Iberville Parish, Louisiana requires a building permit before construction or remodeling in areas governed by the parish development code, and the Permits & Inspections Department oversees building permits and codes parishwide12. Unincorporated land is also subject to parish zoning, setbacks, inspections and a certificate of occupancy for permitted new construction, while the parish code does not apply inside incorporated towns such as Rosedale or Maringouin3456. Septic permits, in every town or not, come through the state health officer and the Iberville Parish Health Unit78.
At a glance
- Building permit
- Required before construction or remodeling under the parish development code1
- Permit applications
- Online only through the MGO Connect Customer Portal9
- Zoning
- Yes for unincorporated areas; local rules vary across incorporated jurisdictions310
- Septic permit
- Required from the state health officer; start with the Iberville Parish Health Unit78
- Owner-builder
- A conditional contractor-license exemption applies to a personal residence; permits and codes still apply11
- RV living
- Limited in RV parks and campgrounds; confirm a private parcel's zoning before occupancy1213
- Tiny homes
- No specific tiny-home rule confirmed; zoning, setbacks and occupancy approval still apply314
- Private well
- A licensed driller and state registration are required for a new water well15
Who to call
Building permits
Iberville Parish Permits & Inspections Department
Building, plumbing, electrical, mechanical, demolition, solar-panel and mobile-home permits, plus flood-zone management
58030 Meriam Street, Plaquemine, LA 70764
Septic permits
Local Environmental Health contact for Louisiana's onsite wastewater program
24705 Plaza Drive, Plaquemine, LA 70764
Zoning
Iberville Parish Planning Commission
Land-use policy, regulation interpretation and review of development and land-use proposals
58050 Meriam Street, Plaquemine, LA 70764
Contact details are copied from each office’s official page and were checked against it on October 9, 2026.
Off-grid gear
Going off-grid in Iberville Parish means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Iberville Parish, Louisiana?
Yes. In areas governed by the Iberville Parish development code, owners must secure a building permit before construction or remodeling, including a home, commercial building, major remodel or manufactured-home placement1. Iberville Parish also requires foundation and completion inspections for permitted construction; the completion inspection comes before occupancy or use begins5. Permitted new construction requires a certificate of occupancy under the parish code and applicable building laws6. The parish follows International Building Codes, although the available material does not identify the precise edition or amendments16. Building permits are also required for the installation of electrical wiring, plumbing or gas piping, reroofing and demolition17. Municipal requirements can differ, so a parcel inside municipal limits also needs confirmation from that municipality18.
Who issues Iberville Parish building permits, and how do you apply?
The Iberville Parish Permits & Inspections Department issues new-construction, plumbing, electrical, mechanical, demolition, solar-panel and mobile-home permits and administers flood-zone management14. All parish permit applications must be completed online through the MGO Connect Customer Portal, and applicants must create an account to start and manage an application9. The parish publishes a development-application fee schedule, while the permit page directs applicants to the department for permit-cost questions19. For project-specific plans, fees and inspection stages, call the department at (225) 687-515014. The permitting officer must issue, deny or request more information on a complete building-permit application within 30 days1.
Does Iberville Parish have zoning?
Unincorporated Iberville Parish has zoning, and the parish administers land-use planning and zoning compliance there3. The Permits & Inspections Department says its land-use planning covers the unincorporated areas, Plaquemine and White Castle2. The parish development code itself excludes the incorporated municipalities of Plaquemine, White Castle, Grosse Tete, Rosedale, Maringouin and St. Gabriel, and zoning varies among them318. For lots governed by the parish code, principal structures generally require at least 25 feet from a road and 10 feet from another property line; accessory structures generally require at least 25 feet from a road and 15 feet from another property line4. Planned developments may receive reduced setbacks with Planning Commission approval4. The parish also regulates division of parcels into multiple lots through Planning Commission review and sanitary, access, utility and infrastructure standards20. A numeric minimum dwelling size, general minimum lot size, lot-coverage limit and general height limit could not be confirmed; obtain the parcel's district standards from the Planning Commission21.
How do septic permits work in Iberville Parish?
Louisiana requires a state-health-officer permit before an individual sewerage system is installed, altered or operated, with parish health-unit sanitarians administering the process locally227. Start with the Iberville Parish Health Unit, which lists Environmental Health among its services23. In areas governed by the parish code, a property within 300 feet of a public sewer must connect when the servicing district certifies capacity; the applicant bears the required improvement and collection-system costs24. The parish code also tells developers to confer with the Parish Sanitarian, and in subdivisions it bars individual lot septic disposal where public sewage is available2526. Where an individual system is eligible, final approval requires an onsite inspection, installer certification or both7. No mapped soil area in Iberville Parish is rated free of severe limitations for a conventional drain field, so make septic feasibility an early purchase contingency27.
