Bolthole Index

Clay County, Minnesota

Building permits, zoning and septic rules in Clay County, Minnesota

47Index Score / 100
#78 of 87 in Minnesota

Unincorporated Clay County, Minnesota requires county building permits for buildings and additions, and for moving in manufactured, prefabricated or trailer homes12. Clay County Planning and Zoning administers rural zoning; township rules may also apply3. Clay County Environmental Health issues septic permits for rural and urban properties, including addresses inside cities4.

At a glance

Building permit
Required for buildings and additions on unincorporated land1
Zoning
County zoning applies outside municipalities; township rules may also apply5
Septic permit
New systems need a design, county permit and inspection before backfilling6
RV use
Limited to 2 highway-ready RVs on an individual lot of record7
Owner-builder
Eligible owners may build without a residential contractor license, but permits still apply8
Permit process
Site sketch and township signature, county review, posted zoning certificate and final inspection910
Accessory dwelling
One detached unit is allowed on a qualifying property with an existing home11

Who to call

Building permits

Clay County Planning and Zoning Office (Building & Land Alteration Permits)

Building and land-alteration permits for construction, additions, and moving in manufactured/pre-fab/trailer homes, outside Clay County's 11 incorporated cities

218-299-5012

3510 12th Ave. S., Moorhead, MN 56560

Planning & zoning

Clay County Planning Office

Land Development Ordinance administration, zoning and subdivision regulations for unincorporated Clay County

218-299-5005

3510 12th Ave S, Moorhead, MN 56560

Septic permits

Clay County Environmental Health

Septic (SSTS) system permits, design review, inspections and certifications for Clay County

715 11th Street N., Moorhead, MN 56560

Contact details are copied from each office’s official page and were checked against it on October 13, 2026.

Off-grid gear

Going off-grid in Clay County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Clay County, Minnesota?

Yes. Clay County Planning and Zoning requires a building permit for buildings and additions on unincorporated land, including decks, garages, porches, sheds, manufactured homes, prefabricated buildings and trailer homes1. Moorhead and Barnesville issue their own building permits inside city limits1213. Septic permits remain with Clay County Environmental Health in rural and urban areas4. The Minnesota State Building Code is the minimum construction standard throughout the state, including counties and townships, but it is not enforceable by a local government unless that government adopts it by ordinance14. We could not confirm whether unincorporated Clay County has adopted it or what code inspections apply; ask Planning and Zoning before you design15. An eligible owner who will occupy the property or retain it as a rental may personally build without a residential contractor license, but that licensing exemption does not waive county permits82.

Who issues Clay County building permits, and how do you reach them?

Clay County Planning and Zoning handles county building and land-alteration permits at 3510 12th Ave. S. in Moorhead; the office phone is 218-299-501216. The application needs parcel and applicant information, current use, construction and contractor details, applicable shoreland data, and a site sketch9. Submit the township-signed application to the Planning and Zoning Director with the fee, sewage information and any applicable flood certification or state or federal permits917. The ordinance gives the Zoning Administrator 10 working days to approve, deny or refer the application17. The building-permit fee is $25 plus $1 per $1,000 of structure value18. After approval, the county mails a zoning certificate for posting; construction must begin within 6 months and be substantially complete within 1 year unless extended917. Notify the Zoning Administrator immediately after completion for final inspection10.

Does Clay County have zoning, and who zones inside cities?

Clay County zoning applies outside municipal limits, where adopted township regulations may also apply and the most restrictive conflicting provision controls3. Moorhead, Dilworth, Barnesville and Hawley have their own zoning, and the county's zoning page says its incorporated cities, including Comstock, Felton, Georgetown, Glyndon, Hitterdal, Sabin and Ulen, manage their own zoning and permitting1920212223. Septic permits stay with Clay County Environmental Health either way4. County districts include Agricultural General, Agricultural Service Center, Highway Commercial, Limited Highway Commercial and Urban Expansion, with shoreland, flood-hazard and other overlays affecting development24. Agricultural General administrative and standard subdivision lots need at least 1.5 acres and 200 feet of width; cluster lots need 1.5 acres and 100 feet, while agricultural or natural-resource subdivision lots need 1 acre and 100 feet2526. Shoreland districts have separate lot-area and width tables25. For commercial or industrial use, Agricultural Service Center lots need 1 acre and 200 feet of width, while Highway Commercial and Limited Highway Commercial lots need 1 acre and 100 feet27. Maximum lot coverage varies by district and development type, and shoreland rules also limit impervious surface in some situations28; commercial and industrial uses in the Agricultural Service Center, and all uses in the two highway commercial districts, are capped at 30% coverage27. Agricultural General rear and side setbacks are 25 feet and 15 feet; accessory structures have 5-foot rear and 10-foot side setbacks29. Road setbacks run from the centerline: 175 feet for principal arterials, 125 feet for minor arterials and collectors, and generally 90 feet for township roads, with 75 feet in Oakport Township and 65 feet in the Urban Expansion District; the stricter yard or roadway setback applies30.

Who issues septic permits in Clay County, and does that change inside cities?

Clay County Environmental Health issues septic permits and certifications and inspects rural and urban systems throughout Clay County, so a city address still goes to the county for septic permits even though the city issues its own building permits314. Every new septic system needs a design, a county permit and an inspection before backfilling32. Existing septic systems must be certified by the county before an ownership transfer, and the seller is responsible for arranging that inspection33. A building-permit project in the Shoreland Zoning District, or a project that adds a bedroom, also triggers inspection and certification of the on-site system16. Site feasibility deserves early attention because only about 7.1% of Clay County soils are rated without severe limitations for a conventional drain field34. Ask Clay County Environmental Health to review the septic plan before fixing the house location32.

