Unincorporated San Juan County, Colorado requires building permits through the county Building Department and zoning review through County Planning12. Inside Silverton, the town handles building permits and zoning34. Septic applications and inspections for San Juan County, including Silverton, go through La Plata County Public Health; San Juan County Public Health receives fees and finalizes septic permits5.
At a glance
- Building permit
- Required in unincorporated San Juan County; adopted building codes apply16
- Zoning
- County Planning handles unincorporated land; Silverton has town zoning24
- Septic (OWTS)
- Permit required; La Plata Public Health takes applications and inspects, San Juan Public Health receives fees and finalizes5
- RV living
- Not confirmed; ask County Planning before occupying an RV on private land7
- Tiny home
- State approval and compliance with local zoning are required for long-term living8
- Owner-builder exemption
- Limited state exemptions cover some owner-performed work, not a blanket exemption for a new home9
- Well permit
- Required from the Colorado Division of Water Resources for a new groundwater well10
- Conventional septic soils
- Only 0.2% of soils are rated not limited for conventional drain fields; site evaluation may show an engineered system is needed11
Who to call
Building permits
San Juan County Building Department
Building permits, building-code administration and inspection scheduling in San Juan County
Planning & zoning
Land-use review, zoning compliance, addressing, sign permits and nonresidential site-development administration
1557 Greene St, PO Box 466, Silverton CO 81433
Contact details are copied from each office’s official page and were checked against it on October 10, 2026.
Off-grid gear
Going off-grid in San Juan County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in San Juan County, Colorado?
Unincorporated San Juan County requires building permits, and the county Building Department administers adopted codes; the published building page does not identify code editions1612. Inside Silverton, the town handles building permits, including permits for accessory structures of 120 square feet or larger3. Septic applications and inspections remain with La Plata County Public Health, with San Juan County Public Health finalizing septic permits5. The county-hosted Silverton fee schedule adds plan review to the building permit fee: 50% for IRC permits and 65% for IBC permits, with double fees for work begun before permit issuance13. That schedule does not establish fees for unincorporated land; ask the county Building Department for the applicable fee and project thresholds, including repairs and agricultural buildings1415. Colorado’s county-contractor licensing exemption covers owner-performed repair or maintenance, rather than a blanket exemption for a new home9.
Who issues San Juan County building permits, and how do you reach them?
The San Juan County Building Department administers adopted building codes and schedules inspections; call 970.946.9031 for information or an inspection appointment156. For unincorporated land, San Juan County Planning evaluates land-use proposals, provides zoning compliance and handles addressing162. Reach Planning at admin@sanjuancolorado.us or 1557 Greene St, PO Box 466, Silverton CO 8143316. Start with the county’s property-development planning packet and ask which land-use, improvement and driveway applications apply to your parcel17. The county publishes building applications and inspection-contact instructions, but the published process does not establish every approval, deadline or exception17.
Does San Juan County have zoning?
San Juan County Planning handles zoning compliance and land-use review for unincorporated land2. Inside Silverton, the town’s own Land Use Code establishes zoning districts and a use table; county zoning should not be used to decide what is allowed inside town limits4. Septic applications and inspections for properties in either jurisdiction go through La Plata County Public Health, while San Juan County Public Health finalizes septic permits5. For county-administered subdivisions, planned unit developments, conditional-use permits and rezones, the Planning Commission reviews proposals and makes recommendations to the Board of County Commissioners18. We could not confirm county minimum lot sizes, setbacks, lot-coverage or height limits; ask County Planning for the parcel’s district and site standards before choosing a house footprint216.
How do septic permits work in San Juan County?
Anyone installing, constructing, altering or repairing an onsite wastewater treatment system in San Juan County must first obtain a septic permit5. La Plata County Public Health receives applications and designs and inspects permitted construction under a service order; San Juan County Public Health receives fees and signs off on and finalizes permits based on La Plata’s recommendations5. The county’s environmental-health page also directs owners to La Plata County Public Health for OWTS inspections19. San Juan County septic fees match La Plata County’s and are listed on the application5. Only 0.2% of county soils are rated not limited for conventional drain fields, so obtain a site evaluation and allow for a possible engineered system; the rating does not mean septic is impossible11. For buildings without sewer service, Colorado requires the OWTS permit before construction approval and final inspection and installation approval before occupancy approval20.
