Bolthole Index

Bradford County, Florida

Building permits, zoning and land rules in Hampton, Florida

Hampton, Florida building work covered by the Florida Building Code generally needs a building permit through Bradford County’s building-permit process.1 Hampton handles local zoning, while the Florida Department of Health in Bradford County handles septic permits and inspections.23 Hampton requires residential buildings to connect to public water, so a home inside city limits needs a different water plan from a rural well-dependent property.4

At a glance

Building permits
Generally required for code-covered work; Bradford County building-permit process1
Zoning
Hampton local zoning department; ask the city for parcel-specific standards2
Septic permits
Florida Department of Health in Bradford County3
Public water
Residential buildings must connect; written city permission required for connection work4
Owner-builder
Available for qualifying homes for the owner’s use; building permits and inspections still apply5
Floodplain development
Additional Hampton floodplain approval may be required, including for code-exempt development6
Building permit fees
Published minimum $54; project cost varies with work type, area and contract price7

Who to call

Zoning

Hampton City Clerk/City Administrator

City contact for Hampton zoning inquiries, water connections and referral to the city Floodplain Administrator

(352) 468-1201

clerk@hamptonfl.gov

5784 Navarre Avenue | PO Box 250 Hampton, Florida 32044

Building permits

Bradford County Building Department

Building-permit applications and inspections through the county process identified for Hampton projects

(904) 966-6223 Ex 2

945 N. Temple Ave, Starke FL 32091

Septic permits

Florida Department of Health in Bradford County

Septic system permitting and inspections for Hampton addresses

904-964-7732

HealthyBradford@FLHealth.gov

1801 N. Temple Ave. Starke, FL 32091

Contact details are copied from each office’s official page and were checked against it on October 11, 2026.

Off-grid gear

Going off-grid in Hampton means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Hampton, FL?

Hampton building work covered by the Florida Building Code generally requires a building permit, including new structures, additions, alterations, repairs, demolition and moving a used mobile home.1 Hampton’s code also contains a local Residential Code amendment for flood-hazard construction; the amendment leaves other Florida Building Code provisions unchanged.8

Bradford County’s building-permit process identified for Hampton lists a minimum building permit cost of $54, with actual charges depending on work type, square footage, contract price or both.7 Treat that minimum as a starting point for a project estimate, and ask the Building Department for the fee calculation for your proposed work.7

Who issues building permits in Hampton, and where do you apply?

Hampton projects use the Bradford County building-permit application process, which accepts applications by email, mail or in person and asks for correctly titled PDFs.9 The Bradford County Building Department is in the courthouse’s north wing; use the verified office contact below to ask which application and supporting documents fit your project.10

For Hampton construction, the building official must inspect work before the work is covered or concealed; premature covering can mean uncovering the work at the owner’s or contractor’s expense.11 Arrange the inspection sequence before closing walls or otherwise hiding work, and use the department’s inspection scheduling contact.1110

Does Hampton have zoning, and can you live in an RV or tiny home?

Hampton has a local zoning department: Bradford County directs Hampton zoning inquiries to the city rather than its county zoning counter.2 Contact the Hampton City Clerk/City Administrator for the correct city zoning contact and request the zoning designation for the exact parcel.12

We could not confirm Hampton’s general private-land RV occupancy, temporary camping, tiny-home occupancy or accessory-dwelling rules; ask Hampton’s zoning department about your intended use before buying.12 We also could not confirm Hampton’s district-specific minimum lot size, minimum dwelling size, setbacks, lot coverage or height limits; request the applicable district schedule from the city.12 For a manufactured home, Florida requires an installation inspection and a certificate of occupancy after compliant installation, while local zoning and setbacks still matter.13

How do septic permits and water connections work inside Hampton?

Septic permits and inspections for Hampton addresses come from the Florida Department of Health in Bradford County, even though Hampton handles local zoning.32 Florida requires a septic permit for installation, replacement, repair, modification or abandonment, and a site evaluation determines property conditions and system suitability.14

Only 1.5% of Bradford County soils are rated not limited for conventional septic drain fields; that countywide figure does not decide a Hampton lot’s suitability or mean septic is impossible, so plan around a site evaluation and possible engineered system.15 Hampton requires residential, commercial and industrial buildings to connect to public water, and connecting to or interfering with a water connection requires written city permission.4 Ask the city about connection arrangements and the health department about the proposed septic layout before committing to a house site.414

Building a home in Hampton: what are the steps, in order?