Can you live in an RV or tiny home on your land in Clay County?

Clay County allows no more than 2 recreational vehicles on an individual lot of record in its unincorporated jurisdiction7. Each RV must have current highway-use licensing, remain highway-ready on wheels or an internal jacking system, use only quick-disconnect utilities and have no permanent structural additions; floodplain requirements still apply7. That placement rule does not confirm full-time occupancy, so ask the Planning Office whether the intended living arrangement is permitted3536. Clay County does allow one detached accessory dwelling on a conforming property with an existing single-family home; it must be at least 150 square feet, no more than 75% of the main home's floor area, and meet foundation, location, sewage and district restrictions11. We could not confirm a county rule specific to tiny-home occupancy or a general minimum size for a principal dwelling; ask the Clay County Planning Office before choosing a design36. A new manufactured home installed for occupancy requires a federal installation inspection statewide37.

What are the steps to build a home in Clay County?

  1. Ask the Clay County Planning Office to identify the parcel's district, overlays, setbacks and any township or municipal review32430.
  2. If access will connect to a county highway, obtain the county access permit before right-of-way work38.
  3. Establish a septic design with Clay County Environmental Health and obtain the permit before installation32.
  4. Prepare the prescribed building application, site and sewage information, obtain the township officer's signature, and submit the fee917.
  5. Allow for the Zoning Administrator's 10-working-day decision period, post the mailed zoning certificate, then begin work within 6 months and substantially complete it within 1 year unless an extension is granted917.
  6. Ask which building-code inspections apply, and notify the Zoning Administrator immediately upon completion for the county's final inspection3917.

What should you check before buying land in Clay County?

Before buying rural Clay County land, ask the Planning Office to confirm the district, overlays, township rules, permitted use, lot dimensions and setbacks3242530. Minimum lot area alone does not establish subdivision approval: administrative subdivisions require a pre-application meeting, fee, Planning Department review and site assessment, while major preliminary plats require completeness review, site assessment, a staff report, Planning Commission review and a public hearing4025. Required final subdivision approvals must precede a development permit, and municipal extraterritorial or township approval may also apply41. Only about 7.1% of county soils are rated without severe limitations for a conventional drain field; existing septic systems must be county-certified before ownership transfers3433. Flood Hazard District projects need applicable county approval and certifications42. County-highway right-of-way work needs a county access permit before work starts38.

Watch-outs

  • A Clay County building-permit application needs a township-officer signature, and the county decision period is 10 working days after submission217. The fee is $25 plus $1 per $1,000 of structure value18.
  • Existing septic systems must be county-certified before an ownership transfer, and the seller must arrange the inspection43.
  • Clay County's 2-RV limit does not itself confirm full-time RV occupancy; ask Planning and Zoning about the parcel's district and intended use736.

Sources

  1. Building & Land Alteration Permit, quoted and re-checked
  2. Building & Land Alteration Permit, quoted and re-checked
  3. Clay County Zoning, quoted and re-checked
  4. On-site Septic Systems, quoted and re-checked
  5. Land Development Ordinance: Zoning and Subdivision Regulations, quoted and re-checked
  6. On-site Septic Systems, quoted and re-checked
  7. claycountymn.gov, quoted and re-checked
  8. revisor.mn.gov (Minnesota statewide rule), quoted and re-checked
  9. Building & Land Alteration Permit, quoted and re-checked
  10. Clay County Land Development Ordinance, quoted and re-checked
  11. Clay County Land Development Ordinance, quoted and re-checked
  12. Moorhead: Building Permits (Clay County), quoted and re-checked
  13. Barnesville: § 150.017 Building Permits (Clay County), quoted and re-checked
  14. Overview of the Minnesota State Building Code, quoted and re-checked
  15. 2025 Minnesota Statutes, section 326B.121 (Minnesota statewide rule), quoted and re-checked
  16. Clay County Planning and Zoning Office (Building & Land Alteration Permits) (claycountymn.gov)
  17. Clay County Land Development Ordinance, quoted and re-checked
  18. Land Use & Zoning Applications & Requests, quoted and re-checked
  19. Moorhead: 10-12C-6 Lot Requirements and Setbacks (Clay County), quoted and re-checked
  20. Dilworth: Dilworth Code § 153.001, Purpose and Intent (Clay County), quoted and re-checked
  21. Barnesville: Chapter 151: Zoning (Clay County), quoted and re-checked
  22. Hawley: 10-1-1: Purpose and Intent (Clay County), quoted and re-checked
  23. Clay County Zoning, quoted and re-checked
  24. Clay County Zoning, quoted and re-checked
  25. Clay County Land Development Ordinance, quoted and re-checked
  26. Clay County Land Development Ordinance: Zoning and Subdivision Regulations, quoted and re-checked
  27. Clay County Land Development Ordinance: Zoning and Subdivision Regulations, quoted and re-checked
  28. Clay County Land Development Ordinance: Zoning and Subdivision Regulations, quoted and re-checked
  29. Clay County Land Development Ordinance: Zoning and Subdivision Regulations, quoted and re-checked
  30. Clay County Land Development Ordinance, quoted and re-checked
  31. On-site Septic Systems, quoted and re-checked
  32. On-site Septic Systems, quoted and re-checked
  33. On-site Septic Systems, quoted and re-checked
  34. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  35. Planning and Zoning Services and Permits, quoted and re-checked
  36. Clay County Planning Office (claycountymn.gov)
  37. Manufactured home information (Minnesota statewide rule), quoted and re-checked
  38. Apply for a Access Permit, quoted and re-checked
  39. 1300.0210 INSPECTIONS (Minnesota statewide rule), quoted and re-checked
  40. Land Development Ordinance: Zoning and Subdivision Regulations, quoted and re-checked
  41. Clay County Land Development Ordinance: Zoning and Subdivision Regulations, quoted and re-checked
  42. Clay County Land Development Ordinance, quoted and re-checked
  43. On-site Septic Systems, quoted and re-checked

Written October 13, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

Compared with neighboring counties

Like all 6 of its neighbors, Clay County has countywide zoning.

