Unincorporated Union Parish, Louisiana requires a building permit for new construction through the Union Parish Police Jury1. Unincorporated Union Parish has no parish zoning2. Inside Farmerville, the general manager of public services issues town building permits3. Septic permits for Union Parish addresses remain with the state health officer through the parish health unit4.
At a glance
- Building permit
- Required for new construction in unincorporated Union Parish through the Police Jury1
- Code
- Louisiana State Uniform Construction Code enforced parishwide5
- Inspections
- Required for work covered by a building permit6
- Zoning
- No parish zoning rule in unincorporated Union Parish2
- Septic permit
- State health officer approval; begin with the parish health unit sanitarian47
- RV / tiny home living
- Not restricted by parish zoning outside city limits2
- Owner-builder
- Conditional exemption for a personal residence with an affidavit8
- Permit fees
- $100 parish fee plus $150 inspection-service fee when applicable9
Who to call
Building permits
Union Parish E-911 Administration Office
Issues building permit applications and assigns 911 addresses for new construction in Union Parish, working out of the Union Parish Courthouse
100 E Bayou St., Suite 102, Farmerville, LA 71241
Also useful
Parish governing authority; adopts the Police Jury Code of Ordinances (no zoning chapter) and oversees the Road Department and Public Works
303 E Water St., Farmerville, LA 71241
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in Union Parish means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Union Parish, Louisiana?
Unincorporated Union Parish requires a building permit for new construction and enforces the Louisiana State Uniform Construction Code15. Inside Farmerville, town building permits come from the general manager of public services for construction, extensions and alterations3. Septic permits remain with the state health officer through the parish health unit4. A new-construction plan review must be completed before the permit is issued, and the application must carry both E-911 and sanitation signatures1. The Union Parish Police Jury fee is $100, and Lagniappe Inspection Services collects $150 for applicable permits other than mobile homes9. The Police Jury accepts checks, money orders and credit cards, adds a 4% card charge, and does not accept cash9. A qualifying farm structure such as a barn, shed or poultry house is exempt from construction-code enforcement, but the parish may still require a building permit; residences and structures attached to them do not qualify10. A qualifying owner may supervise work on a personal residence with the required affidavit while licensed subcontractors must remain licensed8; the exemption generally limits the owner to 1 residence per year, with a qualifying marital-status or employment-relocation exception, and concerns contractor licensing rather than building permits11.
Who issues building permits and inspections in Union Parish?
For unincorporated Union Parish building permits, begin with the Union Parish E-911 Administration Office at 100 E Bayou St., Suite 102 in Farmerville or call 318-368-091112. The office handles building-permit applications on weekdays from 8:00 AM to 4:00 PM, including lunch, and asks for the road name and approximate distance to the nearest 911 neighbor13. After E-911 and sanitation sign the application, take it, any required flood-elevation documents and the new-construction plan review to the Union Parish Police Jury, which issues the building permit once the qualifications are met1. Permit-covered work requires inspections, and the applicant must contact the building inspector; a third-party inspector must send inspection records to the Police Jury and Building Official6.
Does Union Parish have zoning?
Unincorporated Union Parish has no parish zoning rule setting zoning districts, minimum dwelling size, ordinary minimum lot size, setbacks, lot coverage or building height, or restricting accessory dwellings, RVs, tiny homes, manufactured homes or temporary camping2. Certain qualifying single-family subdivisions outside incorporated areas remain subject to a state rule requiring 22,500 square feet of lot area and 125 feet of frontage, along with suitable sewage disposal and water systems14. A division into 5 or more lots, any under 3 acres, falls within the parish subdivision definition, subject to its exclusions, and needs Police Jury plat approval before lot sales15.
How do septic permits work in Union Parish?
Louisiana's state health officer issues individual sewerage-system permits, while the local parish health unit must be notified before installation and its sanitarian handles final approval4. State approval is required before a system is installed, altered or operated, and the approved plans and specifications control the installation7. Final approval follows installation verification and receipt of the licensed installer's certification7. For a lot in a formal subdivision, the Office of Public Health must approve the recorded plat or property survey before issuing the permit7. In Union Parish subdivisions governed by the parish ordinance, sewage-disposal facilities must be approved by and built under the supervision of the parish health unit when no sanitary sewer is accessible; the plat must state that requirement16. Only about 1.4% of Union Parish soils are rated without severe limits for a conventional drain field, so make septic feasibility an early purchase contingency17.
Can you live in an RV or tiny home in Union Parish?