  1. Ask Hampton’s local zoning department for the parcel’s zoning designation and written answers about your proposed dwelling, setbacks and any temporary accommodation.212
  2. Ask the city about public-water connection arrangements and whether Hampton floodplain approval is needed for the site.46
  3. If the home will use septic, arrange the site evaluation and septic application with the Florida Department of Health in Bradford County.143
  4. Submit the building application through the Bradford County process; if acting as an owner-builder, personally sign the application and satisfy the agency’s requirements for direct supervision and your own occupancy.95
  5. Schedule building inspections before concealing work; obtain final septic installation approval before occupying a septic-served building.1116

What should you check before buying land in Hampton?

Hampton floodplain development approval can apply to structures and activities exempt from the state building code, and the city Floodplain Administrator may require floodplain approval alongside a building permit.6 Ask the Hampton City Clerk/City Administrator for the floodplain contact before planning a code-exempt structure on the site.126

Florida’s agricultural exemption covers qualifying nonresidential farm buildings on bona fide agricultural land, excludes urban agriculture and preserves floodplain-management requirements; the exemption is not permission to use a barn as a residence.17 For land outside Hampton city limits, consult the Bradford County guide for the county’s zoning jurisdiction; Hampton has its own local zoning department.2 We could not confirm Hampton driveway-access or subdivision standards; request those answers from the city before assuming a tract can be divided or accessed as planned.12

Watch-outs

  • Hampton’s mandatory public-water connection rule applies to residential buildings; do not budget for a well as a substitute without discussing the proposed water arrangement with the city.4
  • Florida’s owner-builder exemption does not remove building-permit, inspection or zoning obligations for a Hampton home.5
  • The Bradford County Building Department posts a temporary morning closure on weekdays other than Friday; check the department’s current notice before visiting.10
  • We could not confirm permission to occupy an RV or tiny home on private land in Hampton; ask the city zoning department before making that your construction-period housing plan.12

Sources

  1. Building – FAQ’s – Bradford County, Florida (Hampton), quoted and re-checked
  2. Planning & Zoning – Bradford County, Florida, quoted and re-checked
  3. Onsite Sewage Disposal - Florida Department of Health in Bradford County (Hampton), quoted and re-checked
  4. Sec. 32-85. Mandatory connection (Hampton), quoted and re-checked
  5. 2026 Florida Statutes § 489.103, Exemptions (Florida statewide rule), quoted and re-checked
  6. Sec. 18-83. Floodplain development permits or approvals (Hampton), quoted and re-checked
  7. Building – FAQ’s – Bradford County, Florida (Hampton), quoted and re-checked
  8. Sec. 6-20. Florida Building Code, Residential amendment (Hampton), quoted and re-checked
  9. Building Department – Bradford County, Florida (Hampton), quoted and re-checked
  10. Bradford County Building Department (bradfordcountyfl.gov)
  11. Building – FAQ’s – Bradford County, Florida (Hampton), quoted and re-checked
  12. Hampton City Clerk/City Administrator (hamptonfl.com)
  13. Florida Statutes § 320.8285: Onsite inspection (Florida statewide rule), quoted and re-checked
  14. OSTDS Construction Application (Florida statewide rule), quoted and re-checked
  15. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  16. Chapter 553 Section 79 - 2026 Florida Statutes, quoted and re-checked
  17. Florida Statutes § 604.50, Nonresidential farm buildings; farm fences; farm signs (Florida statewide rule), quoted and re-checked

Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Hampton

Hampton’s own rules

  • Building code adoptedPartial

    Residential construction in Hampton city; the city code adopts a local technical amendment to the Florida Building Code, Residential for flood-hazard construction.

    • The cited section amends only the listed Residential Code provisions; other Florida Building Code provisions remain unchanged.
    “The Florida Building Code, Residential is hereby amended by the following technical amendments to read as follows:”
  • InspectionsRequired

    Manufactured homes installed or replaced in Hampton city flood hazard areas.

    • Inspection is by the floodplain administrator.
    • Upon placement, certification of the lowest-floor elevation must be submitted to the floodplain administrator.
    “The floodplain administrator shall inspect manufactured homes that are installed or replaced in flood hazard areas to determine compliance with the requirements of this article and the conditions of the issued permit.”
  • Mandatory utility hookupWater (with conditions)

    Residential, commercial, and industrial buildings inside Hampton city limits.

    • A written city permit is required before a person connects to or interferes with a water connection or appurtenance.
    “All buildings that are used for residential, commercial, or industrial purposes shall be required to connect to the public water system.”
    One more reviewed finding on this topic
    • Water (with conditions) — All residential, commercial, and industrial buildings inside Hampton city limits.
      “All buildings that are used for residential, commercial, or industrial purposes shall be required to connect to the public water system.”
  • Building in a floodplainRequired

    Development activities in Hampton city flood hazard areas that are not subject to the state building code.