RuleClay CountyWilkin CountyNorman CountyBecker CountyOtter Tail CountyMahnomen CountyPolk County
Building permitRequiredRequiredRequiredRequiredLimitedLimitedRequired
County zoningYesYesYesYesYesYesYes
Septic permitsCounty Env. HealthCounty Env. OfficeCounty Env. Services Dept.County Planning & ZoningCounty Land & Resource ManagementCounty Zoning & SanitationCounty Env. Services

County locator

Clay County in Minnesota

47
County map
Clay County highlighted among the Minnesota counties · colored by Index score

How Clay County scores

Seclusion43100% ev.
Self-Sufficiency25100% ev.
Admin Boringness43100% ev.
Durability56100% ev.
Property Autonomy65100% ev.
Carry Cost70100% ev.

Evidence strength: 100%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$305kTypical home
1.1%Property tax
$4,738Land / acre
25"Annual rain
5% of yrsSevere drought
2.9 / yr (+2.6)Mid-century 100°F days
17.3 daysMid-century dry spell
1.58" (+6.2%)Mid-century 1-day rain
1.71×Wildfire change factor
100%Forward climate coverage
$1,693Home insurance / yr
3.6% / yrInsurance growth
0.35%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
96,762People within 30 min
635,899People within 2 hr
23,803Radius comparison (15 mi)
63.4People / sq mi
5.8%Federal land
98.9%Land at 15% slope or less
7.1%Soils rated "not limited" for septic (strict USDA rating)
45,980 acWorkable land screen
5.3%Wooded land
43.6 tonsBiomass / forest ac
41.7°FAvg temp

Scout Clay County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Clay County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Clay County

Inside a city, town or township here, that government usually sets zoning and may issue its own building permits; the county’s rules above cover land outside them.

Not yet researched: Alliance Township · Barnesville Township · Comstock · Cromwell Township · Eglon Township · Elkton Township · Elmwood Township · Felton · Felton Township · Flowing Township · Georgetown · Georgetown Township · Glyndon · Glyndon Township · Goose Prairie Township · Hagen Township · Hawley Township · Highland Grove Township · Hitterdal · Holy Cross Township · Humboldt Township · Keene Township · Kragnes Township · Kurtz Township · Moland Township · Moorhead Township · Morken Township · Oakport Township · Parke Township · Riverton Township · Skree Township · Spring Prairie Township · Tansem Township · Ulen · Ulen Township · Viding Township

Answers from the rulebook for Clay County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Clay County rules

  • Building permitRequired

    Construction of buildings or building additions and moving manufactured homes, pre-fab buildings, or trailer homes in unincorporated Clay County.

    • Building permits for incorporated cities are obtained from city officials.
    • The application requires property and construction information, a site sketch, and township-officer signature.
    • Completed applications are processed within 10 days.
    • Construction must begin within 6 months and be substantially completed within 1 year or the permit expires.
    “A Building Permit is required from the county Planning and Zoning office for the construction of any buildings or building additions including:”
    One more reviewed finding on this topic
    • Required — Construction of buildings and building additions, including decks, garages, porches, sheds, manufactured homes, pre-fabricated buildings, and trailer homes in unincorporated Clay County.
      “A Building Permit is required from the county Planning and Zoning office for the construction of any buildings or building additions including:”
  • InspectionsRequired

    Development permitted by Clay County in unincorporated areas.

    • The permit holder must notify the Zoning Administrator immediately upon completion of construction for final inspection.
    “The holder of any Development Permit shall notify the Zoning Administrator immediately upon completion of construction for final inspection.”
  • County-wide zoningPresent (with conditions)

    Clay County zoning and land-development regulation, primarily rural and unincorporated areas.

    • The county ordinance was adopted June 3, 2025.
    • Incorporated cities manage their own zoning and permitting.
    “Over 90% of the land in Clay County is zoned Agricultural General.”
    One more reviewed finding on this topic
    • Present — County zoning in areas outside incorporated municipalities.
      “To find out zoning information on a particular piece of property in rural Clay County, contact the Clay County Planning Office at 218-299-5005 or use the Online Zoning Map tool to identify the zoning on a particular property.”
  • Local zoningVaries (with conditions)

    Aggregate local zoning across Clay County; Clay County regulates rural areas while incorporated cities administer zoning and permitting within their boundaries.

    • The county page states that incorporated cities manage their own zoning and permitting.
    • The listed cities are Barnesville, Comstock, Dilworth, Felton, Georgetown, Glyndon, Hawley, Hitterdal, Moorhead, Sabin, and Ulen.
    “The incorporated cities of Clay County manage their own zoning and permitting for properties / structures within their cities.”
    One more reviewed finding on this topic
    • Varies (with conditions) — Aggregate of zoning administration in unincorporated Clay County and areas subject to township or municipal authority.
      “Some properties may also be subject to township regulations, municipal extraterritorial subdivision authority”
  • Zoning districtsPublished

    County zoning districts and overlays in unincorporated Clay County.

