In Washington County, Maine, the Land Use Planning Commission (LUPC) issues building permits and sets zoning for the unorganized and deorganized territory, and a new house, camp or residential expansion there generally needs an LUPC building permit12. Inside incorporated towns, the town runs its own building permits and zoning, and the statewide building code applies even where a small town does not enforce it34. Septic permits are separate everywhere in the county: they come from a Local Plumbing Inspector, not from LUPC or the town's building office5.
At a glance
- Building permit
- Generally required for a new house, camp or residential expansion in LUPC territory; ask the municipality elsewhere13
- Building code
- MUBEC compliance is statewide; local enforcement depends on municipal population and choice4
- Zoning
- LUPC zones the unorganized/deorganized territory; organized municipalities administer their own land-use rules63
- Septic
- Septic permit from a Local Plumbing Inspector in towns and LUPC territory alike; statewide rules apply57
- RV camping in LUPC territory
- Personal-use campsite stays are capped and require checking the parcel's subdistrict and flood status8
- Tiny homes in municipalities
- Allowed where single-family homes are allowed, subject to the same applicable land-use rules9
- Accessory dwellings
- Municipal law generally allows an ADU where residential uses are permitted; LUPC territory follows separate rules10
Who to call
Planning & zoning
Maine Land Use Planning Commission (LUPC), Augusta Office
Zoning and building/development permits for Washington County's unorganized and deorganized territory (34 townships and 3 plantations); also has field offices covering the region
22 State House Station, Augusta, ME 04333
Also useful
Washington County Commissioners' / County Manager's Office
General county administration; the county government itself does not issue organized-town building or zoning permits, and LUPC (not the county) issues permits in the unorganized territory
85 Court Street, Machias, ME 04654
Also useful
Washington County Registry of Deeds
Records deeds, mortgages, liens and land records for property throughout Washington County, dating back to 1784
85 Court Street, Machias, Maine
Roads & driveways
Office of Washington County Unorganized Territories
Local roads, bridges, burn permits, E-911 addressing, animal control, solid waste and other municipal-style services in the county's unorganized townships; it does not issue building or zoning permits, which come from LUPC
83 Court St, Machias, ME (P.O. Box 297, Machias, ME 04654)
Contact details are copied from each office’s official page and were checked against it on October 9, 2026.
Off-grid gear
Going off-grid in Washington County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Washington County, Maine?
In Washington County's LUPC service area, a new house, camp or expansion of an existing residential structure generally requires an LUPC building permit1. A qualifying accessory structure may avoid a permit, but the owner must notify LUPC and verify that the project meets its standards11. Construction cannot begin until LUPC issues the permit1. Incorporated municipalities handle their own permit administration, so ask the town code office what application and inspections apply3. MUBEC applies statewide; larger municipalities must enforce it, while smaller municipalities may choose whether to enforce it locally4. In municipalities above 2,000 inhabitants, a building subject to required inspections may not be occupied until the building official issues a certificate of occupancy12.
Who issues building permits, zoning approval and septic permits in Washington County, Maine?
For building permits and zoning approval on land in the unorganized or deorganized territory, contact the Maine Land Use Planning Commission's Augusta office at (207) 287-263113. The required LUPC form depends on the development, and floodplain work needs the floodplain supplement with the underlying permit application14. For building permits and zoning approval in an incorporated municipality, start with that town or city's code office because local administration varies3. Septic permits stay separate: they are issued by a Local Plumbing Inspector, appointed by the town in organized municipalities and assigned for the unorganized territories, whichever side of the line the parcel is on515. The Washington County Commissioners' / County Manager's Office handles general county administration at 207-255-3127, but it is not a substitute for LUPC or a municipal code office16. The Registry of Deeds holds land records at 85 Court Street in Machias and can be reached at 207-255-651217. The Office of Washington County Unorganized Territories handles local roads and other municipal-style services at (207) 255-891918.
Does Washington County have zoning?
Washington County does not have one zoning answer for every parcel. LUPC is the planning and zoning authority for the unorganized and deorganized territory, including 34 townships and 3 plantations covering approximately half the county6. LUPC zoning subdistricts and the current land-use guidance map control there; confirm the official map with LUPC because published tabloid and digital maps are not definitive19. Organized municipalities administer their own land-use ordinances, and their zoning status varies3. In LUPC territory, a typical residential minimum lot is 40,000 square feet with on-site wastewater or 20,000 square feet with off-site common or community sewer, subject to the parcel's subdistrict and exceptions20. Municipal ADUs generally must be allowed where residential uses are permitted and must be at least 190 square feet, but those standards do not extend to LUPC territory21.
How do septic permits work in Washington County?
A new, expanded or replacement septic system anywhere in Washington County, including LUPC territory and organized towns, requires a septic permit from the Local Plumbing Inspector before work begins, except for normal maintenance and repair5. The application generally requires a licensed site evaluator, or a professional engineer or licensed site evaluator for an engineered system, and work must start within 24 months after permit issuance5. Installation requires a site-preparation inspection before work and another inspection before final backfilling; give the inspector at least 24 hours' notice when the system is ready7. Off-grid does not mean permit-free: permanent alternative toilets require permits, and primitive or limited graywater systems remain subject to system and setback rules22. Only about 1% of Washington County soils are free of severe limits for a conventional drain field, so obtain the site evaluation before committing to a building location23.
Can you live in an RV or tiny home on your land in Washington County?
In incorporated municipalities, a tiny home must be permitted on an individual house lot where single-family homes are allowed, subject to the applicable rules for a single-family home or accessory structure9. We could not confirm a distinct tiny-home occupancy rule for LUPC territory, so ask LUPC about the parcel's subdistrict and permit path. For a personal-use campsite in LUPC territory, tents, trailers and RVs may be present for no more than 120 days per calendar year; the stated limit in a P-FP flood area is 90 consecutive days8. Separate LUPC flood-prone-area standards allow an RV for no more than 150 consecutive days if it remains licensed and highway-ready, unless it meets the applicable manufactured-home elevation and anchoring route24. Those provisions do not establish a general right to live full-time in an RV. Manufactured homes in LUPC flood-prone areas face elevation, permanent-foundation and anchoring requirements25.
Building a home in Washington County: the steps, in order
- Confirm whether the parcel is in an organized municipality or LUPC territory because zoning and permit administration differ3.
- Check the deed and parcel history with the Washington County Registry of Deeds17.
- In LUPC territory, confirm the official zoning subdistrict and choose the application matching the project1914.
- Obtain any required state-highway or local-road driveway permit and include it with the LUPC application26.
- Do not begin regulated residential construction until LUPC issues the permit1.
- In an organized municipality, ask the code office which permits and inspections it administers; MUBEC compliance remains mandatory4.
- Arrange the septic evaluation, permit and installation inspections through the Local Plumbing Inspector57.
- Complete LUPC self-certification; if the permit requires a Certificate of Compliance, obtain it before occupancy2728.
What to check before you buy land in Washington County
Soils: only 1% of Washington County soils are free of severe limits for a conventional septic drain field, so obtain a site evaluation before fixing the home site23. Jurisdiction: verify whether the parcel is in an organized municipality or LUPC territory before assuming any permit or zoning rule3. Dimensions: in LUPC territory, the applicable subdistrict can change lot size, coverage, height and allowed uses; the baseline building coverage is 30%, but exceptions apply29. Access: a driveway onto a state or state-aid highway may need MaineDOT approval, while a local-road permit may come from the county, town or plantation26. Flood: mapped flood-hazard work uses the LUPC floodplain supplement with the underlying application14. Taxes: the effective property tax rate is about 1.1%, with a median annual bill around $1,6543031.
Watch-outs
- Do not treat a small town's choice not to enforce MUBEC as an exemption from the statewide code; ask the municipal code office how compliance is documented4.
- An owner-occupant may perform electrical installation in a newly built single-family home only after obtaining the required certificate and arranging inspection before wiring is enclosed; this does not waive building or land-use permits32.
Sources
- Your Building Permit Application, quoted and re-checked
- Washington County Region - Community Guided Planning and Zoning, quoted and re-checked
- About LUPC - Department of Agriculture, Conservation and Forestry, quoted and re-checked
- Division of Building Codes and Standards, quoted and re-checked
- Subsurface Wastewater System Permitting, quoted and re-checked
- About LUPC, quoted and re-checked
- Subsurface Wastewater System Permitting, quoted and re-checked
- Land Use Districts and Standards, Chapter 10, quoted and re-checked
- Title 30-A, §4363: Regulation of tiny homes, quoted and re-checked
- Title 30-A, §4364-B: Accessory dwelling units, quoted and re-checked
- Land Use Planning Commission Announces Rule Changes, quoted and re-checked
- Title 25, §2357-A: No occupancy without certificate; appeal, quoted and re-checked
- Maine Land Use Planning Commission (LUPC), Augusta Office (maine.gov)
- LUPC Application Forms, quoted and re-checked
- Subsurface Wastewater Unit, quoted and re-checked
- Washington County Commissioners' / County Manager's Office (washingtoncountymaine.com)
- Washington County Registry of Deeds (washingtoncountymaine.com)
- Office of Washington County Unorganized Territories (wcut.maine.gov)
- Washington County Region - Community Guided Planning and Zoning, quoted and re-checked
- Guide to the Building Permit Application: Dimensional requirements, quoted and re-checked
- Title 30-A, §4364-B: Accessory dwelling units, quoted and re-checked
- Subsurface Wastewater Disposal Rules, 10-144 CMR Ch. 241, quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Land Use Districts and Standards, Chapter 10, quoted and re-checked
- www1.maine.gov, quoted and re-checked
- Maine Land Use Planning Commission Building Permit Application (Maine statewide rule), quoted and re-checked
- LUPC Self-Certification Form, quoted and re-checked
- Buying and Selling Property, quoted and re-checked
- Washington County Region - Community Guided Planning and Zoning, quoted and re-checked
- Effective property tax rate: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
- Title 32, §1102-D: Single-family dwelling exception; certificate required, quoted and re-checked