Can you live in an RV or tiny home on your land in San Juan County?
We could not confirm a San Juan County rule allowing long-term RV occupancy or temporary camping on private land, so ask County Planning about the parcel, duration and utility arrangement before moving an RV onto the site716. A Colorado Division of Housing-regulated tiny home intended for long-term living has a clearer state path: plans must be approved by the Colorado Division of Housing before construction, the unit must meet applicable state standards and local zoning, and certification is tied to its installation site8. Manufactured homes likewise may be installed only where local zoning allows and remain subject to state installation requirements21. State approval does not replace local zoning review in unincorporated San Juan County78.
What are the steps to build a home in unincorporated San Juan County?
- Ask San Juan County Planning to identify the parcel's zoning and the land-use or improvement applications that apply1617.
- Confirm legal access and ask whether the county's published driveway application applies; direct access to a state highway requires a CDOT access permit2223.
- Establish water: every new Colorado groundwater well requires a Division of Water Resources permit, subject to statutory and basin-specific conditions10.
- If sewer is unavailable, submit the OWTS application and design to La Plata County Public Health and obtain San Juan County Public Health’s finalized permit before building approval520.
What should you check before buying land in San Juan County?
Only 24.7% of San Juan County land has a slope of 15% or less, while 90.1% is federal land, so a private parcel can face steep terrain and access constraints2526. Conventional septic suitability is unusually limited, with only 0.2% of soils rated not limited for conventional drain fields; a site evaluation may identify an engineered-system option11. Confirm whether the parcel has sewer service or needs an OWTS, and confirm a lawful water source; every new groundwater well requires a state permit2010. Ask Planning about zoning, hazards, driveway review and prior subdivision approval because the county regulates subdivision proposals and publishes development applications1817. The effective property-tax rate is 0.3%, and the median annual property-tax bill is $1,195, but parcel-specific assessments can differ2728.
Watch-outs
- Colorado's county-contractor provision exempts only repair or maintenance on an owner's property, not all self-performed work or construction of a new home; ask the Building Department what permits and licensed trades the project requires915.
- Only 0.2% of San Juan County soils are rated not limited for conventional drain fields; investigate site-specific OWTS feasibility and possible engineered systems before buying11.
- Long-term RV occupancy, temporary private-land camping, setbacks and minimum dwelling size were not confirmed; get parcel-specific answers from San Juan County Planning716.
Sources
- San Juan County Colorado - Building Department (2026 county census)
- Planning | San Juan County Colorado, quoted and re-checked
- Town of Silverton: Silverton Municipal Code § 15-3-60, Accessory uses and structures (San Juan County), quoted and re-checked
- Town of Silverton: Silverton Municipal Code § 15-3-40, Use table (San Juan County), quoted and re-checked
- La Plata County Septic Systems, quoted and re-checked
- Building | San Juan County Colorado, quoted and re-checked
- Planning | San Juan County Colorado (2026 county census)
- Consumers of Manufactured Homes and Tiny Homes - HUD (Colorado statewide rule), quoted and re-checked
- Colorado Revised Statutes 2026, Title 30, § 30-11-125 (Colorado statewide rule), quoted and re-checked
- Water Administration (Colorado statewide rule), quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Building, quoted and re-checked
- Building Permit Fee Schedule, quoted and re-checked
- Building Permit Fee Schedule, quoted and re-checked
- San Juan County Building Department (sanjuancounty.colorado.gov)
- San Juan County Planning (sanjuancounty.colorado.gov)
- Building | San Juan County Colorado, quoted and re-checked
- Planning, quoted and re-checked
- Environmental Health | San Juan County Colorado, quoted and re-checked
- Title 25 - Public Health and Environment - Colorado Revised Statutes 2024 (Colorado statewide rule), quoted and re-checked
- Consumers of Manufactured Homes and Tiny Homes - HUD (Colorado statewide rule), quoted and re-checked
- Planning, quoted and re-checked
- Access Permits | Frequently Asked Questions (Colorado statewide rule), quoted and re-checked
- Title 25 - Public Health and Environment - Colorado Revised Statutes 2024 (Colorado statewide rule), quoted and re-checked
- Share of land at 15% slope or less: Bolthole Index county data
- Federal land share: Bolthole Index county data
- Effective property tax rate: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
Written October 10, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.