Zoning, building permits and septic rules in Town of Brentwood, Maryland

Town of Brentwood is a town in Prince George's County, Maryland. 4 rules below are quoted from official sources and independently re-checked, most recently on October 23, 2026. Rules for unincorporated land are on the Prince George's County page.

Answers from the rulebook for Town of Brentwood

Town of Brentwood’s own rules

  • Building permitRequired

    Building, remodeling or repair of any building or structure inside Brentwood town limits, applied for at the town clerk

    • Projects with an estimated cost of $200 or less need no permit (§ 50-3c).
    • Minor repairs or alterations by competent craftsmen costing less than $150 for materials and labor may be made without a permit, if wiring costs no more than $20 for labor and materials and involves no more than three electrical outlets (§ 50-5).
    • Construction may proceed after the permit is issued.

    estimated project cost above which a town permit is required: > 200 USD (Minor-repair exemption under § 50-5 (under $150 labor and materials, with wiring limits))

    “no permit will be required for a building project with an estimated cost of $200 or less.”
  • Building code adoptedAdopted

    New construction, alteration and repair of buildings inside Brentwood town limits, under the building regulations adopted by the town from Prince George's County

    • The town adopts the Prince George's County building regulations in force; the code defines the building code as the basic building code, latest edition, and current cumulative supplement officially adopted by Prince George's County and the town.
    • Permit and inspection rules in Chapter 50 apply in addition to the adopted code.
    “the building regulations in force and effect in prince george's county are hereby adopted to be the building regulations for the town of brentwood.”
  • Permit feesVariable (with conditions)

    Town building permits inside Brentwood town limits for projects over $200

    • Fee is set by the mayor and council, not in the code; no published fee schedule was found in the opened code text.
    • Fee is based on estimated project cost (§ 50-3a).
    “the permit fee for a building project over $200 shall be established by the mayor and council.”
  • Permit processPartial

    Building permit application process inside Brentwood town limits

    • Town application goes to the town clerk; the clerk refers it to the mayor and council or issues it if authorized (§ 50-1).
    • A county permit must be obtained first and shown to the town (§ 50-4).
    “shall make application for a permit to the town clerk and pay the fee hereinafter prescribed.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Town of Brentwood or Prince George's County directly.

  • Owner-builder exemption — Owner-builder permitting inside Brentwood town limits
  • Local zoning — Land inside Brentwood town limits: whether the town adopts its own zoning ordinance
  • Zoning districts — Zoning districts inside Brentwood town limits
  • Minimum dwelling size — Minimum dwelling size inside Brentwood town limits
  • Minimum lot size — Minimum lot size for single-family homes in Brentwood town limits
19 more unanswered
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Town of Brentwood publishes no rule on the point, not that none exists. Prince George's County’s page lists the county offices to call.

Off-grid gear

Going off-grid in Town of Brentwood means bringing your own water and power. The kit we’d start with: