Prince George's County, Maryland requires building permits for most construction, alteration, demolition and changes of occupancy, issued by the Department of Permitting, Inspections and Enforcement (DPIE)1. County zoning applies except in the City of Laurel, which has its own zoning authority23. Where public sewer is unavailable, the County Health Department issues the septic permit and inspects the completed system before it is covered456.
At a glance
- Building permit
- Required for nearly all construction, alteration, demolition or occupancy change; issued by DPIE71
- Zoning
- Yes; the county administers zoning except in the City of Laurel, which has its own zoning authority823
- Septic permit
- Required through the county Health Department where an individual sewage system serves property without public sewer95
- Owner-builder exemption
- Available via a Homeowner Waiver, but the owner must agree not to sell or rent the property for at least 5 years1011
- RV or temporary camping
- Private-lot RV living is unconfirmed; habitation in an RV on a public right-of-way is prohibited12
- Manufactured home
- Allowed only where zoning permits it, generally through special-exception standards13
- Accessory dwelling
- Conversion may add no more than 2 units and requires a use-and-occupancy permit where zoning allows it14
- Private well
- The well driller must apply for a county well permit15
Who to call
Building permits
Prince George's County Department of Permitting, Inspections and Enforcement (DPIE)
Issues building, structural, electrical, mechanical, plumbing and driveway permits and performs required inspections for construction in Prince George's County
9400 Peppercorn Place, Largo, MD 20774
Codes & inspections
Prince George's County Code Compliance, Zoning Compliance / Enforcement Division
Enforces the County Zoning Ordinance on private property countywide, except the City of Laurel
9400 Peppercorn Place, Suite 600, Largo, MD 20774
Planning & zoning
Maryland-National Capital Park and Planning Commission, Prince George's County Planning Department
Approves zoning, use, subdivision, site plans, tree conservation plans, landscape plans and subdivision plats before DPIE can issue a building or site permit [[county:subdivision-mncppc-approval]]
1616 McCormick Drive, First Floor, Largo, MD 20774
Septic permits
Prince George's County Health Department, Environmental Engineering Program
Reviews and permits percolation tests and new/replacement septic (sewage disposal) systems and inspects them before they're covered, for any Prince George's County property not on public water or sewer
9201 Basil Court, Suite 318, Largo, Maryland 20774-5310
Well permits
Prince George's County Health Department, Environmental Engineering Program (Well Permits)
Reviews well-installation applications, requires a licensed well driller to apply, and issues the well permit needed before a building permit is approved when the property uses a private well
9201 Basil Court, Suite 318, Largo, Maryland 20774-5310
Contact details are copied from each office’s official page and were checked against it on October 10, 2026.
Off-grid gear
Going off-grid in Prince George's County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Prince George's County, Maryland?
Yes. Prince George's County requires the owner or authorized agent to obtain the necessary permit before construction, enlargement, alteration, repair, movement, demolition, an occupancy change, or regulated electrical, gas, mechanical or plumbing work begins1. Limited exemptions include painting, exterior siding, roof-shingle replacement without structural repair, exact window or door replacement without structural alteration, and certain small projects identified by the county1. Prince George's County adopted a current list of building codes and standards effective March 1, 2026, with additional codes potentially applying to the scope of work16. A project that needs a commercial building, site-road development or homeowner permit also needs an inspection17.
Who issues building permits in Prince George's County, and how do you reach them?
The Prince George's County Department of Permitting, Inspections and Enforcement (DPIE) is the building-permit office; call 301-636-2000 or visit 9400 Peppercorn Place, Largo, MD 2077418. Building Plan Review is available at 301-636-2070, Inspections at 301-636-2080, and Enforcement at 301-883-616818. The Prince George's County Planning Department handles zoning, use, subdivision and site-plan approvals that must precede a building or site permit; call 240-545-89761920. For zoning enforcement on existing private property, call the Zoning Compliance / Enforcement Division at 301-636-209021. A business outside the City of Laurel also needs a Use and Occupancy Certificate before operations begin, and that certificate does not itself authorize construction22.