    • A floodplain development permit or approval is required for covered development, including buildings, structures, and facilities exempt from the state building code.
    • For development involving buildings or structures, the floodplain administrator may require a floodplain permit in addition to a building permit.
    • Other applicable state or federal permits must be obtained before commencement.
    “Floodplain development permits or approvals shall be issued pursuant to this article for any development activities not subject to the requirements of the state building code”
    One more reviewed finding on this topic
    • Required — Development in Hampton city flood hazard areas not subject to State Building Code requirements, including exempt buildings, structures, and facilities.
      “Floodplain development permits or approvals shall be issued pursuant to this article for any development activities not subject to the requirements of the state building code, including buildings, structures and facilities exempt from the state building code.”
  • Permit processPartial

    Development in Hampton city flood hazard areas that is not subject to State Building Code requirements.

    • The process applies to development activities not subject to State Building Code requirements, including exempt buildings, structures, and facilities.
    • Depending on the nature and extent of development including a building or structure, the floodplain administrator may require floodplain approval in addition to a building permit.
    “Floodplain development permits or approvals shall be issued pursuant to this article for any development activities not subject to the requirements of the state building code, including buildings, structures and facilities exempt from the state building code. Depending on the nature and extent of proposed development that includes a building or structure, the floodplain administrator may determine that a floodplain development permit or approval is required in addition to a building permit.”

Rules another office applies inside Hampton

Hampton does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Building permitRequired

    Building work in Hampton city handled through the Bradford County building-permit process.

    • The county FAQ states that work covered by the Florida Building Code will most likely require a permit.
    • Examples include new structures, additions, alterations, repairs, moving or demolishing a building, moving a used mobile home, and commercial or industrial occupancy changes.
    “items that are required to be permitted:”
  • Who permits septicState (with conditions)

    Onsite sewage treatment and disposal systems proposed inside Hampton city limits.

    • The city requires applicable state permits before commencement of permitted floodplain development or building-permit development.
    • The cited city provision identifies the State department of health and cites F.S. § 381.0065 and F.A.C. ch. 64E-6.
    “State department of health for onsite sewage treatment and disposal systems; F.S. § 381.0065 and F.A.C. ch. 64E-6.”
    One more reviewed finding on this topic
  • Septic permitRequired

    Onsite sewage treatment and disposal systems serving permitted development inside Hampton city limits.

    • All applicable state or federal permits must be obtained before commencement of permitted development.
    • The city specifically identifies the State department of health for onsite sewage treatment and disposal systems.
    “Floodplain development permits and building permits shall include a condition that all other applicable state or federal permits be obtained before commencement of the permitted development, including, but not limited to, the following: (1) The Suwannee River Water Management District; F.S. § 373.036. (2) State department of health for onsite sewage treatment and disposal systems; F.S. § 381.0065 and F.A.C. ch. 64E-6.”
  • Agricultural exemptionAvailable (with conditions)

    Nonresidential farm buildings on farms inside Hampton city, if otherwise eligible under the Florida Building Code.

    • The parcel must have an Agricultural Exemption from the Property Appraiser.
    • This exemption applies to nonresidential farm buildings, not ordinary residential construction.
    “(c) Nonresidential farm buildings on farms. (Must have an Agricultural Exemption from the Property Appraiser on the parcel you want to build the farm building on)”
  • Permit feesPublished

    Bradford County building permits processed for Hampton city.

    • The minimum permit cost is $54.00, consisting of a $50 permit and a $4 state surcharge.
    • Actual cost depends on the work type, square footage, contract price, or both.

    minimum permit cost: 54 USD ($50 permit plus $4 state surcharge)

    “The cost is based on a variety of factors; depending on the type of work being done. The square footage of the work, the contract price of the work, or both are used in the calculation of permit fees. The minimum cost for any permit is $54.00 (the permit being $50 & a $4 state surcharge fee).”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Hampton or Bradford County directly.

  • Owner-builder exemption — Owner-built residential construction inside Hampton city limits.
  • Certificate of occupancy — Residential construction inside Hampton city limits.
  • Local zoning — Land inside Hampton city limits.
  • Zoning districts — Published zoning districts and district map for Hampton city limits.
  • Minimum dwelling size — Minimum dwelling size inside Hampton city limits.
13 more unanswered
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Septic inspection
  • Well permit
  • Subdividing land
  • Driveway access
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Hampton publishes no rule on the point, not that none exists. Bradford County’s page lists the county offices to call.

← All of Bradford County: county rules, score and offices