Building permits, zoning and septic in the Town of Haralson, Georgia

The Town of Haralson, Georgia publishes residential building applications and zoning resources; start with the City Clerk for the building-permit requirements for your project.1 Haralson’s RD district requires a minimum lot of 5 acres, and camping-trailer occupancy is barred outside an authorized travel trailer court.23 For a Haralson parcel in Coweta County, septic construction approval comes from the County Board of Health rather than the town zoning office.4

At a glance

Building permits
Town publishes residential, commercial and accessory-building applications; ask the City Clerk about your project1
Zoning
Town district rules apply; RD minimum lot is 5 acres2
Septic permits
County Board of Health construction permit required; site must be suitable4
RV living
No temporary or permanent camping/travel-trailer occupancy outside an authorized travel trailer court3
Minimum home size
RD: 1,600 square feet; R-40: 1,500; RC: 2,000567
Owner-builder
State contractor-license exemption for building your own home; local requirements still apply8
Private wells
Contractor must contact county health department before drilling; local well-permit requirements vary9

Who to call

Building permits

Haralson City Clerk

Municipal contact for building applications, rezoning resources and questions about the applicable building and zoning offices

770-599-3985

cityclerk@cityofharalson.org

171 Magnolia Street, Senoia, GA 30276

Septic permits

Coweta County Environmental Health Office

County environmental-health contact for septic and well questions on the Coweta County side of Haralson

(770) 683-7345

Contact details are copied from each office’s official page and were checked against it on October 11, 2026.

Off-grid gear

Going off-grid in Town of Haralson means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in the Town of Haralson, GA?

Haralson’s municipal website publishes residential, commercial and accessory-building applications, along with electrical, mechanical and plumbing applications.1 We could not confirm the general building-permit requirement or the issuing building official for every project inside Haralson; ask the City Clerk to identify the application and reviewing office before starting work.1 Construction in Haralson is subject to Georgia’s mandatory minimum construction codes.10 An owner building a personal home can qualify for Georgia’s contractor-license exemption, but that exemption does not waive local building codes, building permits, inspections or zoning requirements.8

Who handles building applications and zoning questions in the Town of Haralson?

The Haralson City Clerk is the municipal contact listed with the town’s building applications and zoning resources: call 770-599-3985 or email cityclerk@cityofharalson.org.1 The municipal resources page links a guide to permitting, permit fees, residential building applications, rezoning information and a zoning map.1 Ask the City Clerk which building official will review the plans, what inspections the project requires and which fee schedule applies.1 We could not confirm a complete general construction approval sequence inside Haralson, so obtain the project-specific requirements from that municipal contact before committing to a construction schedule.1

Does the Town of Haralson have zoning, minimum lot sizes and home-size rules?

Haralson’s Rural Development district, RD, requires a minimum zoning lot area of 5 acres and a minimum dwelling floor area of 1,600 square feet.25 Haralson’s R-40 district requires at least 1,500 square feet per dwelling unit, while the RC Conservation Subdivision district requires 2,000 square feet.67 The RC district refers minimum lot area to Article 14 rather than stating the same acreage as RD.11 Use the town’s zoning map and ask the City Clerk to confirm the parcel’s district before choosing a house plan; the dimensional rules depend on that district.1567

How do septic permits and private wells work inside the Town of Haralson?

Georgia requires a County Board of Health construction permit for a new septic system and for repairs, replacements or additions; the site must be suitable before approval.4 Septic construction permits last no more than 12 months from issuance.4 For a Haralson address on the Coweta County side, contact Coweta County Environmental Health at (770) 683-7345 about the application and site review.12 A private-well contractor must contact the local county health department in advance for site review; some counties also require a well-construction permit, so ask about the requirement for the parcel.9

Can you live in an RV or tiny home in the Town of Haralson?

Haralson prohibits temporary or permanent occupancy of a camping or travel trailer while parked or stored except in an authorized travel trailer court.3 That restriction also applies to temporary camping, so do not plan on occupying a trailer on a residential lot while building.13 We could not confirm a separate tiny-home occupancy rule; a small dwelling proposal still needs review against the parcel’s district floor-area requirement.567 Haralson also prohibits separate self-contained accessory living quarters outside a permitted dwelling except in RD; the ordinance describes such quarters as including kitchen facilities, a bath and a bedroom area.14

What should you do before building a home in the Town of Haralson?