Does Prince George's County have zoning?
Yes. Prince George's County has a zoning ordinance, while the City of Laurel has its own zoning authority23. The Planning Department reviews zoning, use, subdivision, site plans and plats before DPIE issues building or site permits, while the Zoning Compliance / Enforcement Division handles compliance on developed property1921. Parcel zoning matters for unconventional housing: manufactured homes are prohibited in many zones and generally require special-exception review where allowed13. We could not confirm a countywide minimum dwelling size; ask the Planning Department about the parcel's exact district20. In an RR conservation subdivision, the minimum net lot area is 10,000 square feet, at least 50% of the gross tract must remain conservation area, and the basic main-building yards are 20 feet in front, 5 feet at the side and 20 feet at the rear2324. RR conservation-subdivision lots from 10,000 through 19,999 square feet may cover no more than 30% of net lot area; larger lots are generally capped at 25%25. Road edges and adjoining agricultural conservation land can trigger much deeper yards, so verify the recorded plat before siting a house24.
How do septic permits work in Prince George's County?
The Prince George's County Health Department or DPIE Health approves and administers on-site sewage disposal systems4. When public sewer is unavailable, a new residence or commercial building must start with a percolation-test application; satisfactory results are followed by a sewage-disposal-permit application, and the building permit waits for the septic permit and any applicable well permit5. Some soils can be tested only during the wet season from February 1 through April 30, with dates subject to rainfall26. The completed sewage disposal system must be inspected before it is covered, and a satisfactory inspection produces a Certificate of Compliance6. The county also issues permits for replacement of failing septic systems and conventional systems for new construction27. County-permitted individual sewage disposal is the documented off-grid sanitation option where public sewer is unavailable28. Only about 1.9% of county soils lack severe limits for a conventional drain field, so make the site evaluation a purchase contingency29.
The service path depends on the parcel: projects inside the water and sewer envelope need Category 3 to advance toward public service and WSSC permits for new lines; projects outside need Category 6 plus DPIE well and septic permits30.
Can you live in an RV or tiny home on your land in Prince George's County?
We could not confirm that Prince George's County allows long-term RV living or a tiny home as a distinct use on an individual private lot; ask the Planning Department about the parcel and proposed dwelling classification20. Habitation in an RV, camper, mobile home or trailer on public property or a public right-of-way is prohibited unless the location is a designated public campground, recreational park or licensed mobile-home park12. That public-space rule does not answer whether an RV may be occupied on a private lot. Temporary trailer camping is separately addressed in county-regulated recreational campgrounds: the campground needs special-exception approval, at least 5 acres and designated campsites, and a trailer may be occupied for no more than 3 months in any 12-month period31. A manufactured home used as a detached house is allowed only where the zoning table permits it and must meet siting, anchoring and appearance standards13.
Building a home in Prince George's County: the steps, in order
- Ask the Planning Department to confirm zoning, proposed use and whether subdivision or a recorded plat must be approved before construction3220.
- Determine the parcel's water and sewer category: public service inside the envelope follows the Category 3 and WSSC path, while well and septic outside it require Category 6 and DPIE permits30.
- If public sewer is unavailable, complete percolation testing and obtain the county sewage-disposal permit5.
- If public water is unavailable, have the well driller apply for the well permit; the county also performs construction checks and requires satisfactory water samples before issuing a Certificate of Potability33.
- Apply to DPIE for the building permit and budget for applicable building, grading, planning and technology fees3418.
- An owner acting as contractor must obtain the Homeowner Waiver and accept its deed, work and occupancy conditions11.
- Schedule building inspections and have the completed septic system inspected before it is covered176.
What to check before you buy land in Prince George's County
Confirm the water and sewer category before buying: projects inside the service envelope need Category 3 to advance toward public water and sewer, while projects outside need Category 6 and county well and septic permits3035. Make septic feasibility a purchase contingency because only about 1.9% of county soils lack severe limits for a conventional drain field29. Confirm that the parcel is a recorded buildable lot; a landowner or developer generally needs an approved subdivision plan and compliant record plat before construction32. Check floodplain status and whether construction affects wetlands or waterways, because floodplain development and some wetland work require additional permits3637. A new or modified driveway within a state right-of-way needs an MDOT State Highway Administration permit38. A farm building on farm property used only for agriculture may be exempt from the building permit, but electrical and mechanical trade permits and other land approvals can still apply39.
