Luce County, Michigan

Building permits, zoning and land rules in Luce County, Michigan

84Index Score / 100
#9 of 83 in Michigan

Luce County, Michigan requires a state building permit, with new applications going to the State of Michigan for plan review12. Luce County administers zoning in unincorporated areas outside the Village of Newberry, while LMAS District Health Department issues septic permits and most private-well permits throughout the county345.

At a glance

Building permit
Required; new applications go to the State of Michigan for plan review, and state fees are published26
Zoning
County zoning applies to unincorporated land; the Village of Newberry is excluded7
Septic
Permitted by the LMAS District Health Department, Newberry office4
Owner-builder exemption
Yes, statewide: an owner building for their own use and occupancy on their own property can act without a residential-builder license8
Minimum dwelling size
District-specific: 720 sq ft and 14 ft wide in most residential districts, 576 sq ft for off-grid seasonal cabins, 720 sq ft and 24 ft wide on-grid in lake/stream districts9
Minimum lot size
District-specific, from 20,000 sq ft in R-1/A-R up to 10 acres in the R-F seasonal and S-1 districts10
RV living
Temporary RV occupancy generally requires an occasional-use permit and is limited to one RV per parcel for 180 days per year; construction occupancy has separate conditions1112
Private well
LMAS permit generally required for construction or extensive changes, with exceptions for minor repairs and certain state-regulated wells5

Who to call

Building permits

Luce County Building Department (911 addressing)

911 addressing, a required step before applying for a Michigan state building permit for property in Luce County; printed permit applications are also available at the county courthouse

906-291-1239

Online permits →

Building permits

State of Michigan Upper Peninsula Building Inspector

Construction inspections for building permits issued in Luce County once the State of Michigan has approved the plan

906-235-2592

grochowskid@michigan.gov

Zoning

Luce County Zoning Administrator

Zoning administration and the Rural Zoning Ordinance for unincorporated Luce County

zoning@lucecountymi.gov

407 West Harrie Street, Newberry, MI 49868

Septic permits

LMAS District Health Department, Newberry Office

On-site sewage (septic) construction permits and site evaluations for Luce County

906-293-5107

14150 Hamilton Lake Rd, Newberry, MI 49868

Contact details are copied from each office’s official page and were checked against it on October 12, 2026.

Off-grid gear

Going off-grid in Luce County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Luce County, Michigan?

Yes: Luce County requires a building permit for new construction, while ordinary repairs are exempt unless they involve structural, egress, utility or safety work13. Before applying, get 911 addressing from the county and check the Rural Zoning Ordinance for the parcel14. New applications go to the State of Michigan for plan review; applicants create an online account and can pay online, while mailing the application adds processing time2. State fees depend on project cost: the published schedule starts at $75 for work costing up to $1,000, including one inspection, and lists a $50 certificate-of-occupancy fee for permits other than demolition6.

Who issues building permits in Luce County, and how do you reach them?

Start with Luce County for 911 addressing at 906-291-1239, then send the building-permit application to the State of Michigan for plan review142. Existing approved building permits are inspected by the State UP building inspector at 906-235-2592 or grochowskid@michigan.gov1516. County responsibilities remain separate: the Luce County Zoning Administrator handles zoning approval for unincorporated land at 407 West Harrie Street, Newberry, MI 49868, or zoning@lucecountymi.gov173. LMAS in Newberry handles septic permits and most private-well permits countywide at 906-293-51074518.

Does Luce County have zoning?

Yes: Luce County's Rural Zoning Ordinance covers unincorporated areas through Residential, Agricultural-Residential, Recreational-Forest, Commercial, Industrial, Lakes, Streams and Rural-Residential districts, among others19. The Village of Newberry is excluded, so ask the village about land inside its boundary7. Minimum lot area ranges from 20,000 square feet in the R-1 and A-R districts to 10 acres for an R-F seasonal dwelling and an S-1 dwelling10. In R-1, A-R, R-F, C-1 and I-1, the schedule calls for a 50-foot front setback, 10-foot side yards and a 25-foot rear yard20. A second dwelling needs Special Approval and enough land to satisfy the minimum lot area for each dwelling21. Mobile-home parks are conditional uses in RR-1 and need special approval; the cited provision does not answer whether a single manufactured home is allowed on an individual parcel, so ask the Zoning Administrator2217.

How do septic permits work in Luce County?

LMAS District Health Department issues septic construction permits for new, modified and replacement systems in Luce County after a site evaluation423. An existing system also needs LMAS review when a new or increased use is proposed; approval depends on permit records, pumping and tank evaluation, the size of the increase, soil information and absence of failure24. Pressurized water cannot serve a building without an approved septic connection or available sewer; the limited alternative is an approved hand pump verified at final inspection25. Luce County privies are intended for remote sites without public utilities or plumbing and must comply with township zoning and Michigan construction rules26. A privy requires unavailable sewer, cannot replace septic for a structure generating water-carried sewage, and is prohibited in a 100-year floodplain27. Pump-and-haul is generally prohibited except for limited situations such as temporary construction, seasonal installation delay or a failed existing system with no on-site alternative28. Only about 0.5% of county land is rated without severe limits for a conventional drain field, so arrange the LMAS evaluation before buying2918.

Can you live in an RV or tiny home on your land in Luce County?

In residential-type districts of unincorporated Luce County, temporary RV occupancy requires a Recreational Vehicle Occasional Use Permit for each occupancy period and is generally limited to one RV per parcel for 180 total days per calendar year11. The listed permit fee is $15, subject to county adjustment, and the permit must be posted visibly near the right-of-way30. Luce County restricts tents and similar portable facilities too, but allows seasonal dwelling use without the general limits in R-F, L-4 and Stream districts where franchised electrical-grid power is unavailable11. During actual dwelling construction on qualifying land, an owner may occupy one trailer coach for 12 consecutive months from issuance of a certificate of compliance, with approved water and sewage facilities installed before occupancy; up to 3 additional 12-month extensions require proven extenuating circumstances12. A tiny home must meet Luce County dwelling standards: at least 576 or 720 square feet of first-floor space and a width of 14 or 24 feet, depending on district and grid availability31. RV rental units are prohibited30.