    • Published districts include Agricultural General, Agricultural Service Center, Highway Commercial, Limited Highway Commercial, Flood Hazard, Shoreland, Resource Protection, and Urban Expansion districts, with additional overlay districts identified by the county.
    “The overlay zoning districts are: Landing Field Overlay Resource Protection Aggregate Wellhead Biologically Significant Flood Hazard Zone Floodway Flood Fringe General Flood Plain”
  • Minimum lot sizeDistrict specific (with conditions)

    Minimum lot area and width for AG, Agricultural General District subdivisions in unincorporated Clay County.

    • Administrative and standard subdivisions require a minimum lot area of 1.5 acres and minimum lot width of 200 feet.
    • Cluster subdivisions require a minimum lot area of 1.5 acres and minimum lot width of 100 feet.
    • Agricultural or natural resource subdivisions require a minimum lot area of 1 acre and minimum lot width of 100 feet.
    • Agricultural and natural resource subdivisions must conserve at least 50 percent of the tract for agricultural use or natural resources conservation.
    • A density bonus may provide one additional developable lot for each additional two acres permanently reserved beyond the minimum 50 percent conservation requirement.
    • Overlay zoning districts may impose different requirements.
    • Land within a township may also be subject to township regulations; where conflicting, the most restrictive provisions apply.
    • The ordinance applies outside municipal corporate limits, subject to municipal extraterritorial subdivision jurisdiction and other stated exceptions.

    minimum lot area: 1.5 acres (AG administrative, standard, and cluster subdivisions) · minimum lot width: 200 feet (AG administrative and standard subdivisions) · minimum lot width: 100 feet (AG cluster subdivisions) · minimum lot area: 1 acre (AG agricultural or natural resource subdivisions) · minimum lot width: 100 feet (AG agricultural or natural resource subdivisions)

    “Administrative Subdivision [...] 1.5 acres 200’ [...] Cluster Subdivision [...] 1.5 acres 100’ [...] Agricultural or Natural Resource Subdivision [...] 1 acre 100’”
    2 more reviewed findings on this topic
    • Specified — Lots and subdivision types in Clay County base and shoreland zoning districts.
      “Administrative Subdivision 1 dwelling unit per 40 acres (max 2 if one dwelling unit exists) Same as roadway setback under 8-9-1(D) 25’ (5’ for accessory structures) 15’ (10’ for accessory structures) 1.5 acres 200’ No requirement”
    • District specific (with conditions) — Minimum lot area and width in the ASC, HC, and LHC county base zoning districts in unincorporated Clay County.
      “ASC, Agricultural Service Center District [...] Residential uses [...] 1 acre 200’ [...] Commercial and industrial uses [...] 1 acre 200’ 30% [...] HC, Highway Commercial District All [...] 1 acre 100’ 30% [...] LHC, Limited Highway Commercial District All [...] 1 acre 100’ 30%”
  • SetbacksDistrict specific (with conditions)

    Base-district yard setbacks for development in unincorporated Clay County.

    • AG administrative, standard, cluster, and agricultural or natural resource subdivisions require a front setback equal to the applicable roadway setback, a 25-foot rear setback, and a 15-foot side setback.
    • For AG accessory structures, the rear setback is 5 feet and the side setback is 10 feet.
    • ASC residential, commercial, and industrial uses require a 90-foot front setback from the road centerline, a 25-foot rear setback, and a 15-foot side setback.
    • For ASC accessory structures, the rear setback is 5 feet and the side setback is 10 feet.
    • HC and LHC uses require a front setback equal to the applicable roadway setback, a 40-foot rear setback, and a 30-foot side setback.
    • For HC and LHC, the table does not state accessory-structure reductions.
    • All setback distances are measured from the lot line, except roadway setbacks measured from the roadway centerline and cul-de-sac setbacks measured from the edge of the road right-of-way.
    • Overlay districts, conditional-use permits, and interim-use permits may affect standards, subject to the ordinance minimums and stricter-setback rule.

    rear yard setback: 25 feet (AG and ASC; 5 feet for AG and ASC accessory structures) · side yard setback: 15 feet (AG and ASC; 10 feet for AG and ASC accessory structures) · front setback: 90 feet (ASC, measured from road centerline) · rear yard setback: 40 feet (HC and LHC) · side yard setback: 30 feet (HC and LHC)

    “All setback distances are measured from the lot line. Development must also conform to minimum roadway setbacks and pipeline setbacks as provided by this section.”
    One more reviewed finding on this topic
    • Specified — Structures in Clay County zoning districts and along county and township roads.
      “All structures shall conform to the following minimum roadway setbacks, as measured from the roadway centerline: a. Principal arterial: 175 feet b. Minor arterial: 125 feet c. Collector road: 125 feet Roads entirely within a platted subdivision d. Township (local) road: 90 feet e. Township (local) road (Oakport Township): 75 feet f. Township (local) road (UE District): 65 feet”
  • Lot coverageSpecified

    Lots governed by Clay County zoning and shoreland standards.

    • Maximum lot coverage varies by base zoning district and development type; shoreland provisions also limit impervious surface coverage in specified situations.
    “Table 9-1. Density, Lot Standards, and Setback Requirements for Base Districts”
  • Living in an RVLimited

    Recreational vehicles on individual lots of record and in existing recreational-vehicle parks or campgrounds.

