Bolthole Index

Faribault County, Minnesota

Building permits, zoning and land rules in Faribault County, Minnesota

53Index Score / 100
#60 of 87 in Minnesota

Unincorporated Faribault County, Minnesota requires a building permit for new buildings, additions and other listed construction work.1 Faribault County Planning & Zoning issues building permits and applies county zoning outside city limits.23 Septic goes through the county program unless a city or township runs a conforming one, and every building application needs a septic Certificate of Compliance.45

At a glance

Building permit
Required for new buildings and structural additions6
Zoning
County zoning applies outside incorporated cities; Winnebago and Wells zone themselves378
Septic
County SSTS program; building applications need septic compliance documentation910
RV living
Long-term occupancy on private land is not confirmed; ask Planning & Zoning2
Tiny home
Occupancy and minimum dwelling size are not confirmed; ask Planning & Zoning2
Owner-builder
A licensing exemption may apply, but permits and inspections are not waived11
Driveway access
Land divisions need road-authority approval for new or changed access12
Parcel splits
$150 to split one parcel into two, plus $50 per parcel for 3 or more13

Who to call

Planning & zoning

Faribault County Planning & Zoning

Building permits, county zoning, conditional uses and variances

507-526-2388

415 S Grove Street Suite 8, Blue Earth Ag Center Blue Earth, MN 56013

Online permits →

Septic permits

Faribault County Septic Systems

SSTS compliance, building-permit septic documentation and land-split septic review

507-526-2388

415 S Grove Street Suite 8, Blue Earth Ag Center Blue Earth, MN 56013

Roads & driveways

Faribault County Public Works

Permits for driveways and other work in county road rights-of-way

507-526-3291

727 E 5th Street Blue Earth, MN 56013

Online permits →

Contact details are copied from each office’s official page and were checked against it on October 13, 2026.

Off-grid gear

Going off-grid in Faribault County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Faribault County, Minnesota?

Unincorporated Faribault County requires a building permit to construct a building or alter a building’s height or area; the county also lists building movement as permit work.6 Examples include dwellings, detached garages, grain bins, additions and accessory structures.6 The county lists buildings over 150 square feet and separately includes accessory buildings below 150 square feet, so size alone does not establish an exemption.6 Nonstructural reroofing, residing, window replacement and interior remodeling do not need this county building permit.6

Faribault County building-permit fees depend on the project and are collected when the permit is obtained; the county publishes no flat fee.14 Inside city limits the city's own rules apply: Winnebago issues its own building and use permits through its Building Official.15 The Minnesota State Building Code applies statewide to buildings governed by the code, while local enforcement depends on adoption and administration arrangements.16 Qualifying agricultural buildings are exempt from most State Building Code provisions, subject to statutory inspection and roof-panel exceptions; county permit requirements still list grain bins and accessory structures.176 Ask Planning & Zoning to distinguish the county building permit from construction-code review for the proposed farm building.2

Who handles Faribault County building permits, and how do you reach them?

Faribault County Planning & Zoning is the first office for county building permits, zoning questions, conditional uses and variances.2 The office is at the Blue Earth Ag Center and can be reached at the phone number listed above.2 Authorized Planning & Zoning personnel must approve applications, and payment and applicable permit conditions must be resolved before construction begins.18 Applicants without a Certificate of Compliance and Pumping Form, or those unsure about setbacks or lot size, should make an appointment.18

The State Building Code is the minimum construction standard statewide, but it is not enforceable by a municipality unless adopted by local ordinance, so enforcement varies by place.19 We could not confirm Faribault County's building-inspection authority or inspection schedule. Ask Planning & Zoning who will inspect the work before choosing a contractor or construction timetable.2 Work covered by a Minnesota State Building Code permit must remain accessible and exposed until the required inspection is approved.20

Does Faribault County have zoning?

The Faribault County Zoning Ordinance applies to all land outside the incorporated limits of municipalities and regulates structures and land uses through zoning districts.32 Like the counties around it in Minnesota, Faribault County has county zoning21.