Building a home in Luce County: the steps, in order

  1. Confirm the zoning district, lot area, dwelling dimensions, setbacks and zoning-approval fee with the Luce County Zoning Administrator10932.
  2. If the project creates a subdivision, account for Michigan's plat-review process before laying out lots33.
  3. Arrange the LMAS septic site evaluation and septic permit, plus a private-well permit when required, before fixing the house location235.
  4. Place the driveway at least 10 feet from a lot line unless the neighbor gives written permission, and obtain an MDOT driveway permit for work in a state-highway right-of-way34.
  5. Get 911 addressing from Luce County at 906-291-123914.
  6. Submit plans and the building-permit application to the state for review; mailing is available but slower2.
  7. Pay the state building-permit fee and follow the inspection instructions635. An owner-builder exemption may remove the builder-license requirement, but not building permits, zoning approval or code compliance36.

What to check before you buy land in Luce County

Confirm the zoning district because Luce County lot minimums range from 20,000 square feet to 10 acres in the cited residential schedules10. Check the house, septic, well and driveway locations together because setbacks and the 10-foot driveway-to-lot-line rule can narrow the usable area2034. LMAS requires a private-well construction permit for new wells and extensive changes, with exceptions for minor repairs and certain state-regulated wells5. Luce County wells must be built by a registered Michigan well driller or the owner at the primary residence; the residential water-supply application lists a $315 fee and requires abandonment of the old well for replacement work37. Only about 0.5% of county land is rated without severe limits for a conventional drain field, so obtain an LMAS site evaluation before treating a listing as buildable2918. Confirm whether the parcel is inside the Village of Newberry, where county zoning does not apply7. The median property-tax bill is about $1,121 a year at an effective rate near 1%3839.

Watch-outs

  • New Luce County building-permit applications go to the State of Michigan for plan review, while the county page specifically directs existing approved permits to the state UP inspector215.
  • Luce County zoning excludes land inside the Village of Newberry; ask the village about zoning there, while private wastewater facilities still need health-department approval740.
  • The RV occasional-use limits do not apply to seasonal dwelling use in the R-F, L-4 and Stream districts where franchised electrical-grid power is unavailable41.

Sources

  1. Luce County - Building Department (2026 county census)
  2. Building Permit Information, quoted and re-checked
  3. Rural Zoning Ordinance (2026 county census)
  4. Sewage Disposal - Public Health | LMAS District, quoted and re-checked
  5. Upper Peninsula Environmental Health Code, quoted and re-checked
  6. Building Permit Information, quoted and re-checked
  7. Rural Zoning Ordinance, quoted and re-checked
  8. Frequently Asked Questions – Residential Builder (2026 county census)
  9. Rural Zoning Ordinance, State of Michigan—Luce County, quoted and re-checked
  10. Rural Zoning Ordinance, State of Michigan—Luce County, quoted and re-checked
  11. Rural Zoning Ordinance, quoted and re-checked
  12. Rural Zoning Ordinance, quoted and re-checked
  13. Building Permit Information, quoted and re-checked
  14. Luce County Building Department (911 addressing) (lucecountymi.com)
  15. Building Department, quoted and re-checked
  16. State of Michigan Upper Peninsula Building Inspector (lucecountymi.com)
  17. Luce County Zoning Administrator (lucecountymi.com)
  18. LMAS District Health Department, Newberry Office (lmasdhd.org)
  19. Rural Zoning Ordinance, quoted and re-checked
  20. Rural Zoning Ordinance, State of Michigan—Luce County, quoted and re-checked
  21. Rural Zoning Ordinance, quoted and re-checked
  22. Rural Zoning Ordinance, quoted and re-checked
  23. Sewage Disposal - Public Health | LMAS District, quoted and re-checked
  24. Upper Peninsula Environmental Health Code, quoted and re-checked
  25. Application for Residential Sewage Disposal and Water Supply Systems, quoted and re-checked
  26. Sewage Disposal - Public Health | LMAS District, quoted and re-checked
  27. Upper Peninsula Environmental Health Code, quoted and re-checked
  28. lmasdhd.org, quoted and re-checked
  29. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  30. Rural Zoning Ordinance, quoted and re-checked
  31. Rural Zoning Ordinance, quoted and re-checked
  32. Luce County Zoning Ordinance, quoted and re-checked
  33. Subdivisions, quoted and re-checked
  34. Luce County Zoning Ordinance, quoted and re-checked
  35. courts.michigan.gov (Michigan statewide rule), quoted and re-checked
  36. Builders FAQ, quoted and re-checked
  37. Environmental Health Services & Programs - Public Health | LMAS District, quoted and re-checked
  38. Median property tax bill: Bolthole Index county data
  39. Effective property tax rate: Bolthole Index county data
  40. Village of Newberry: Chapter 305: Sewers and Sewage Treatment; Stormwater - Village of Newberry, MI (Luce County), quoted and re-checked
  41. Luce County Zoning Ordinance, quoted and re-checked

Written October 12, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

Compared with neighboring counties

Like 5 of its 6 neighbors, Luce County requires a building permit for a home.

RuleLuce CountySchoolcraft CountyChippewa CountyMackinac CountyAlger CountyEmmet CountyDelta County
Building permitRequiredRequiredRequiredRequiredRequiredLimitedRequired
County zoningYesYesYesYesNoYesYes
Septic permitsLMAS District Health Dept.LMAS District Health Dept.County Health Dept.LMAS District Health Dept.LMAS District Health Dept.Health Dept. of Northwest MichiganPublic Health

County locator

Luce County in Michigan

84
County map
Luce County highlighted among the Michigan counties · colored by Index score

How Luce County scores

Seclusion90100% ev.
Self-Sufficiency58100% ev.
Admin Boringness46100% ev.
Durability83100% ev.
Property Autonomy77100% ev.
Carry Cost84100% ev.

Evidence strength: 100%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$130kTypical home
1%Property tax
$3,109Land / acre
33.9"Annual rain
1.2% of yrsSevere drought
0.2 / yr (+0.2)Mid-century 100°F days
10.2 daysMid-century dry spell
1.4" (+15.7%)Mid-century 1-day rain
1.56×Wildfire change factor
100%Forward climate coverage
$897Home insurance / yr
1.1% / yrInsurance growth
1.03%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
5,126People within 30 min
213,080People within 2 hr
5,231Radius comparison (15 mi)
7.2People / sq mi
3.4%Federal land
87.8%Land at 15% slope or less
0.5%Soils rated "not limited" for septic (strict USDA rating)
2,831 acWorkable land screen
83.1%Wooded land
35.8 tonsBiomass / forest ac
40.9°FAvg temp

Scout Luce County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Luce County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Luce County

Inside a city, town or township here, that government usually sets zoning and may issue its own building permits; the county’s rules above cover land outside them.

Not yet researched: Columbus Township · Lakefield Township · McMillan Township · Pentland Township

Answers from the rulebook for Luce County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Luce County rules

  • InspectionsLimited

    Building inspections for existing approved building permits in Luce County, including the county entry in Michigan's Statewide Jurisdiction List identifying STATE building-code authority effective January 1, 2026.

    • The Luce County page specifically states that inspections by the state UP inspector apply to existing approved permits.
    • Inspection appointments must be scheduled with the state UP inspector, Daniel Grochowski.
    • The Statewide Jurisdiction List identifies Luce County building authority as STATE effective 2026-01-01.
    • The cited sources do not establish that every type of construction or every permit requires the same inspection sequence.

    statewide jurisdiction-list effective date: 2026-01-01

    “For existing approved permits, inspections will now be done by the state UP inspector, Daniel Grochowski. To schedule an inspection appointment, he can be reached at 906-235-2592 or GrochowskiD@michigan.gov”
  • County-wide zoningPresent (with conditions)

    County zoning in the unincorporated portions of Luce County.

    • The ordinance expressly excludes the Village of Newberry.
    • The ordinance establishes zoning districts, nonconforming-use provisions, a Board of Appeals, amendment procedures, and administration provisions.
    • The ordinance divides the unincorporated area into Residential, Agricultural-Residential, Recreational-Forest, Commercial, Industrial, Lakes, Streams, Rural-Residential, and Residential/Retail Commercial districts.
    “To achieve the purposes set forth in the preamble, the unincorporated area of Luce County is hereby divided into the following districts:”
  • Local zoningVaries (with conditions)

    Countywide aggregate of local zoning: Luce County administers rural zoning in unincorporated areas, while the cited county ordinance excludes the Village of Newberry and does not establish that every incorporated municipality follows the county ordinance.

    • The county rural ordinance applies only to unincorporated portions of Luce County.
    • The Village of Newberry is expressly excepted from the county ordinance.
    • This aggregate claim does not determine the contents of municipal or village ordinances not reviewed.
    “governing the unincorporated portions of Luce County, State of Michigan, except the Village of Newberry”
  • Minimum dwelling sizeDistrict specific (with conditions)

    New dwellings in the unincorporated portions of Luce County covered by the county Rural Zoning Ordinance.

    • R-1, A-R, C-1, and RR-1 one-family dwellings require at least 720 square feet of first-floor space and 14 feet minimum width; two-family dwellings require at least 1,440 square feet and the same width.
    • Off-grid seasonal dwellings in R-F, L-4, and Stream districts require at least 576 square feet and 14 feet minimum width.
    • On-grid one-family dwellings in L-1, L-2, L-3, L-4, and Stream districts require at least 720 square feet and 24 feet minimum width.
    • Floor-space measurements exclude attached garages, open porches, and other attached structures identified in the ordinance.

    R-1/A-R/C-1/RR-1 one-family minimum first-floor area: >= 720 square feet · R-1/A-R/C-1/RR-1 one-family minimum width: >= 14 feet (throughout the entire length of the dwelling) · R-1/A-R/C-1/RR-1 two-family minimum first-floor area: >= 1440 square feet · R-F/L-4/Stream off-grid seasonal minimum first-floor area: >= 576 square feet · L-1/L-2/L-3/L-4/Stream on-grid one-family minimum first-floor area: >= 720 square feet

    “not less than 720 square feet of first floor space”
  • Minimum lot sizeDistrict specific (with conditions)

    Lots and dwellings in the unincorporated portions of Luce County under the county zoning district schedule.

    • The ordinance excepts properties with lesser lot sizes whose descriptions were recorded in the County Register of Deeds on the date of adoption.
    • Existing legal nonconforming lots may qualify for reduced area and width requirements under §11.02.C–D, including public-water and public-water-plus-sewage conditions; no such lot may be less than 60 feet wide.
    • The chart identifies district-specific minimums; C-1 and I-1 rows provide yard figures but no lot-area figure in the cited chart excerpt, so no absence is inferred.

    R-1 dwelling minimum lot area: >= 20000 square feet · A-R dwelling minimum lot area: >= 20000 square feet · R-F seasonal dwelling minimum lot area: >= 435600 square feet (10 acres) · L-1 dwelling minimum lot area: >= 20000 square feet (640+ acres designation appears in chart) · L-2 dwelling minimum lot area: >= 40000 square feet (100–640 acres designation appears in chart) · L-3 dwelling minimum lot area: >= 108900 square feet (20–99 acres designation appears in chart) · L-4 dwelling minimum lot area: >= 435600 square feet (5 to 19 acres designation appears in chart) · S-1 dwelling minimum lot area: >= 435600 square feet (10 acres)

    “minimum lot size area of 40,000 square feet”
  • SetbacksDistrict specific (with conditions)

    Buildings, structures, yards, and specified uses in unincorporated Luce County zoning districts.