Unincorporated Union Parish does not restrict RV or tiny-home occupancy through parish zoning2. A tiny home that qualifies as new construction still enters the parish building-permit and inspection process, and a mobile-home application begins with the E-911 office112. Any individual sewerage system in Union Parish still needs state approval18. Off-grid wastewater options are limited: an individual system is allowed when community sewer is unavailable or infeasible, and alternative systems remain subject to state approval19. For construction inside Farmerville, ask the general manager of public services about the town building permit3.
Building a home in unincorporated Union Parish: the steps, in order
- Contact the E-911 Administration Office with the road name and approximate distance to the nearest 911 neighbor, then obtain the address and building-permit application13.
- Contact the parish health unit for the sewerage-system permit and sanitation signature before installation74.
- Complete the required new-construction plan review1.
- If the site is in a flood zone, obtain a Base Flood Elevation Certificate and document that a licensed surveyor will provide the final Elevation Certificate20.
- Take the signed application, plans and any flood documents to the Union Parish Police Jury and pay the applicable parish and inspection-service fees19.
- Contact the building inspector for required inspections and make sure any third-party records reach the Police Jury and Building Official6.
- For a state-highway driveway, obtain a signed and numbered LaDOTD Access Connection Permit before construction21.
What should you check before buying land in Union Parish?
Check flood status before committing: a flood-zone building site needs a Base Flood Elevation Certificate and a commitment for a licensed surveyor's final Elevation Certificate before the building permit can issue20. Test septic feasibility early because only about 1.4% of Union Parish soils are rated without severe limits for a conventional drain field17. In a subdivision, accessible public sewer and public water must be extended to each lot; where sewer is inaccessible, the parish health unit must approve and supervise sewage-disposal facilities, and the plat must carry that requirement2216. Confirm legal road access and determine whether a driveway connects to a state highway, where a LaDOTD permit is required before construction21. A new water well must be drilled by a licensed contractor and registered within 30 days; domestic wells follow post-installation notification rules23.
Watch-outs
- The E-911 office starts the application, but the Union Parish Police Jury issues the building permit after required signatures, plans and flood documents are assembled121.
- Flood-zone sites need a Base Flood Elevation Certificate and documentation for a licensed surveyor's final Elevation Certificate before permit issuance20.
- Only about 1.4% of Union Parish soils are rated without severe limits for a conventional septic drain field, so confirm system feasibility before buying17.
- We could not confirm Union Parish's certificate-of-occupancy practice; ask the Police Jury before planning move-in or utility timing24.
Sources
- Steps for receiving a Building Permit in Union Parish, quoted and re-checked
- Louisiana law on county zoning and building authority
- Town of Farmerville: Sec. 5-3. Building permits required; fees (Union Parish), quoted and re-checked
- Louisiana Administrative Code Title 51, Part XIII, Sewage Disposal, quoted and re-checked
- State of Louisiana Uniform Construction Code Law and Rules and Regulations, quoted and re-checked
- Steps for receiving a Building Permit in Union Parish, quoted and re-checked
- Louisiana Administrative Code Title 51, Part XIII, Sewage Disposal, quoted and re-checked
- Louisiana Revised Statutes § 37:2157 — Exemptions (Louisiana statewide rule), quoted and re-checked
- Steps for receiving a Building Permit in Union Parish, quoted and re-checked
- legis.la.gov, quoted and re-checked
- RS 37:2157. Exemptions, quoted and re-checked
- Union Parish E-911 Administration Office (uppj.org)
- E-911 Information — Union Parish Police Jury, quoted and re-checked
- RS 33:106.1 — Planning commissions; exempt subdivisions; septic tanks and field drains permitted (Louisiana statewide rule), quoted and re-checked
- Union Parish Police Jury Regular Meeting Minutes, February 4, 2025 — Ordinance No. UPPJ975, quoted and re-checked
- Union Parish Ordinance No. UPPJ975, quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Louisiana Administrative Code Title 51, Part XIII, Public Health—Sanitary Code (Louisiana statewide rule), quoted and re-checked
- Louisiana Administrative Code Title 51, Part XIII, Public Health—Sanitary Code (Louisiana statewide rule), quoted and re-checked
- Steps for receiving a Building Permit in Union Parish, quoted and re-checked
- LaDOTD Access Connections Policy (Louisiana statewide rule), quoted and re-checked
- Union Parish Police Jury Ordinance No. UPPJ975, as amended February 4, 2025, quoted and re-checked
- Louisiana Administrative Code, Title 43, Part VI, §701 (Louisiana statewide rule), quoted and re-checked
- Union Parish Police Jury (uppj.org)
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.