Watch-outs
- Long-term RV occupancy, tiny homes as a distinct use and minimum dwelling size remain unconfirmed; ask the Planning Department before relying on a parcel for any of them20.
- A campground rule does not establish permission to camp temporarily on an ordinary private lot; ask Zoning Compliance about a non-campground parcel3121.
- The City of Laurel has its own zoning authority; if your parcel is in or near Laurel, confirm which zoning rules apply before relying on the county standards in this guide3.
- The septic-soils figure (1.9%) is a countywide average; get a site-specific percolation test from the Health Department rather than assuming every lot needs the same system design29.
Sources
- Inspection FAQs, quoted and re-checked
- Guide to Zoning Categories, quoted and re-checked
- Planning, Zoning, and Development Review in Prince George’s County, quoted and re-checked
- Information about the Permit Process, quoted and re-checked
- Health Approval of Building Permit — Individual Water-Sewer, quoted and re-checked
- Health Approval of Building Permit — Individual Water-Sewer, quoted and re-checked
- Inspection FAQs (2026 county census)
- Guide to Zoning Categories (2026 county census)
- Information about the Permit Process (2026 county census)
- Building Contractor License (2026 county census)
- Building Contractor License, quoted and re-checked
- Sec. 26-127.06. Habitation in vehicles parked in public right-of-way, quoted and re-checked
- Prince George’s County Zoning Ordinance, Subdivision Regulations, & Landscape Manual, quoted and re-checked
- Prince George’s County Zoning Ordinance, Subdivision Regulations, & Landscape Manual, quoted and re-checked
- Health Approval of Building Permit — Individual Water-Sewer, quoted and re-checked
- Building Codes & Bulletins | Prince George's County, quoted and re-checked
- When Is a Permit Required?, quoted and re-checked
- Prince George's County Department of Permitting, Inspections and Enforcement (DPIE) (princegeorgescountymd.gov)
- princegeorgescountymd.gov, quoted and re-checked
- Maryland-National Capital Park and Planning Commission, Prince George's County Planning Department (pgplanning.org)
- Prince George's County Code Compliance, Zoning Compliance / Enforcement Division (princegeorgescountymd.gov)
- Use & Occupancy Inspections, quoted and re-checked
- Prince George's County, MD Zoning Ordinance, Subdivision Regulations, & Landscape Manual (Effective 4/1/2022), quoted and re-checked
- Prince George's County, MD Zoning Ordinance, Subdivision Regulations, & Landscape Manual (Effective 4/1/2022), quoted and re-checked
- Prince George's County, MD Zoning Ordinance, Subdivision Regulations, & Landscape Manual (Effective 4/1/2022), quoted and re-checked
- Prince George's County Health Department, Environmental Engineering Program (web.archive.org)
- Wells and Septic Systems on Private Property, quoted and re-checked
- Health Approval of Building Permit — Individual Water-Sewer, quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Water and Sewer Planning, quoted and re-checked
- Prince George’s County Zoning Ordinance, Subdivision Regulations, & Landscape Manual, quoted and re-checked
- princegeorgescountymd.gov, quoted and re-checked
- Health Approval of Building Permit — Individual Water-Sewer, quoted and re-checked
- DPIE Fee Schedule, quoted and re-checked
- Water and Sewer Planning, quoted and re-checked
- Floodplain Permitting in Maryland (Maryland statewide rule), quoted and re-checked
- Nontidal Wetland and Waterway Permits, Approvals and Certifications (Maryland statewide rule), quoted and re-checked
- Access Management/Permits - MDOT SHA (Maryland statewide rule), quoted and re-checked
- When Is a Permit Required?, quoted and re-checked
Written October 10, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.