    • The chart uses 50 feet from the edge of the fronting roadway for starred front setbacks and 50 feet from the high-water mark for double-starred front setbacks.
    • Stream districts require 100 feet from the ordinary high-water mark; mineral extraction requires 400 feet; septic systems require 150 feet from the ordinary high-water mark and 100 feet from other specified drainage systems.
    • Rural Residential animal-husbandry structures require 300 feet from adjacent residences and 100 feet from certain adjacent lot lines.
    • Variances may be granted for Stream District high-water setbacks in cases of hardship or unusual circumstances.

    R-1/A-R/R-F/C-1/I-1 front setback: 50 feet (from edge of fronting roadway) · R-1/A-R/R-F/C-1/I-1 side yard: 10 feet · R-1/A-R/R-F/C-1/I-1 rear yard: 25 feet · Stream District building setback: >= 100 feet (from ordinary high-water mark; hardship or unusual-circumstance variances may be granted) · Stream District mineral extraction setback: >= 400 feet · Stream District septic setback: >= 150 feet (from ordinary high-water mark) · Stream District septic drainage setback: >= 100 feet (from any other surface or subsurface drainage system discharging to the river)

    “New buildings and structures shall be setback a minimum of 100 feet from the ordinary high water mark. Variances may be granted in cases of hardship or unusual circumstances.”
  • Living in an RVTemporary only (with conditions)

    Occupancy of one trailer coach by a property owner during actual dwelling construction on qualifying premises in any county zoning district covered by the ordinance.

    • No more than one trailer coach may be erected or moved onto premises that qualify for a dwelling.
    • Occupancy is limited to the actual construction period and may not exceed 12 consecutive months from issuance of the certificate of compliance.
    • Extensions may be granted for extenuating circumstances, with up to three additional 12-month extensions under proven extenuating circumstances.
    • Water-supply and sewage-disposal facilities conforming to Section 11.06 must be installed and approved by the Luce-Mackinac Health Department before occupancy.
    • The applicant must sign the filed certificate of compliance acknowledging its limitations and possible penalties.

    maximum number of trailer coaches: <= 1 trailer coach (premises must qualify for a dwelling) · initial occupancy period: <= 12 consecutive months (measured from issuance of certificate of compliance) · maximum extensions: <= 3 extensions of 12 months (only under proven extenuating circumstances)

    “during the actual construction of his dwelling”
    2 more reviewed findings on this topic
    • Allowed — Seasonal dwelling use of trailer coaches, recreational vehicles, park model seasonal homes, tents, and similar portable facilities in the Recreational-Forest, Lake-4, and Stream Districts where franchised electrical grid power is unavailable.
      “may be utilized for seasonal dwelling purposes”
    • Limited — Residential, seasonal, and temporary recreational-vehicle occupancy in the unincorporated portions of Luce County governed by the Rural Zoning Ordinance, excluding the Village of Newberry.
      “maximum of one hundred eighty (180) days”
  • Camping on your landLimited

    Temporary camping or temporary RV occupancy in the unincorporated portions of Luce County governed by the Rural Zoning Ordinance, excluding the Village of Newberry.

    • The ordinance limits portable-facility occupancy to licensed trailer-coach parks and Section 11.05.C, subject to the stated seasonal-dwelling exception in the Recreational-Forest, Lake-4, and Stream Districts without franchised electrical-grid power.
    • A person may temporarily park, store, or temporarily occupy an RV as an accessory use in a residential-type land-use district subject to the ordinance conditions.
    • Only one RV may be temporarily occupied on vacant land without local Health Department approval under Section 15.15, and a trailer-coach park must be a conditional use for the district and be approved by the Luce County Planning Commission at a public hearing.
    • Temporary occupancy is limited to one RV per lot or parcel and 180 total days per calendar year.
    • A Recreational Vehicle Occasional Use Permit is required for each occasional-use occupancy period; the $15 fee may be adjusted by the Board of Commissioners, and the permit must be posted in a protected, easily visible location near the right-of-way.
    • Camping trailers, full tent trailers, trailer coaches, and similar vehicles fall within the ordinance's recreational-vehicle or trailer-coach provisions.
    • Permanent living quarters and permanent dwellings are prohibited for RVs and park-model seasonal recreational homes except as allowed by the standards in Section 11.05.

    maximum temporary occupancy: <= 180 days per calendar year (one RV per lot or parcel) · trailer-coach park threshold: >= 2 trailer coaches (a trailer-coach park is an area accommodating two or more trailer coaches and requires State Health Department approval under Section 15.15)

    “The location and occupancy of trailer coaches, recreational vehicles, park model seasonal homes, tents and similar portable facilities shall be limited to licensed trailer coach parks (campground section 15.15 LCZO) and as set forth in section 11.05.C LCZO, except that such facilities may be utilized for seasonal dwelling purposes without such limitations when located in the Recreational-Forest Zoning District, Lake-4 District and Stream Districts without availability of franchised electrical grid power.”
    2 more reviewed findings on this topic
    • Allowed — Seasonal dwelling or seasonal camping use of trailer coaches, recreational vehicles, park model seasonal homes, tents, and similar portable facilities in the Recreational-Forest, Lake-4, and Stream Districts without franchised electrical grid power.
      “except that such facilities may be utilized for seasonal dwelling purposes without such limitations when located in the Recreational-Forest Zoning District, Lake-4 District and Stream Districts without availability of franchised electrical grid power.”
    • Limited — Temporary trailer-coach camping/occupancy by a property owner during actual dwelling construction on qualifying premises in any county zoning district covered by the ordinance.
      “Up to three (3), twelve-month extensions”
  • Tiny homesLimited

    A proposed one-family dwelling characterized as a tiny home in unincorporated Luce County.