    • Current highway-use licensing is required.
    • No more than two recreational vehicles are permitted on an individual lot of record.
    • Vehicles must be highway-ready, on wheels or an internal jacking system, connected only by quick-disconnect utilities, and have no permanent structural additions.
    • Floodplain requirements also apply.

    maximum recreational vehicles on an individual lot of record: 2 vehicles

    “No more than two (2) recreational vehicles shall be permitted on individual lots of record.”
  • Accessory dwellingsAllowed (with conditions)

    One accessory dwelling unit on a conforming property with an existing single-family dwelling.

    • Minimum size is 150 square feet.
    • The unit must be detached and no larger than 75% of the principal dwelling floor area.
    • It must be on a permanent foundation or be a manufactured home.
    • It may be placed only in the side or rear yard.
    • A qualifying sewage-treatment system or holding tank is required.
    • Accessory dwelling units are prohibited in Flood Hazard Districts.
    • They are prohibited in Tier 1 of the Urban Expansion District; Tier 2 allows one per lot with an Interim Use Permit.

    minimum accessory dwelling unit size: >= 150 square feet · maximum accessory dwelling unit floor area: <= 75 percent of principal dwelling floor area

    “One (1) accessory dwelling unit shall be permitted on any conforming property with an existing single-family dwelling if development conforms to the following requirements: a. The accessory dwelling unit minimum size is 150 square feet. b. The accessory dwelling unit must be detached from the principal dwelling. c. The accessory dwelling unit must not surpass 75% of the principal dwelling floor area.”
  • Who permits septicCounty

    Rural and urban septic systems administered through Clay County Environmental Health.

    • The county sewage treatment ordinance is under Title 6: Sewage Treatment.
    “Clay County Environmental Health inspects rural and urban septic systems, and issues permits and certifications.”
    One more reviewed finding on this topic
    • County — Rural and urban septic systems in Clay County.
      “Clay County Environmental Health inspects rural and urban septic systems, and issues permits and certifications.”
  • Septic permitRequired

    All new septic systems in Clay County.

    • A design, permit, and inspection are required before backfilling.
    • Applications must be returned with required attachments and payment to Clay County Environmental Health.
    “All new septic systems require a design, a permit, and an inspection prior to backfilling.”
    One more reviewed finding on this topic
    • Required — All new septic systems in Clay County.
      “All new septic systems require a design, a permit, and an inspection prior to backfilling.”
  • Septic inspectionRequired

    New and existing septic systems in Clay County.

    • New systems require inspection before backfilling.
    • Existing systems must be certified by the county before transfer of ownership.
    • The seller is responsible for arranging a transfer inspection.
    “All existing septic systems must be certified by the county prior to a transfer of ownership. It is the responsibility of the seller to arrange for an inspection.”
    One more reviewed finding on this topic
    • Required — New septic systems and existing systems transferred with ownership in Clay County.
      “All existing septic systems must be certified by the county prior to a transfer of ownership. It is the responsibility of the seller to arrange for an inspection.”
  • Subdividing landRegulated (with conditions)

    Administrative and major subdivisions subject to Clay County Land Development Ordinance procedures.

    • Administrative subdivision applications require a pre-application meeting, required fee, Planning Department review, and site assessment.
    • Major subdivision preliminary plats require completeness review, site assessment, staff report, Planning Commission review, public hearing, and compliance with Minnesota Statutes section 394.26.
    “Applications for Preliminary Plat approval shall be reviewed within 14 business days for completeness by the Zoning Administrator.”
    One more reviewed finding on this topic
    • Regulated (with conditions) — Subdivision of land in Clay County outside municipal extraterritorial jurisdictions where municipal subdivision regulations apply.
      “It shall be unlawful for any person to subdivide land except as specifically permitted by the processes established in this Chapter. All subdivisions in Clay County shall fully comply with the provisions of this chapter.”
  • Driveway accessRequired

    New or modified driveway/access connections within a Clay County Highway right-of-way.

    • An online application must be submitted through the county ePermitting system.
    • Approval is required before work begins within the right-of-way.
    • The $125 fee includes required inspections.

    access permit fee: 125 USD (Includes required inspections)

    “Any work within the County Highway right-of-way requires a permit from the Clay County Highway Department.”
  • Building in a floodplainRequired

    Development in Clay County Flood Hazard Districts.

    • Flood-hazard development requires applicable county development permitting.
    • Habitable structures or substantial improvements in flood-hazard districts require professional certification of finished elevations or permitted alternative floodproofing.
    • Applicants must provide documentation of required state or federal permits.
    • Floodway and flood-fringe districts impose additional use, elevation, fill, access, and floodproofing standards.

    maximum fill generally permitted: <= 1000 cubic yards (Additional fill may be allowed for structure elevation or transportation projects; other purposes require a Conditional Use Permit)

    “A permit must be obtained from the Zoning Administrator to verify compliance with all applicable standards outlined in this Ordinance prior to the following activities:”
  • Permit feesPublished (with conditions)

    Clay County land-use and development permit fees.

    • Building permit fee: $25 plus $1 per $1,000 of structure value.
    • Administrative subdivision application: $150.
    • Additional recording fees may be collected.

    building permit fee: 25 plus 1 per 1000 of structure value USD · administrative subdivision application: 150 USD (Additional recording fees may be collected)

    “Development (Building) Permit Application Online | PDF | $25 plus $1 per $1,000 of the Structure Value”
  • Permit processPublished (with conditions)

    County building and land-alteration permit process.