Inside city limits the city decides. Winnebago adopts its own zoning ordinance7, and Wells divides its land into zoning districts under its own zoning code8. Septic stays with the county program unless a city or township administers a conforming SSTS ordinance; Wells issues its own private wastewater permits.922

For an unincorporated parcel, ask Planning & Zoning to confirm the district, allowed use, setbacks and minimum lot size before relying on a listing description.2 County building permits must meet setback and minimum lot-size requirements, but we could not confirm the numeric dimensions for a particular district.2324 Residential parcel splits must support Type I primary and secondary septic sites, and existing sites need a valid Certificate of Compliance.2526 Splits of bare agricultural land are exempt from MPCA Rules 7080/7081, but not from the county's other land-division requirements.27

How do septic permits work in Faribault County?

Faribault County administers its SSTS program except where a city or township operates a conforming local ordinance.9 County septic systems must comply with the Faribault County Zoning Ordinance and Minnesota Pollution Control Agency rules.28 Every county building-permit application must include a Certificate of Compliance and proof that the septic system was maintained, pumped or measured within the previous 3 years.5 Minnesota requires compliance inspections for new or replacement septic systems; the county building-application rule does not establish an inspection requirement for every property sale.295

Minnesota counties, cities and townships issue construction permits for most SSTS, while systems designed above 10,000 gallons per day require an MPCA permit.30 Only about 7.4% of county soils are rated without severe limits for a conventional septic drain field, so arrange a site-specific evaluation early.31 We could not confirm the county’s specific septic construction-permit procedure; ask the county septic office which design, permit and compliance review applies before fixing the house site.28

Can you live in an RV or tiny home in Faribault County?

We could not confirm whether unincorporated Faribault County allows long-term RV occupancy on an individual private parcel.2 Ask Planning & Zoning whether the parcel's district allows the proposed occupancy, what septic arrangement is acceptable and whether temporary-use approval is needed.2

Tiny-home occupancy and a county minimum dwelling size are also unconfirmed; ask Planning & Zoning about the proposed dwelling.2 Tiny houses used as dwellings must meet Minnesota residential-code requirements, while local zoning controls whether the use is allowed on the property.32 Faribault County requires permits for new dwellings and accessory structures, with applicable setbacks and minimum lot size.63334

What are the steps to build a home in Faribault County?

  1. Confirm whether the parcel is outside city limits, then ask Faribault County Planning & Zoning for the zoning district, allowed residential use, setbacks and minimum lot size.353334
  2. Have the septic site evaluated and obtain the Certificate of Compliance and maintenance documentation required for the building application.10
  3. Confirm road access with the responsible road authority because new access or a change of use tied to a county land division requires approval.12
  4. Submit the building-permit application to Planning & Zoning and pay the project-based fee before construction starts.1814
  5. Ask which building official will inspect the work, keep permitted work exposed until inspection approval, and obtain the required certificate of occupancy before using a code-governed building.2036
  6. If building personally, confirm the Minnesota owner-builder licensing exemption; the exemption does not waive permits, inspections or occupancy approval.11

What should you check before buying land in Faribault County?

Before buying unincorporated Faribault County land, ask Planning & Zoning to review a sketch showing the house, setbacks, septic areas, road access and any mapped floodplain.23334 Minnesota floodplain rules require approval for houses, fill, culverts and bridges; a mapped floodway generally cannot accommodate a dwelling or enclosed structure.3738

For a parcel split, resolve the county’s survey, tax, zoning, septic and access requirements before the qualifying conveyance is filed.3940 The nonrefundable split fee is $150 for one parcel into two, plus $50 per parcel for 3 or more parcels, and taxes must be paid in full first.13 Public Works handles county-road right-of-way permits, while direct state-highway driveways require MnDOT approval.4142

Minnesota generally requires a well-construction notification and filing fee before a water-supply well is built, with limited exceptions; ask the state well authority about the filing and any delegated local administration.43