    • In R-1, A-R, C-1, and RR-1 districts, a one-family dwelling must be at least 14 feet wide throughout its entire length and contain at least 720 square feet of first-floor space.
    • In off-grid R-F, L-4, and Stream districts, a one-family seasonal dwelling must be at least 14 feet wide and contain at least 576 square feet of first-floor space.
    • In on-grid L-1, L-2, L-3, L-4, and Stream districts, a one-family dwelling must be at least 24 feet wide and contain at least 720 square feet of first-floor space.
    • The structure must otherwise qualify as a dwelling and comply with applicable zoning, building, water, and sewage requirements.

    minimum width: >= 14 feet (R-1, A-R, C-1, RR-1, and specified off-grid districts) · minimum first-floor area: >= 720 square feet (R-1, A-R, C-1, RR-1, and specified on-grid districts) · minimum first-floor area: >= 576 square feet (off-grid R-F, L-4, and Stream districts) · minimum width: >= 24 feet (on-grid L-1, L-2, L-3, L-4, and Stream districts)

    “Every one family dwelling hereafter erected shall have a minimum width throughout the entire length of the dwelling of 14 feet measured between the exterior part of the walls having the greatest length and shall contain not less than 720 square feet of first floor space”
  • Manufactured homesLimited

    Mobile/manufactured-home park occupancy in the unincorporated Luce County districts covered by the Rural Zoning Ordinance.

    • The ordinance defines a mobile home park as an area accommodating two or more mobile homes.
    • Mobile home parks are listed as conditional uses in the Rural-Residential RR-1 district and require the Section 11.08 special-approval process.
    • The ordinance does not provide a separate general manufactured-home occupancy rule for an individual manufactured home on a private parcel in the cited provisions.
    “10.02.B CONDITIONAL USES (As provide for in Section 11.08) [...] 4. Mobile Home parks.”
  • Accessory dwellingsLimited

    Accessory dwelling or second-dwelling proposals in unincorporated Luce County.

    • Accessory buildings, structures, and uses are allowed only when customarily incidental to a permitted or approved use and may not be structures for dwelling purposes, temporarily or otherwise, in the R-1 district.
    • A second dwelling may be permitted by Special Approval if the parcel is large enough to meet the minimum lot requirements for each dwelling.
    • Special-approval uses remain subject to the applicable zoning district and the Section 11.08 review criteria.
    “A second dwelling may be permitted by Special Approval only if size of parcel is sufficient to meet minimum lot requirements for each dwelling.”
  • Who permits septicLocal

    On-site sewage systems in Luce County, within the LMAS District Health Department service area.

    • LMAS serves Luce, Mackinac, Alger, and Schoolcraft Counties.
    • The program enforces state and local health regulations.
    “The LMAS District Health Department provides oversight and enforcement to ensure compliance with state and local health regulations.”
  • Septic permitRequired

    New, modified, or replacement sewage disposal systems in Luce County.

    • A thorough site evaluation is conducted before installation.
    • Applicants should contact LMAS for permit applications and system requirements.
    “Our program establishes requirements for construction permits, ensuring that all new, modified, or replacement sewage disposal systems are installed safely and effectively.”
  • Septic inspectionLimited

    Existing residential or commercial on-site sewage treatment and disposal systems in Luce County when a new or increased use is proposed.

    • For an existing system with a Department final-inspection permit record, the Department or authorized representative must find no signs of system failure.
    • The septic tank must have been pumped and evaluated by a septage hauler within the last three years, with a written report on Department forms describing the tank's materials and construction, condition, volume, and outlet-baffle status.
    • The proposed increase may not exceed one bedroom for a residential structure or 150 gallons per day for commercial projected sanitary sewage flow.
    • If the increase exceeds one bedroom or 150 gallons per day, the system must be modified or replaced and permits obtained.
    • If no permit record or final-inspection record exists, a Department or authorized-representative site and soils evaluation is required when adequate site and soil information is unavailable; the applicant must provide excavations.
    • For no-record systems, at least 24 inches of soil must exist between the limiting zone and absorption-system bottom, isolation distances must comply with Table 3-14.2A, the tank must be pumped and evaluated, and the Department evaluation must show no failure.
    • The existing-facility evaluation application lists fees of $185 for septic only, $405 for both septic and well, and an additional $26 per request for island travel; the application is marked Rev. 06/2022.

    septic-only evaluation fee: 185 USD · combined septic-and-well evaluation fee: 405 USD · island travel surcharge: 26 USD per request · maximum residential increase without modification: <= 1 bedroom · maximum commercial increase without modification: <= 150 gallons/day · required prior pumping period: <= 3 years

    “the new or increased use of the system may be granted”
  • Off-grid sanitationLimited

    Earth-pit and vaulted privies serving public or private uses in Luce County where no available sewer exists.

    • Privies may be permitted for public or private use.
    • Privies may not be installed contrary to Michigan construction codes, technical bulletins, policies, or advisories.
    • Privies may not replace a septic system for structures served by pressurized plumbing or otherwise generating water-carried sewage.
    • Vaulted or earth-pit privies may be permitted only if no available sewer exists.
    • Privies are prohibited within a 100-year floodplain boundary, and the owner must document the recognized floodplain elevation upon Department request.
    • Earth-pit privy sites require native-soil permeability of 3 to 45 minutes per inch and at least 60 inches of effective soil depth.
    • Vault privies require a watertight tank of at least 1,000 gallons and must be located to facilitate pumping.
    • Privies must be at least 50 feet from habitable buildings other than the building they serve and must meet Table 3-14.2A isolation distances.

    earth-pit privy effective soil depth: >= 60 inches · vault privy minimum tank capacity: >= 1000 gallons · privy separation from other habitable buildings: >= 50 feet · soil permeability range: 3-45 minutes per inch

    “Privies may be subject to local township ordinances regarding type and location and are intended for remote sites with no available public utilities or plumbing.”
    2 more reviewed findings on this topic
    • Limited — Privies and other off-grid sanitation options for remote sites in Luce County.
      “Privies may be subject to local township ordinances regarding type and location and are intended for remote sites with no available public utilities or plumbing.”
    • Limited — Pump-and-haul systems and on-site storage with off-site disposal in Luce County.
      “pump and haul) is prohibited, except as follows:”
  • Well permitRequired

    Construction of a private or other non-community well or water supply system in Luce County, including extensive changes to an existing water supply.