    • Applications require applicant and parcel information, current use, applicable shoreland data, contractor information, construction details, and a site sketch.
    • A completed application must be signed by township officer(s), returned to the Planning and Zoning Director, and is processed within 10 days.
    • After approval, a zoning certificate is mailed for posting; construction deadlines are 6 months to begin and 1 year for substantial completion.

    application processing time: 10 days · construction commencement deadline: 6 months · substantial completion deadline: 1 year

    “A completed application, appropriately signed by the township officer(s), comes back to the Planning and Zoning Director for final action, and is processed within 10 days.”
    One more reviewed finding on this topic
    • Published (with conditions) — Clay County development-permit process in unincorporated areas.
      “Within 10 working days from the date of application submittal, the Zoning Administrator must either approve, deny, or refer to the appropriate County authority any application for Development Permit.”

Minnesota rules that apply here

  • Owner-builder exemptionAvailable (with conditions)

    An owner of residential real estate who personally builds or improves residential real estate, as an exemption from the residential contractor licensing requirement.

    • The owner must occupy or intend to occupy the residential real estate for residential purposes, or retain ownership for rental purposes after completion.
    • The exemption does not apply when the owner constructs or improves residential real estate for resale or speculation.
    • An owner is presumed to be building or improving for speculation if the owner constructs or improves more than one property within any 24-month period, unless the properties will be retained for rental purposes.
    • This is a contractor-licensing exemption and does not waive applicable building permits, inspections, or certificates of occupancy.

    speculation presumption threshold: > 1 additional property within 24 months (The presumption does not apply if the properties will be retained by the owner for rental purposes.)

    “The license requirement does not apply to: [...] an owner of residential real estate who builds or improves residential real estate”
  • Building code adoptedAdopted (with conditions)

    Construction, reconstruction, alteration, repair, and use of buildings and other structures of the type governed by the Minnesota State Building Code throughout Minnesota.

    • The State Building Code supersedes the building code of any municipality.
    • The State Building Code does not apply to agricultural buildings except for the state inspections and rulemaking identified in Minnesota Statutes section 326B.121, subdivision 1, paragraph (c), clause (1), and the structural-support requirement for translucent panels or other skylights without raised curbs in clause (2).
    • The 2020 Minnesota State Building Code is effective March 31, 2020, except the Minnesota Mechanical Fuel Gas Code, which is effective April 6, 2020.
    • Municipal enforcement generally requires adoption by local ordinance, subject to statutory requirements for certain municipalities and statutory enforcement responsibilities where no adoption ordinance is in effect.
    • The 2024 Minnesota Commercial Energy Code is effective January 5, 2024.
    • Requirements for adult changing stations are effective August 15, 2025, and requirements for window-cleaning safety features are effective November 7, 2025, according to the Department of Labor and Industry update page.

    2020 Minnesota State Building Code effective date: 2020-03-31 (Minnesota Mechanical Fuel Gas Code effective 2020-04-06) · 2024 Minnesota Commercial Energy Code effective date: 2024-01-05 · Adult changing station supplement effective date: 2025-08-15 · Window-cleaning safety feature supplement effective date: 2025-11-07

    “(a) The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, and use of buildings and other structures of the type governed by the code.”
    One more reviewed finding on this topic
    • Adopted (with conditions) — The Minnesota State Building Code as the statewide construction standard for buildings, including buildings in Clay County.
      “The Minnesota State Building Code is the minimum construction standard throughout all of Minnesota including all cities, townships and counties. Although it isn't enforceable by municipalities unless it is adopted by local ordinance, the State Building Code creates a level playing field for the construction industry by establishing the construction standard for all buildings in the state.”
  • Certificate of occupancyLimited

    Use or occupancy of buildings and structures, and changes in existing occupancy classification, in Minnesota jurisdictions administering and enforcing the State Building Code.

    • A building or structure may not be used or occupied, and an existing occupancy classification may not be changed, until the building official issues a certificate of occupancy under Minnesota Rules part 1300.0220.
    • The rule applies through the building official and therefore depends on the relevant jurisdiction administering and enforcing the State Building Code.
    • Issuance of a certificate of occupancy is not approval of a violation of the code or other municipal ordinances; a certificate purporting to authorize violation or cancellation of those requirements is invalid.
    • A municipality has the option of requiring certificates of occupancy for U occupancies constructed under the International Building Code, accessory structures constructed under the International Residential Code, and used manufactured homes moved into or within a jurisdiction.
    • Legal occupancy of a structure existing on the date of code adoption may continue without change.
    • A temporary certificate may be issued before all permitted work is complete if the occupied portion can be occupied safely; the building official sets its validity period.

    optional certificate category: U occupancies constructed under the International Building Code (municipality has the option of requiring a certificate) · optional certificate category: accessory structures constructed under the International Residential Code (municipality has the option of requiring a certificate) · optional certificate category: used manufactured homes moved into or within a jurisdiction (municipality has the option of requiring a certificate)

    “No building or structure shall be used or occupied, and no change in the existing occupancy classification of a building, structure, or portion of a building or structure shall be made until the building official has issued a certificate of occupancy for the building or structure under this part.”
  • Camping on your landLimited

    Private or public areas accommodating five or more tents or recreational camping vehicles on a daily, nightly, weekly, or longer basis

