The Village of Chatham, Illinois, in Sangamon County, runs its own zoning under Chapter 158 of the village code1 and requires a village building permit for new structures, fences, pools and most alterations2. Sangamon County's Department of Public Health receives septic permit applications countywide3. Whether a lot inside the village must use public sewer is not confirmed, so ask the village first.
At a glance
- Building permit
- Required inside village limits for new structures, fences, pools and most alterations2
- Zoning
- Village's own zoning (Chapter 158) with published districts14
- Building codes
- 2018 International Building and Residential Codes adopted5
- Owner-builder
- Homeowners are exempt from contractor registration only, not from permits6
- Septic
- County Department of Public Health receives applications; sewer connection inside the village not confirmed3
- R-1 minimum lot
- 12,000 sq ft and 80 ft wide7
- R-1 height limit
- 35 ft8
Who to call
Building permits
Village of Chatham (code enforcement, building codes and zoning)
Building permits, building inspections and zoning questions inside Chatham village limits
116 E. Mulberry Street Chatham, IL 62629
Building permits
Village of Chatham FAQs (permit guidance)
Village guidance on when a building permit is needed
Septic permits
Sangamon County Department of Public Health, Environmental Health
Septic system permits and private well permits (county health department)
2833 South Grand Avenue East Springfield, IL 62703-2175
Contact details are copied from each office’s official page and were checked against it on October 23, 2026.
Off-grid gear
Going off-grid in Village of Chatham means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Does Chatham, Illinois have zoning, and what does it mean for lot size and setbacks?
Yes. The Village of Chatham zones the land inside its limits under its own Chapter 1581, and the village code publishes the district list and boundaries4. Sangamon County's zoning applies to unincorporated land, not to lots inside the village9.
Dimensions depend on the district. In the R-1 single-family district, Chatham requires at least 12,000 square feet of lot area and 80 feet of lot width7. Setbacks in R-1 are 30 feet front, 30 feet rear, 10 feet interior side and 30 feet corner side, and the front setback can be averaged with adjacent homes10. The height limit is 35 feet8.
In R-1A, the minimum lot is 10,000 square feet and 70 feet wide11, with setbacks of 30 feet front, 25 feet rear, 8 feet interior side and 25 feet corner side12.
Do you need a building permit in Chatham, Illinois, and who issues it?
Yes. Inside Chatham village limits, the village requires a building permit for new structures, fences, swimming pools, satellite dishes, and repairs or alterations2. The village building code administrator issues the permit13. The village's own FAQ page says a building permit is needed for most structures, structural changes and fences14.
Some small jobs are exempt, such as remodeling that costs less than $1,000 and does not touch corridors, exit ways or load-bearing members2. Fees are set by the village board of trustees, and we did not confirm current amounts15. Call the village at 217-483-2451 with questions on code enforcement or building16.
What building codes and inspections apply inside Chatham?
Chatham has adopted the 2018 International Building Code and 2018 International Residential Code, the 2017 National Electrical Code, and the current Illinois Plumbing Code5. Work under a village permit is inspected in phases: site or stakeout, footing, framing, rough-in, fireplace if applicable, electric meter base, and final17. Inspections on weekends or after hours carry a $50 surcharge at the village's discretion17.
New construction cannot be occupied before a final inspection certificate is issued, except where the building code administrator makes written safety findings18. A homeowner doing work on their own dwelling is exempt from the village's contractor registration, but the permits still apply6.
How do septic permits work in Chatham, Illinois?
Septic permits for Sangamon County come through the county Department of Public Health, Environmental Health, which receives permit applications; the Illinois Department of Public Health regulates private sewage systems statewide19. Owners installing, repairing or replacing a system must hire a licensed septic contractor and a licensed soil scientist20.
We could not confirm whether a lot inside Chatham village limits must connect to public water or sewer, or whether the village allows a septic system there at all. Ask the village at 217-483-245116 before counting on septic, then call the county's environmental inspectors at 217-535-314521. Across Sangamon County, about 25% of soils rate as not limited for a conventional drain field, so many lots need a site evaluation22.
Can you live in an RV or tiny home in Chatham, Illinois?
We could not confirm the village's rules on long-term RV living, temporary camping, tiny homes or accessory dwellings. The village's use schedule determines what each district allows, and the village code section on off-street parking also mentions campers in residential districts. Ask the village at 217-483-245116 before parking an RV on a lot or planning a small dwelling.