    • A completed application is required and the Department may require an on-site evaluation before issuing the permit.
    • The permit is valid for 24 months; a 30-day grace period exists for an extension request, and the permit may be extended once for 24 months.
    • A permit is not required for minor repairs, including replacing a telescoped well screen, changing screen elevation, deepening or plugging back a bedrock well, installing a liner pipe, replacing a pump, pump controls, pump drop pipe, or pressure tank, or chemical treatment or disinfection.
    • A local-health-department permit is not required for wells under Michigan's Mineral Well Act.
    • A local-health-department permit is not required when the owner, agent, well driller, or pump installer must obtain a permit directly from EGLE under Michigan's Safe Drinking Water Act; the applicable EGLE permit remains required.
    • During a lack-of-water undue-hardship emergency while the Department is closed, repair or new-well construction may begin without prior notification or permit, but the Department must be contacted the next working day to obtain a permit and all other code provisions remain applicable.
    • The well driller or contractor must have a valid permit on site during construction unless operating under the emergency condition.
    • Pressurized water may not be plumbed to a building without an approved OSTDS connection or available sewer.

    construction permit validity: 24 months (unless declared void) · permit-extension request grace period: 30 days · permit extension: 24 months (one time) · extensive-change capacity threshold: > 10 gallons per minute

    “water supply construction permit from the Department.”
    One more reviewed finding on this topic
  • Mandatory utility hookupConditional

    Pressurized water connections to residential buildings in Luce County where sewage disposal is regulated through LMAS.

    • Pressurized water may not be connected to a building without an approved septic-system connection or available sewer.
    • If the applicant seeks a permit without an approved septic or available sewer, the required pump type is an approved hand pump.
    • Final inspection is required to verify the hand-pump installation in that exception.
    “Pressurized water shall not be plumbed to a building without an approved connection to a septic system, or available sewer. If applicant still wishes to obtain a permit then pump type required will be an approved hand-pump with final inspection to verify installation.”
  • Driveway accessLimited

    Driveways serving property in the unincorporated area of Luce County under the county zoning ordinance.

    • Every driveway must be at least 10 feet from any lot line.
    • The 10-foot separation may be waived with written permission from adjacent property owner(s).
    • Separate MDOT permitting applies when a driveway is constructed or reconstructed within a state highway right-of-way.

    minimum driveway distance from lot line: >= 10 feet (unless written permission is obtained from adjacent property owner(s))

    “All driveways shall be a minimum of ten (10) feet from any lot line, unless, written permission Is obtained from the adjacent property owner(s).”
  • Permit feesVariable (with conditions)

    Luce County zoning certificates and related permit applications in the unincorporated portions of Luce County, except the Village of Newberry.

    • The ordinance governs the unincorporated portions of Luce County except the Village of Newberry.
    • A fee is required for each permit application and the application is not valid until the required fee is paid.
    • The Board of Commissioners establishes the fee schedule from time to time.
    • The county permit-application page directs applicants to contact the county office for fee quotes.

    permit application fee: established from time to time by the Board of Commissioners

    “An ordinance, to establish zoning districts and provisions governing the unincorporated portions of Luce County, State of Michigan, except the Village of Newberry [...] For each permit application, a fee shall be paid to the County Treasurer. No permit application shall be valid until the required fee is paid. The schedule for fees required by this ordinance shall be established from time to time by the Board of Commissioners.”

Michigan rules that apply here

  • Building permitRequired

    Construction of a building or structure, and changes to the use or occupancy of a structure, in Luce County under Michigan's statewide construction-code system.

    • A permit is not required for ordinary repairs.
    • Ordinary repairs do not include cutting away walls or partitions, removing structural beams or bearing supports, changing required means of egress, rearranging exit requirements, or work affecting public health or general safety.
    • The application must be submitted to the appropriate enforcing agency.
    • Luce County's official building-department page directs new building-permit submissions to the State of Michigan for plan review.
    “Before construction of a building or structure, an owner, or the owner's builder, architect, engineer, or agent, shall submit an application in writing to the appropriate enforcing agency for a building permit. A permit is also required when the use or occupancy of a structure or portion thereof is changed. A permit is not required for ordinary repairs.”
    One more reviewed finding on this topic
    • Required — Construction of a building or structure in Michigan, subject to exceptions in the Michigan construction code.
      “Except as otherwise provided in the code, before construction of a building or structure, the owner, or the owner's builder, architect, engineer, or agent, shall submit an application in writing to the appropriate enforcing agency for a building permit.”
  • Owner-builder exemptionAvailable (with conditions)

    Michigan residential-builder licensing when an individual erects a residential structure or combination residential and commercial structure for the individual's own use and occupancy on the individual's property.

    • The exemption concerns the residential-builder licensing definition and does not eliminate otherwise applicable building-permit, inspection, code, zoning, or utility requirements.
    • The owner-builder must personally satisfy the statutory own-use, own-occupancy, and own-property conditions stated in the source.
    • The source states that persons constructing residential structures for compensation are generally within the residential-builder licensing definition, subject to statutory exceptions.
    “or a person who erects a residential structure or combination residential and commercial structure except for the person's own use and occupancy on the person's property.”
    One more reviewed finding on this topic
    • Available (with conditions) — An owner constructing or acting as general contractor for a residential structure for the owner's own use and occupancy on the owner's property in Luce County.
      “Notwithstanding article 6, a person may engage in the business of or act in the capacity of a residential builder or a residential maintenance and alteration contractor or salesperson in this state without a license under this article, if the person is 1 of the following: [...] (b) An owner of property, with reference to a structure on the property for the owner's own use and occupancy.”
  • Building code adoptedAdopted (with conditions)

    Construction, alteration, relocation, demolition, use, and occupancy of buildings and structures statewide in Michigan, including residential requirements administered under the Michigan Residential Code.