    • An annual license from the Minnesota Department of Health is required before establishing, maintaining, conducting, or operating a recreational camping area.
    • The license requires application, payment of the statutory fee, and approval for operation including plan review.
    • A recreational camping area excludes children's camps, industrial camps, migrant labor camps, United States Forest Service camps, state forest service camps, qualifying state wildlife-management or state-owned public-access areas, qualifying temporary holding areas adjacent to motorsports facilities, and a privately owned area used by a private club no more than once annually and no longer than seven consecutive days.
    • A special event recreational camping area operates no more than two times annually and for no more than 14 consecutive days.
    • The statute does not resolve local zoning or land-use requirements.

    minimum accommodated tents or recreational camping vehicles: >= 5 units (Statutory exclusions apply.) · special event operating frequency: <= 2 times annually (Special event recreational camping area.) · special event duration: <= 14 consecutive days (Special event recreational camping area.) · annual license base fee for recreational camping area with 24 or fewer sites: 100 USD (Additional $8 per licensed site; special event areas are excluded from that per-site paragraph.) · annual license base fee for recreational camping area with 25 to 99 sites: 410 USD (Additional $8 per licensed site; special event areas are excluded from that per-site paragraph.) · annual license base fee for recreational camping area with 100 or more sites: 610 USD (Additional $8 per licensed site; special event areas are excluded from that per-site paragraph.)

    “"Recreational camping area" means any area, whether privately or publicly owned, used on a daily, nightly, weekly, or longer basis for the accommodation of five or more tents or recreational camping vehicles free of charge or for compensation. [...] "Special event recreational camping area" means a recreational camping area which operates no more than two times annually and for no more than 14 consecutive days. [...] No person, firm or corporation shall establish, maintain, conduct or operate a manufactured home park or recreational camping area within this state without first obtaining an annual license from the state Department of Health.”
  • Tiny homesLimited

    Construction and residential use of tiny houses statewide, subject to the Minnesota State Building Code and applicable municipal zoning ordinances.

    • The Minnesota State Building Code applies statewide to construction of buildings, including tiny houses.
    • Municipal zoning ordinances vary by municipality and regulate land use, location, height, width, foundation type, number of stories, and building size.
    • The jurisdiction must be consulted for local zoning specifics.
    • Tiny houses used as dwelling units must comply with the Minnesota Residential Code unless otherwise stated in Appendix Q.
    • A tiny house is a dwelling of 400 square feet or less in floor area, excluding lofts.
    • Applicable requirements include light, ventilation, heating, minimum room sizes, ceiling heights, sanitation, toilet, bath and shower spaces, emergency escape and rescue openings, means of egress, smoke alarms, and carbon monoxide alarms.

    maximum tiny-house floor area: <= 400 square feet (lofts excluded) · minimum habitable-space and hallway ceiling height: >= 6.67 feet (6 feet 8 inches) · minimum bathroom, toilet-room, and kitchen ceiling height: >= 6.33 feet (6 feet 4 inches)

    “The Minnesota State Building Code is the standard of construction that applies statewide for the construction of buildings (MS 326B.121) including tiny houses.”
  • Manufactured homesLimited

    New manufactured homes installed for occupancy statewide in Minnesota

    • Inspection is required under Federal Installation Standards Programs, CFR 3285 and 3286.
    • Manufactured-home alterations require documentation submitted for review to the Department of Labor and Industry or the local authority having jurisdiction before work begins.
    • Local building officials and local code enforcement may apply depending on the municipality.
    “All new manufactured homes installed in Minnesota for occupancy are required to be inspected according to the Federal Installation Standards Programs, Code of Federal Regulations (CFR) 3285 and 3286.”
  • Off-grid sanitationLimited

    Primitive dwellings using toilet-waste treatment devices in low dwelling-density areas, and privies governed by Minnesota SSTS rules.

    • Septage disposal by the owner must follow local ordinances.
    • If no local ordinance exists, septage must not be discharged to surface waters, drainageways, steeply sloping areas, or wet areas in a manner or volume harmful to the environment or public health or that creates a nuisance.
    • Material must be buried or covered with soil.
    • If site conditions do not meet the rule, solids disposal must be performed under the applicable rule by a licensed maintenance business.
    • Privy solids must be removed when the privy is filled to one-half capacity.
    • Abandoned pits must have sewage solids and contaminated soil removed and be filled with clean earth and slightly mounded.

    privy solids removal threshold: 50 percent capacity

    “For primitive dwellings using toilet waste treatment devices in low dwelling density areas, septage disposal from these devices by the owner must be in accordance with local ordinances. If no ordinance exists, the septage must not be discharged to surface waters, drainageways, steeply sloping areas, or wet areas in a manner or volume that is harmful to the environment or public health or that creates a nuisance. The material must be buried or covered with soil.”
  • Well permitLimited

    Construction of water-supply, dewatering, and environmental wells in Minnesota.

    • A well notification and applicable filing fee are generally required before construction; the statute describes notification rather than a general construction-permit requirement for these wells.
    • A drive-point water-supply well personally constructed by an individual on owned or leased property for farming, agricultural purposes, or the individual's place of abode must be reported within ten days after completion, and no notification fee may be charged.
    • The notification requirement preempts local permits and notifications unless the commissioner has delegated permitting or notification authority under section 103I.111.
    • If operation of the well requires a Minnesota Department of Natural Resources appropriation permit, specified information must be submitted to the commissioner of natural resources and construction may begin after preliminary approval.
    • A well that is not in use must be sealed or have a maintenance permit, subject to the statutory environmental/dewatering-well exception.

    drive-point well notification deadline: 10 days after completion (personally constructed by an individual on owned or leased property for farming, agricultural purposes, or the individual's place of abode) · unused well status: sealed or maintenance permit (environmental or dewatering wells not sealed by 14 months after completion require an annually renewed maintenance permit)

    “Except as provided in paragraph (d), a person may not construct a water-supply, dewatering, or environmental well until a notification of the proposed well on a form prescribed by the commissioner is filed with the commissioner with the filing fee in section 103I.208, and, when applicable, the person has met the requirements of paragraph (e).”
  • Agricultural exemptionAvailable (with conditions)

    Agricultural buildings statewide that meet the definition in Minnesota Statutes § 326B.103, subdivision 3.