  1. Ask the Haralson City Clerk to confirm the parcel’s zoning district and direct you to the applicable building application and building official.1
  2. Match the proposed home and lot to the town’s district standards; RD, R-40 and RC have different minimum dwelling sizes.567
  3. Arrange the County Board of Health septic site review and construction permit if the home will use septic.4
  4. Ask the municipal contact about unresolved driveway, floodplain, setback and fee requirements before finalizing the site plan.1

For land outside Haralson, use the Coweta County guide for the county’s building-permit process rather than assuming the town application applies.15

Watch-outs

  • Haralson’s camping/travel-trailer rule bars temporary occupancy as well as permanent occupancy outside an authorized travel trailer court.3
  • Haralson’s RD accessory-living-quarters exception does not itself establish approval for every tiny-home proposal; ask the City Clerk about the proposed use.141
  • For a pre-owned manufactured home in Haralson, the building inspector must certify ordinance compliance before a certificate of occupancy is issued.16

Sources

  1. Haralson City Clerk (cityofharalson.org)
  2. Rural Development District (RD) (Town of Haralson), quoted and re-checked
  3. Storage and parking of trailers and commercial vehicles (Town of Haralson), quoted and re-checked
  4. Manual for On-Site Sewage Management Systems (Georgia statewide rule), quoted and re-checked
  5. Rural Development District (RD) (Town of Haralson), quoted and re-checked
  6. Single Family Residential District (R-40) (Town of Haralson), quoted and re-checked
  7. Conservation Subdivision District (RC) (Town of Haralson), quoted and re-checked
  8. Residential and Commercial General Contractors Frequently Asked Questions (Georgia statewide rule), quoted and re-checked
  9. Water Well Standards (Georgia statewide rule), quoted and re-checked
  10. Current State Minimum Codes for Construction (Town of Haralson), quoted and re-checked
  11. Conservation Subdivision District (RC) (Town of Haralson), quoted and re-checked
  12. Coweta County Environmental Health Office (dph.georgia.gov)
  13. Storage and parking of trailers and commercial vehicles (Town of Haralson), quoted and re-checked
  14. Code of Ordinances, Appendix A—Zoning, § 7.4 Accessory Uses and Structures (Town of Haralson), quoted and re-checked
  15. Building Permits & Inspections, quoted and re-checked
  16. library.municode.com (Town of Haralson), quoted and re-checked

Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Town of Haralson

Town of Haralson’s own rules

  • Building permitRequired

    Locating a pre-owned manufactured home in Haralson town.

    • Applicant must provide the listed affidavit, photographs, refundable $1,000 condition bond or cash deposit, and permit and inspection fee.
    • The provision governs pre-owned manufactured homes, not all residential construction.

    condition bond or cash deposit: 1000 USD (Refundable guarantee of condition bond or refundable cash deposit.)

    “A permit shall be required to locate a pre-owned manufactured home in the jurisdiction.”
  • InspectionsRequired

    Pre-owned manufactured homes after installation in Haralson town.

    • Applicant must arrange the inspection after installation is complete.
    • An alternative pre-relocation inspection is discretionary and does not remove other necessary inspections.
    “Applicant shall arrange for an inspection to be held once the installation of the manufactured home is complete.”
  • Certificate of occupancyRequired

    Pre-owned manufactured homes located in Haralson town.

    • Issued when the building inspector certifies the ordinance's requirements have been met.
    • The cited requirement is specific to pre-owned manufactured homes.
    “A certificate of occupancy shall be issued to the Applicant at such time that the building inspector certifies that the requirements of this ordinance have been met.”
    One more reviewed finding on this topic
    • Limited — Pre-owned manufactured homes inside Haralson town.
      “Certificate of Occupancy. A certificate of occupancy shall be issued to the Applicant at such time that the building inspector certifies that the requirements of this ordinance have been met.”
  • Local zoningPresent (with conditions)

    Land inside Haralson town limits subject to Appendix A—Zoning.

    • District-specific requirements and permitted uses apply.
    “It is intended that the RD zoning district be reserved and developed for low-density residential purposes where agriculture-type conditional uses would be expected.”
  • Zoning districtsPublished (with conditions)

    Zoning districts inside Haralson town limits.

    • The supplied code expressly identifies RD, R-40, and RC residential districts; other districts may appear elsewhere in Appendix A.
    “The following uses shall be permitted in any RC residential zoning district: 1. As specified in Table 5.8: Permitted Uses. 2. Single-family detached dwellings.”
  • Minimum dwelling sizeSpecified

    Single-family dwelling units in the R-40 zoning district inside Haralson town.

    minimum floor area per dwelling unit: >= 1500 square feet

    “Minimum floor area per dwelling unit: 1,500 square feet.”
    2 more reviewed findings on this topic
    • Specified — Single-family dwelling units in the RD zoning district inside Haralson town.
      “Minimum floor area per dwelling unit: 1,600 square feet.”
    • Specified — Single-family dwelling units in the RC zoning district inside Haralson town.
      “Minimum floor area per dwelling unit: 2,000 square feet.”
  • Minimum lot sizeDistrict specific (with conditions)

    Single-family residential lots in RC inside Haralson town.