    • The current Michigan Building Code is the 2021 edition and is effective April 9, 2025.
    • The rule adopts the International Building Code by reference with Michigan amendments and exceptions.
    • The adopted rule excludes sections 104.2, 104.3, 104.8, 104.8.1, 104.10, 105.3, 105.3.1, 105.3.2, 105.6, 109.2 to 109.6, 111.2, 111.3, 113.2, 113.3, 113.4, 114.1, 114.2, 114.3, 114.4, 115.1 to 115.4, 423.5, 423.5.1, 423.5.2, 903.2.8.4, 2902 to 2902.6, Table 2902.1, section 3005.5, the definition of agricultural building in section 202, and the definition of recreational vehicle in Appendix G.
    • The rule also incorporates IECC 2021, IEBC 2021, IMC 2021, IPC 2021, IPSDC 2021, and NFPA 70 2023 as listed in chapter 35.
    • Residential requirements are contained in the Michigan Residential Code.
    • The code may be purchased from the International Code Council through the bureau website at a cost of $144.00 as of the time of adoption of the amendatory rules.

    building code edition: 2021 Michigan Building Code (Michigan amendments and listed exceptions apply) · effective date: 2025-04-09

    “The provisions of the international building code, 2021 edition, including appendices F, G, and H, except for [...] govern the construction, alteration, relocation, demolition, use, and occupancy of buildings and structures, and, with exceptions noted, the international building code is adopted by reference in these rules.”
  • Certificate of occupancyRequired

    A new building or altered building subject to the Michigan construction code.

    • The building or altered building may not be used or occupied until the code official issues a Certificate of Occupancy.
    • The permit holder or authorized agent must submit a written request after project completion.
    • The request must include applicable building, electrical, mechanical, plumbing, boiler, elevator, plan-review, and school fire-services project numbers.
    • The certificate cannot be issued until all fees are paid, permits are finaled, and permitted work is completed in accordance with the permit, code, and applicable laws and ordinances.
    • If an electrical, mechanical, plumbing, boiler, elevator, plan-review, or Fire Services project is not required, the request must state “not applicable.”
    “A new building or a building that is altered shall not be used or occupied until a Certificate of Occupancy is issued by the code official.”
  • Zoning districtsPartial

    Michigan's statutory zoning framework for counties, townships, cities, and villages; this does not identify the actual zoning districts adopted by each local government.

    • Actual zoning districts and district regulations are local and must be checked in the applicable county, township, city, or village ordinance.
    • The cited act's stated effective date is July 1, 2006.
    “to provide for the establishment in counties, townships, cities, and villages of zoning districts;”
  • Agricultural exemptionConditional

    Building-permit exemption for shade cloth structures constructed for nursery or agricultural purposes under Michigan Building Code Part 4.

    • The exemption applies to shade cloth structures constructed for nursery or agricultural purposes.
    • Service systems are excluded from the exemption.
    • The exemption does not authorize work violating the building code or other laws or ordinances of the jurisdiction.
    “Exemptions from permit requirements of the code shall not be deemed to grant authorization for any work to be done in any manner in violation of the provisions of the code or any other laws or ordinances of this jurisdiction. Permits shall not be required for any of the following: [...] (x) Shade cloth structures constructed for nursery or agricultural purposes, not including service systems.”
  • Subdividing landRegulated (with conditions)

    Subdivision plat review and administration under Michigan's Land Division Act statewide.

    • The Office of Land Survey and Remonumentation administers applicable Land Division Act provisions.
    • Staff conducts final reviews of plat maps for compliance with the Act.
    • Final plats are authorized for submission to the Register of Deeds for proper recordation.
    “The Office of Land Survey and Remonumentation administers the applicable provisions of the Land Division Act, 1967 PA 288 in order to ensure the orderly development of subdivisions in the State of Michigan. Staff conducts final reviews of plat maps to ensure compliance with the Act and authorizes final plats to be submitted to the Register of Deeds for proper recordation.”
    2 more reviewed findings on this topic
    • Regulated (with conditions) — Subdivision plats affecting land in Luce County and elsewhere in Michigan.
      “in order to ensure the orderly development of subdivisions in the State of Michigan.”
    • Regulated (with conditions) — Subdivision plat review and recordation in Michigan.
      “The Office of Land Survey and Remonumentation administers the applicable provisions of the Land Division Act, 1967 PA 288 in order to ensure the orderly development of subdivisions in the State of Michigan. Staff conducts final reviews of plat maps to ensure compliance with the Act and authorizes final plats to be submitted to the Register of Deeds for proper recordation.”
  • Building in a floodplainRequired

    Alteration or occupation of the 100-year floodplain of a Michigan river, stream, or drain regulated under Part 31.

    • The Part 31 permit requirement applies to rivers, streams, or drains with a drainage area of 2 square miles or greater.
    • A Part 31 EGLE permit is not required for alterations within floodplains of the Great Lakes, inland lakes, or watercourses with drainage areas less than 2 square miles, although other NREPA reviews may still be necessary.
    • Construction and fill may be permitted in non-floodway portions if local ordinances and building standards are met and compensating excavation is provided equal to the volume of fill placed in the floodplain.
    • New residential construction is specifically prohibited in the floodway.
    • The minimum residential elevation standard is one foot above the 100-year flood elevation, and some communities or counties may impose a higher standard.

