own permitting4. Pacifica has adopted the California Residential Code, 2025 Edition, with city amendments7. The Building Division says most building permits can be applied for online through the city's online permit portal2.
The code sections we reviewed do not list which small projects are exempt from a building permit, so ask the Building Division before starting any work. California's owner-builder exemption covers contractor licensing only and does not itself remove a building-permit requirement11.
How do you reach the Pacifica Building Division and Planning Division?
The Pacifica Building Division and Planning Division both list the office at 1800 Francisco Boulevard and the phone number 650-738-734123. Email permittech@pacifica.gov for building permits2 and planningdivision@pacifica.gov for planning and zoning questions3.
Building inspections are scheduled by calling the Building Inspection Hotline at (650) 737-10002. Planning applications that need a hearing go to the zoning administrator3.
How do septic permits work inside Pacifica?
San Mateo County Environmental Health, not the City of Pacifica's Building Division, issues septic permits in the county: anyone installing an individual sewage disposal system needs an Environmental Health permit5. Environmental Health also observes and approves installation, repair, alteration or destruction work18. The county says the only approved on-site system in San Mateo County is a septic system where no municipal sewer exists19.
We could not confirm whether a particular Pacifica address is on the municipal sewer, so ask Environmental Health at (650) 372-6200 before relying on a septic system20. Well drilling in the county also needs an Environmental Health permit6.
Can you live in an RV or tiny home on your land in Pacifica?
We could not confirm Pacifica's rule for living in an RV on private land inside city limits. Under state guidance, RVs generally may be occupied only in mobilehome parks or special occupancy parks unless a local ordinance allows otherwise10. Ask the Planning Division whether any Pacifica ordinance allows it.
For tiny homes, Pacifica's adopted residential code includes Appendix BB (Tiny Homes)7, but we could not find the zoning rule on where a tiny home may be occupied. Confirm with the Planning Division before buying. Flood rules also apply to anything built in a mapped flood hazard area21.
Building a home in Pacifica: the steps, in order
- Confirm the lot's zoning district (R-1, R-M or another) with the Planning Division, and check lot size and setbacks13.
- Ask whether the lot is on the municipal sewer; if not, contact County Environmental Health about a septic permit520.
- Check flood hazard mapping, because development in flood hazard areas carries city standards21.
- Apply for the building permit through the city's online permit portal2.
- Schedule inspections through the Building Inspection Hotline2.
What stays with San Mateo County, and what to check before you buy in Pacifica?
County Environmental Health keeps septic and well permits56. For land outside Pacifica's city limits, the county's own rules apply; see the San Mateo County page.
On cost, San Mateo County's effective property tax rate is about 0.6 percent22. Before you buy, confirm the zoning district, sewer status, flood zone and permit exemptions with the offices above.
Watch-outs
- Inside Pacifica, San Mateo County's unincorporated-area zoning and building rules do not apply; use the city's Planning and Building Divisions123.
- We could not confirm Pacifica's rules for living in an RV or tiny home on private land, so ask the Planning Division before relying on either10.
- Larger developments in flood hazard areas must identify the special flood hazard area and base flood elevation21.
Sources
- Pacifica Code Sec. 9-4.402 R-1 Development regulations (Pacifica), quoted and re-checked
- City of Pacifica Community Development, Building Division (cityofpacifica.org)
- City of Pacifica Community Development, Planning Division (cityofpacifica.org)
- Apply for a Permit, quoted and re-checked
- Land Use, Septic & Wells, quoted and re-checked
- Land Use, Septic & Wells, quoted and re-checked
- Pacifica Code Sec. 8-7.5.01 Adoption of the California Residential Code (Pacifica), quoted and re-checked
- Pacifica Code Sec. 9-4.402 R-1 Development regulations (Pacifica), quoted and re-checked
- Pacifica Code Sec. 9-4.2152 R-M Development regulations (Pacifica), quoted and re-checked
- hcd.ca.gov (California statewide rule), quoted and re-checked
- Owner-Builder Overview, quoted and re-checked
- Get Zoning Information, quoted and re-checked
- Pacifica Code Sec. 9-4.402 R-1 Development regulations (Pacifica), quoted and re-checked
- Pacifica Code Sec. 9-4.402 R-1 Development regulations (Pacifica), quoted and re-checked
- Pacifica Code Sec. 9-4.402 R-1 Development regulations (Pacifica), quoted and re-checked
- Pacifica Code Sec. 9-4.2152 R-M Development regulations (Pacifica), quoted and re-checked
- Pacifica Code Sec. 9-4.2152 R-M Development regulations (Pacifica), quoted and re-checked
- Land Use, Septic & Wells, quoted and re-checked
- Land Use, Septic & Wells, quoted and re-checked
- San Mateo County Environmental Health Services (smcgov.org)
- Pacifica Code Sec. 7-5.503 Flood standards for subdivisions and other development (Pacifica), quoted and re-checked
- Effective property tax rate: Bolthole Index county data
Written October 16, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.