    • The RC section directs the reader to Article 14 for the minimum zoning lot area.
    “Minimum zoning lot area: As specified in Article 14.”
    One more reviewed finding on this topic
    • Specified — Single-family residential lots in RD inside Haralson town.
      “Minimum zoning lot area: Five (5) acres.”
  • Living in an RVProhibited

    Camping or travel trailers parked or stored on residential lots inside Haralson town limits.

    • Occupation is allowed only in a travel trailer court authorized under the Code.
    • The rule addresses camping or travel trailers; it does not establish all rules for every RV type.
    “A camping or travel trailer shall not be occupied either temporarily or permanently while it is parked or stored in any area except in a travel trailer court authorized under this Code.”
    One more reviewed finding on this topic
    • Limited — Camping or travel-trailer occupancy on residential or dwelling lots inside Haralson town.
      “A camping or travel trailer shall not be occupied either temporarily or permanently while it is parked or stored in any area except in a travel trailer court authorized under this Code.”
  • Camping on your landLimited

    Temporary camping in a camping or travel trailer inside Haralson town.

    • Temporary occupancy is barred while the trailer is parked or stored, except in an authorized travel trailer court.
    “A camping or travel trailer shall not be occupied either temporarily or permanently while it is parked or stored in any area except in a travel trailer court authorized under this Code.”
  • Manufactured homesLimited

    Industrialized homes, manufactured homes, and modular buildings in Haralson town residential zoning districts.

    • Permitted in residential districts other than RC only if all listed appearance and installation standards are met.
    • Pre-owned manufactured homes require a permit and certificate of occupancy under § 5.10(A)(2)(c).

    minimum width: > 16 feet (Structure must be in excess of this width.)

    “Industrialized Homes, Manufactured Homes or Modular Buildings, as defined herein may be permitted in any residential zoning district other than the RC district, provided such buildings or structures meet the following standards:”
  • Accessory dwellingsLimited

    Separate, self-contained accessory living quarters on zoning lots inside Haralson town limits.

    • Exception: the restriction does not apply in the RD zoning district.
    • Self-contained living quarters include, at minimum, kitchen facilities, a bath, and a bedroom area.
    “No accessory use permitted by this section shall be constructed for the purpose of providing separate, self-contained living quarters outside a permitted dwelling on a zoning lot, except in the RD zoning district.”
  • Permit feesVariable (with conditions)

    Permits and inspections for pre-owned manufactured homes inside Haralson town limits.

    • Fee covers the initial inspection and one follow-up inspection.
    • Additional follow-up inspections are charged at the building inspector's discretion.
    • The fee must approximate the City's inspection-service cost.
    “The applicant shall pay a fee for each additional followup inspection that may be necessary, subject to the discretion of the building inspector.”
  • Permit processPartial

    Application to locate a pre-owned manufactured home in Haralson town.

    • Applicant must submit the materials listed in § 5.10(A)(2)(c)(1)-(4).
    • The five-business-day issuance language begins after receipt of all listed items.
    • The cited process does not establish the general building-permit process.

    permit issuance period: <= 5 business days (After receipt of all items listed in subsections (a)(1)—(4).)

    “All permits shall be issued within five (5) business days of receipt of all items listed in subsections (a)(1)—(4) of this section.”

Rules another office applies inside Town of Haralson

Town of Haralson does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Building code adoptedAdopted (with conditions)

    Construction inside Haralson town is subject to Georgia's mandatory state minimum construction codes.

    • The source identifies mandatory state minimum codes; local enforcement procedures and any local amendments may also apply.
    “The following are the current state minimum standard codes for construction as adopted by the Board of Community Affairs.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Town of Haralson or Coweta County directly.

  • Owner-builder exemption — Owner-builders constructing or locating homes inside Haralson town limits.
  • Lot coverage — Lots inside Haralson town limits.
  • Tiny homes — Tiny-home occupancy inside Haralson town.
  • Who permits septic — On-site sewage disposal inside Haralson town limits.
  • Septic permit — On-site sewage systems inside Haralson town limits.
9 more unanswered
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Town of Haralson publishes no rule on the point, not that none exists. Coweta County’s page lists the county offices to call.

← All of Coweta County: county rules, score and offices