    Minimum drainage area for Part 31 floodplain authority: >= 2 square miles (Part 31 does not apply below this threshold) · Lowest-floor elevation: >= 1 foot above 100-year flood elevation (Some communities and counties may require a higher elevation)

    “The Floodplain Regulatory Authority deals with the floodplains of rivers, streams, or drains which have a drainage area that is 2 square miles or greater. A permit is not required from EGLE, under Part 31, for alterations within the floodplains of the Great Lakes, inland lakes, or watercourses which have a drainage area less than 2 square miles.”
  • Permit processPublished (with conditions)

    Building-permit applications for projects in Luce County when the State of Michigan is the appropriate enforcing agency.

    • Before construction of a building or structure, the owner or the owner's builder, architect, engineer, or agent must submit a written application to the appropriate enforcing agency.
    • A permit is also required when the use or occupancy of a structure or part of it changes.
    • Ordinary repairs do not require a permit, but ordinary repairs exclude structural changes, changes to required means of egress, and additions, alterations, replacements, or relocations affecting standpipes, water supply, sewer, drainage, gas, electric, mechanical work, public health, or general safety.
    • Construction documents are required with each application, subject to waiver by the building official when code compliance can be determined from the application description.
    • Sealed and signed construction documents are generally required, except for one- and two-family dwellings under 3,500 square feet of calculated floor area, public works under $15,000 in total construction cost, and other statutory exceptions.
    • The Statewide Jurisdiction List must be reviewed because enforcement may be conducted by the state, county, or local unit of government.
    • For Luce County's published process, new building permits are submitted to the State of Michigan for plan review, online account creation is required, online payment is available, and existing approved permits are inspected by the state UP inspector.

    one- and two-family dwelling threshold for seal and signature exception: < 3500 square feet of calculated floor area (other statutory exceptions may apply) · public works threshold for seal and signature exception: < 15000 USD total construction cost (other statutory exceptions may apply)

    “New building permits must now be submitted to the State of Michigan for plan review at the website below. You may print out and mail your permit; however, this will add more time to the process. [...] You will need to make an account, and you will be able to pay for your permit online. [...] For existing approved permits, inspections will now be done by the state UP inspector, Daniel Grochowski.”
    One more reviewed finding on this topic
    • Published — Michigan Bureau of Construction Codes boiler, building, electrical, elevator, mechanical, and plumbing permit processing.
      “The Inspections Division is responsible for issuing boiler, building, electrical, elevator, mechanical, and plumbing permits. Permits can be checked and obtained expeditiously online at: https://aca-prod.accela.com/lara/ . Additionally, permits can be obtained via mail; however, applying by mail may cause delays in the applications process.”
  • Campground & park staysLimited

    Tiny houses, including tiny houses built on wheels, proposed as resort cabins or similar occupancy in Michigan.

    • The source distinguishes tiny houses from recreational units and states they cannot be treated as recreational units even if built on wheels.
    • The tiny house must be built as a resort rather than a campground.
    • Local health department permitting for wells, septic tanks, and drainfields is required as applicable.
    • Local zoning, building, electrical, and plumbing permits and final approvals are required under local authorities.
    • The source does not establish statewide zoning permission or a statewide right to occupy a tiny house.
    “Local zoning, building, electrical, plumbing permits and final approvals under local authorities.”
    3 more reviewed findings on this topic
    • Limited — RV occupancy as part of a Michigan campground consisting of five or more recreational units used for temporary living quarters.
      “requires a campground license when five or more recreational units (i.e., tents, campers, RVs) are placed on a parcel or tract of land”
    • Limited — Temporary camping in a Michigan temporary campground.
      “A temporary campground license issued by the local health department (LHD) having jurisdiction is required prior to operating a temporary campground.”
    • Limited — Occupancy of RVs and other recreational units as temporary living quarters in a Michigan campground offering sites to the public or members of an organization, where 5 or more recreational units are involved.
      “A campground owner shall ensure that a site is occupied by not more than 8 persons and by not more than 1 recreational unit.”
  • county building authorityGeneral

    Michigan counties serving as building-code enforcing agencies for residential construction in unincorporated areas, subject to the Statewide Jurisdiction List and local/state jurisdiction assignments.

    • Before construction, a written building-permit application must be submitted to the appropriate enforcing agency.
    • A permit is also required when use or occupancy changes.
    • Ordinary repairs do not require a permit, but the stated structural, egress, plumbing, electrical, mechanical, and public-health/safety limitations apply.
    • The Michigan Building Code and Michigan Residential Code govern construction; county enforcement applies only where the Statewide Jurisdiction List designates county jurisdiction.
    “If COUNTY is indicated, that unit of government receives code enforcement services from a county enforcing agency.”

Set by your township or city, not the county

In Michigan, zoning is adopted by each township or city, so Luce County has no county-wide answer on these. Find your township or city in the list of places on this page, or call its clerk or zoning administrator.

  • Building height
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Luce County, Michigan

Is Luce County a good place to live off-grid or homestead?

Luce County scores 84/100 on the Bolthole Index, a strong county profile. Its strengths: sparse surroundings — about 5,126 people within a 30-minute drive and manageable long-term carry cost.

Do you need a building permit in Luce County, Michigan?

Luce County generally requires a residential building permit, and it enforces county zoning. Onsite septic is permitted by LMAS District Health Department. Owner-builders may act as their own contractor to build their home. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

Can you live in an RV or tiny home on your land in Luce County?

Living in an RV on your own land in Luce County is allowed on a temporary basis only: Occupancy of one trailer coach by a property owner during actual dwelling construction on qualifying premises in any county zoning district covered by the ordinance. No more than one trailer coach may be erected or moved onto premises that qualify for a dwelling. Occupancy is limited to the actual construction period and may not exceed 12 consecutive months from issuance of the certificate of compliance. A tiny home is limited to specific cases. Confirm with the county before relying on it.

How much does land cost in Luce County, Michigan?

Land in Luce County runs about $3,109 per acre, based on the latest county data.

What is the water situation in Luce County?

Luce County gets about 33.9" of rain a year, with severe drought in roughly 1.2% of years.

How remote is Luce County?

A representative private-land location has about 5,126 people within a 30-minute drive and 213,080 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.