    • The structure must be on agricultural land as determined by the governing assessor for the municipality or county under section 273.13, subdivision 23.
    • The structure must be designed, constructed, and used to house farm implements, livestock, or agricultural products under section 273.13, subdivision 23.
    • The building must be used by the owner, lessee, and sublessee and members of their immediate families, employees, and persons engaged in pickup or delivery of agricultural products.
    • The State Building Code does not apply except with respect to state inspections required or rulemaking authorized by sections 103F.141, 216C.19, subdivision 9, and 326B.36.
    • Translucent panels or other skylights without raised curbs must be supported to have equivalent load-bearing capacity as the surrounding roof.
    “The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, and use of buildings and other structures of the type governed by the code. [...] (c) The State Building Code does not apply to agricultural buildings except: (1) with respect to state inspections required or rulemaking authorized by sections 103F.141; 216C.19, subdivision 9; and 326B.36; and (2) translucent panels or other skylights without raised curbs shall be supported to have equivalent load-bearing capacity as the surrounding roof.”
  • county zoning authorityLimited

    County planning and zoning authority over unincorporated areas of Minnesota.

    • The authority applies to a county having less than 300,000 population according to the 1950 federal census.
    • The statute authorizes county planning and zoning activities generally within the qualifying counties; it does not identify a separate unincorporated-area limitation in this section.
    • Except as otherwise provided, a county regardless of population must not enact, amend, or enforce an ordinance eliminating or terminating a lawful use by amortization.
    • The amortization prohibition does not apply to adults-only bookstores, adults-only theaters, or similar adults-only businesses as defined by ordinance.
    • The amortization subdivision does not prohibit nuisance-prevention or nuisance-abatement enforcement or elimination of a use determined to be a public nuisance without payment of compensation.

    population threshold: < 300000 persons (According to the 1950 federal census)

    “having less than 300,000 population according to the 1950 federal census is authorized to carry on county planning and zoning activities.”
  • county building authorityGeneral

    Minnesota counties may administer and enforce the State Building Code within their jurisdiction by ordinance; this includes a county's authority over residential construction in unincorporated county territory, subject to the statutory limits on code application and local provisions.

    • The statutory authorization is to administer and enforce the State Building Code, rather than a county-specific building code.
    • A county that is not already required by Minnesota Statutes § 326B.121, subdivision 2(a), to administer and enforce the code may elect to do so by ordinance.
    • The State Building Code applies statewide to construction, reconstruction, alteration, repair, and use of buildings and structures governed by the code.
    • The State Building Code does not apply to agricultural buildings except for state inspections or rulemaking authorized by Minnesota Statutes §§ 103F.141, 216C.19, subdivision 9, and 326B.36, and except that translucent panels or other skylights without raised curbs must have equivalent load-bearing capacity as the surrounding roof.
    • A municipality may not require building-code provisions regulating structural components or systems that differ from the State Building Code; with state building official approval, it may adopt a more restrictive ordinance where geological conditions warrant it.
    • A municipality may enforce the State Building Code through lawful means, including contracts with other municipalities or qualified individuals; building-permit fees may be retained or remitted to reimburse them.
    “If a municipality is not required by paragraph (a) to administer and enforce the State Building Code, the municipality may choose to administer and enforce the State Building Code within its jurisdiction by adopting the code by ordinance.”

Set by your town or city, not the county

In Minnesota, zoning is adopted by each town or city, so Clay County has no county-wide answer on these. Find your town or city in the list of places on this page, or call its clerk or zoning administrator.

  • Minimum dwelling size
  • Building height
  • Short-term rentals

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • Mandatory utility hookup — Water and sewer connection requirements.

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Clay County, Minnesota

Is Clay County a good place to live off-grid or homestead?

Clay County scores 47/100 on the Bolthole Index, a solid county profile. Its strengths: manageable long-term carry cost and a stronger property-autonomy legal backdrop. Watch-outs: workable self-sufficiency basics (25″/yr rainfall).

Do you need a building permit in Clay County, Minnesota?

Clay County generally requires a residential building permit, and it enforces county zoning. Onsite septic is permitted by Clay County Environmental Health (SSTS program under Minnesota Pollution Control Agency). Owner-builders may act as their own contractor to build their home. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

Can you live in an RV or tiny home on your land in Clay County?

Living in an RV on your own land in Clay County is limited to specific cases: Recreational vehicles on individual lots of record and in existing recreational-vehicle parks or campgrounds. Current highway-use licensing is required. No more than two recreational vehicles are permitted on an individual lot of record. A tiny home is limited to specific cases. Confirm with the county before relying on it.

How much does land cost in Clay County, Minnesota?

Land in Clay County runs about $4,738 per acre, based on the latest county data.

What is the water situation in Clay County?

Clay County gets about 25" of rain a year, with severe drought in roughly 5% of years.

How remote is Clay County?

A representative private-land location has about 96,762 people within a 30-minute drive and 635,899 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

How Clay compares in Minnesota

Compare side-by-side →See all 87 Minnesota counties ranked →