Watch-outs

  • A county building permit does not settle every construction-code question; ask Planning & Zoning who provides building-code review and inspections for the parcel.220
  • A Certificate of Compliance and proof of septic maintenance, pumping or measurement within the previous 3 years are required with every building-permit application.5
  • New access or a change of use associated with a land division requires road-authority approval, and Public Works handles county-road right-of-way permits.1241

Sources

  1. Permits, quoted and re-checked
  2. Faribault County Planning & Zoning (faribaultcountymn.gov)
  3. Permits | Faribault County, MN, quoted and re-checked
  4. Local septic system programs, quoted and re-checked
  5. Permits | Faribault County, MN, quoted and re-checked
  6. Permits | Faribault County, MN, quoted and re-checked
  7. Winnebago: official source (Faribault County), quoted and re-checked
  8. Wells: Chapter 152: Zoning Code (Faribault County), quoted and re-checked
  9. Faribault County Local Water Management Plan 2018-2027, quoted and re-checked
  10. Permits | Faribault County, MN, quoted and re-checked
  11. revisor.mn.gov (Minnesota statewide rule), quoted and re-checked
  12. faribaultcountymn.gov, quoted and re-checked
  13. Administrative Split/Combine Information & Form, quoted and re-checked
  14. Permits, quoted and re-checked
  15. Winnebago: § 152.132 Building and use permits (Faribault County), quoted and re-checked
  16. 2025 Minnesota Statutes, section 326B.121, quoted and re-checked
  17. Minnesota Statutes § 326B.121, State Building Code; application and enforcement (Minnesota statewide rule), quoted and re-checked
  18. Permits | Faribault County, MN, quoted and re-checked
  19. Overview of the Minnesota State Building Code, quoted and re-checked
  20. 1300.0210 INSPECTIONS (Minnesota statewide rule), quoted and re-checked
  21. Permits | Faribault County, MN (2026 county census)
  22. Wells: § 50.18 Private Wastewater Disposal (Faribault County), quoted and re-checked
  23. Permits, quoted and re-checked
  24. Permits, quoted and re-checked
  25. Administrative Split/Combine Information & Form, quoted and re-checked
  26. Permits, quoted and re-checked
  27. Administrative Split/Combine Information & Form, quoted and re-checked
  28. Faribault County Septic Systems (faribaultcountymn.gov)
  29. 2025 Minnesota Statutes, section 115.55: Subsurface Sewage Treatment Systems (Minnesota statewide rule), quoted and re-checked
  30. SSTS design (Minnesota statewide rule), quoted and re-checked
  31. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  32. Tiny Houses and the 2020 Minnesota Residential Code (Minnesota statewide rule), quoted and re-checked
  33. Permits | Faribault County, MN, quoted and re-checked
  34. Permits | Faribault County, MN, quoted and re-checked
  35. Administrative Split/Combine Information & Form, quoted and re-checked
  36. Minnesota Rules part 1300.0220, Certificate of Occupancy, quoted and re-checked
  37. Floodplain Regulations (Minnesota statewide rule), quoted and re-checked
  38. Floodplain Regulations (Minnesota statewide rule), quoted and re-checked
  39. Administrative Split/Combine Information & Form, quoted and re-checked
  40. faribaultcountymn.gov, quoted and re-checked
  41. Faribault County Public Works (faribaultcountymn.gov)
  42. MnDOT Access Management Manual, Chapter 4 (Minnesota statewide rule), quoted and re-checked
  43. 2025 Minnesota Statutes, section 103I.205: Well Construction (Minnesota statewide rule), quoted and re-checked

Written October 13, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

Compared with neighboring counties

Like all 6 of its neighbors, Faribault County has countywide zoning.

RuleFaribault CountyBlue Earth CountyFreeborn CountyWaseca CountyMartin CountyWatonwan CountySteele County
Building permitRequiredLimitedRequiredLimitedRequiredRequiredRequired
County zoningYesYesYesYesYesYesYes
Septic permitsCounty Planning & ZoningCounty Property & Env. Resources Dept.County Env. ServicesCounty Planning & Zoning Dept.County Planning & ZoningCounty Land Management Dept.County Env. Services

County locator

Faribault County in Minnesota

53
County map
Faribault County highlighted among the Minnesota counties · colored by Index score

How Faribault County scores

Seclusion58100% ev.
Self-Sufficiency29100% ev.
Admin Boringness43100% ev.
Durability56100% ev.
Property Autonomy65100% ev.
Carry Cost63100% ev.