Illinois law licenses campgrounds through the state health department, but that rule covers campgrounds, not an RV on a private lot23.
Building a home in Chatham: the steps, in order
- Confirm the lot is inside Chatham village limits, not unincorporated Sangamon County, since the two follow different rules24.
- Ask the village which zoning district the lot is in and whether public sewer and water serve it4.
- Check the district's lot size, setbacks and height limit10.
- Apply to the village building code administrator for a building permit13.
- If septic is allowed, hire a licensed septic contractor and soil scientist and apply through the Sangamon County Department of Public Health20.
- Schedule each inspection and get the final inspection certificate before moving in18.
What stays with Sangamon County, and what to check before you buy
Septic and private well permits stay with the Sangamon County Department of Public Health25. A driveway onto a county highway needs a permit from the Sangamon County Highway Department26; we did not confirm the village's own driveway rules. Land outside village limits follows the county's rules; see the Sangamon County page.
For budgeting, Sangamon County's effective property tax rate is about 2%27 and the median property tax bill is about $3,369 a year28. Ask the village about utility connections, flood status and any recorded restrictions on the specific lot.
Watch-outs
- We could not confirm whether septic systems are allowed inside Chatham village limits or whether new homes must connect to public sewer and water; call the village at 217-483-245116.
- The village's current building permit fee amounts were not confirmed; the village board of trustees sets them15.
- Homeowners doing their own work are exempt from contractor registration only; building, electrical, plumbing and mechanical permits still apply6.
- County rules on zoning and building permits apply to unincorporated land only; confirm a lot is inside Chatham before relying on the village rules24.
Sources
- Village of Chatham Code of Ordinances - Chapter 158: Zoning (Village of Chatham), quoted and re-checked
- Village of Chatham Code of Ordinances - Chapter 150: Building Regulations (150.23-150.29) (Village of Chatham), quoted and re-checked
- Environmental Health, quoted and re-checked
- Village of Chatham Code of Ordinances - Chapter 158: Zoning (Village of Chatham), quoted and re-checked
- Village of Chatham Code of Ordinances - Appendix A: Current codes adopted by reference (Village of Chatham), quoted and re-checked
- Village of Chatham Code of Ordinances - Chapter 150: Building Regulations (150.23-150.29) (Village of Chatham), quoted and re-checked
- Village of Chatham Code of Ordinances - 158.034 Schedule of height and bulk regulations by districts (Village of Chatham), quoted and re-checked
- Village of Chatham Code of Ordinances - 158.034 Schedule of height and bulk regulations by districts (Village of Chatham), quoted and re-checked
- Zoning, quoted and re-checked
- Village of Chatham Code of Ordinances - 158.034 Schedule of height and bulk regulations by districts (Village of Chatham), quoted and re-checked
- Village of Chatham Code of Ordinances - 158.034 Schedule of height and bulk regulations by districts (Village of Chatham), quoted and re-checked
- Village of Chatham Code of Ordinances - 158.034 Schedule of height and bulk regulations by districts (Village of Chatham), quoted and re-checked
- Village of Chatham Code of Ordinances - Chapter 150: Building Regulations (150.23-150.29) (Village of Chatham), quoted and re-checked
- Village of Chatham FAQs (permit guidance) (chathamil.gov)
- Village of Chatham Code of Ordinances - Chapter 150: Building Regulations (150.23-150.29) (Village of Chatham), quoted and re-checked
- Village of Chatham (code enforcement, building codes and zoning) (chathamil.gov)
- Village of Chatham Code of Ordinances - Chapter 150: Building Regulations (150.23-150.29) (Village of Chatham), quoted and re-checked
- Village of Chatham Code of Ordinances - Chapter 150: Building Regulations (150.23-150.29) (Village of Chatham), quoted and re-checked
- Environmental Health, quoted and re-checked
- Environmental Health, quoted and re-checked
- Sangamon County Department of Public Health, Environmental Health (sangamonil.gov)
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Youth Camps and Campgrounds (Illinois statewide rule), quoted and re-checked
- sangamonil.gov, quoted and re-checked
- sangamonil.gov, quoted and re-checked
- Highway Department, quoted and re-checked
- Effective property tax rate: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
Written October 23, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.