Can you live in an RV or tiny home on land in Iberville Parish?
Iberville Parish limits occupancy in regulated RV parks and campgrounds: a total-hookup space may be occupied for no more than 6 months or 180 days in a 12-month period, while a tent or partial-hookup space is limited to 30 days in that period12. A parish-code camp is a temporary shelter used no more than 4 consecutive days per week and is not approved for continuous occupancy13. Those rules do not establish permission to live in an RV on an ordinary private parcel, so confirm the parcel's zoning and proposed occupancy with Permits & Inspections and the Planning Commission1421. A specific tiny-home occupancy rule could not be confirmed. Manufactured homes require building permits, and a manufactured home may not occupy an RV-park lot128.
How do you build a home in Iberville Parish, step by step?
- Confirm the governing jurisdiction and ask the Planning Commission for the parcel's zoning district and site standards321.
- Confirm approved-street access; subdivision layouts must provide workable driveway access, and private roads must accommodate emergency vehicles29.
- Determine whether the site must connect to public sewer or needs state approval for an individual system247.
- Submit building and trade-permit applications online through MGO Connect and pay the applicable fees919.
- If acting as builder of your personal residence, provide the owner-builder affidavit; the licensing exemption does not waive permits or health and safety codes11.
- Request the required foundation and completion inspections5.
- Obtain the required certificate of occupancy before using permitted new construction6.
What should you check before buying land in Iberville Parish?
Put septic feasibility near the top of due diligence because none of Iberville Parish's mapped soils are rated free of severe limits for a conventional drain field27. Determine whether public-sewer connection is mandatory before pricing an onsite system24. Development in a regulated special flood-hazard area requires a floodplain development permit with site, elevation and proposed-structure information30. Iberville Parish averages about 62.7 inches of precipitation annually, so inspect drainage and flood exposure closely31. Confirm that a lot has access from an approved street; a qualifying driveway servitude must also allow service and emergency vehicles to enter and leave2932. Typical parishwide figures are a 0.3% effective property-tax rate and a $581 median annual tax bill, while parcel assessments vary3334.
Watch-outs
- Iberville Parish permit applications are online only, so create the portal account before your planned start date9.
- Setbacks are published, but parcel zoning can add conditions; confirm the district, allowed use and site plan with the Planning Commission421.
- Conventional septic feasibility is a serious parcel risk because none of the parish's soils are rated free of severe drain-field limitations27.
Sources
- Iberville Parish Unified Development Code, quoted and re-checked
- Iberville Parish Hazard Mitigation Plan Update, quoted and re-checked
- Iberville Parish Unified Development Code, quoted and re-checked
- Iberville Parish Unified Development Code, quoted and re-checked
- Iberville Parish Unified Development Code, quoted and re-checked
- Iberville Parish Unified Development Code, quoted and re-checked
- Title 51, Part XIII, Louisiana Public Health—Sanitary Code, quoted and re-checked
- Iberville Parish Unified Development Code (2026 county census)
- Permits & Inspections, quoted and re-checked
- Iberville Parish Hazard Mitigation Plan Update, quoted and re-checked
- Louisiana Revised Statutes 37:2157, quoted and re-checked
- ibervilleparish.com, quoted and re-checked
- Iberville Parish Unified Development Code, quoted and re-checked
- Iberville Parish Permits & Inspections Department (ibervilleparish.com)
- Louisiana Administrative Code, Title 43, Part VI, §701 (Louisiana statewide rule), quoted and re-checked
- Permits & Inspections, quoted and re-checked
- Iberville Parish Hazard Mitigation Plan Update, quoted and re-checked
- Iberville Parish hazard mitigation plan, quoted and re-checked
- Planning Commission, quoted and re-checked
- Iberville Parish Unified Development Code, quoted and re-checked
- Iberville Parish Planning Commission (ibervilleparish.com)
- Iberville Parish Unified Development Code, quoted and re-checked
- Iberville Parish Health Unit (ldh.la.gov)
- Iberville Parish Unified Development Code, quoted and re-checked
- Iberville Parish Unified Development Code, quoted and re-checked
- Iberville Parish Unified Development Code, quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- ibervilleparish.com, quoted and re-checked
- Iberville Parish Unified Development Code, quoted and re-checked
- Iberville Parish Unified Development Code, quoted and re-checked
- Annual precipitation: Bolthole Index county data
- legis.la.gov, quoted and re-checked
- Effective property tax rate: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
Written October 9, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.