Evidence strength: 100%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$165kTypical home
1.1%Property tax
$8,169Land / acre
33.6"Annual rain
10.8% of yrsSevere drought
2.2 / yr (+2.1)Mid-century 100°F days
16.7 daysMid-century dry spell
1.99" (+13.8%)Mid-century 1-day rain
1.74×Wildfire change factor
100%Forward climate coverage
$1,838Home insurance / yr
5.5% / yrInsurance growth
1.5%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
12,703People within 30 min
1,653,812People within 2 hr
13,311Radius comparison (15 mi)
19.5People / sq mi
0.3%Federal land
99.8%Land at 15% slope or less
7.4%Soils rated "not limited" for septic (strict USDA rating)
32,633 acWorkable land screen
2.8%Wooded land
44.1 tonsBiomass / forest ac
45.5°FAvg temp

Scout Faribault County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Faribault County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Faribault County

Inside a city, town or township here, that government usually sets zoning and may issue its own building permits; the county’s rules above cover land outside them.

Not yet researched: Barber Township · Blue Earth · Blue Earth City Township · Bricelyn · Brush Creek Township · Clark Township · Delavan · Delavan Township · Dunbar Township · Easton · Elmore · Elmore Township · Emerald Township · Foster Township · Frost · Jo Daviess Township · Kiester Township · Lura Township · Minnesota Lake · Minnesota Lake Township · Pilot Grove Township · Prescott Township · Rome Township · Seely Township · Verona Township · Walnut Lake Township · Walters · Winnebago City Township

Answers from the rulebook for Faribault County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Faribault County rules

  • Building permitRequired

    Construction, alteration, and movement of buildings handled through Faribault County Planning and Zoning.

    • Permits are needed for new construction, including dwellings, detached garages, structures over 150 square feet, grain bins, and other structures.
    • Permits are needed for expansions or additions, accessory structures, and construction, alteration, or movement of buildings.
    • Non-structural reshingling, residing, window replacement, and internal remodeling do not need a building permit.
    • Fees are determined by the project and collected when the permit is obtained.

    building size threshold listed for new construction: > 150 square feet (The page separately lists an accessory structure building under 150 square feet.)

    “A building permit is required to construct or alter, in respect to height or area, any building.”
    One more reviewed finding on this topic
    • Required — Construction, alteration, and movement of buildings subject to Faribault County Planning and Zoning review.
      “A building permit is required to construct or alter, in respect to height or area, any building.”
  • County-wide zoningPresent (with conditions)

    County zoning requirements for building permits in Faribault County, particularly areas outside incorporated city limits.

    • All building permits must meet setback and minimum lot size requirements.
    • All applications must submit a Certificate of Compliance before approval.
    • The source states that all applications must provide proof that the system was maintained, pumped, or measured within the last 3 years.
    “The jurisdiction of this ordinance shall apply to all the area of Faribault County outside the incorporated limits of municipalities.”
    2 more reviewed findings on this topic
  • Minimum lot sizeSpecified

    Building permits and residential land divisions subject to Faribault County zoning outside city limits.

    • The opened source does not provide the numeric minimum lot-size dimensions.
    • The county zoning ordinance applies outside city limits according to the land-division form.
    “All building permits must meet setback and minimum lot size requirements.”
    One more reviewed finding on this topic
    • Specified — Building permits subject to Faribault County zoning requirements.
      “All building permits must meet setback and minimum lot size requirements.”
  • SetbacksSpecified

    Building permits subject to Faribault County Planning and Zoning.

    • The opened official source does not provide numeric setback distances.
    “All building permits must meet setback and minimum lot size requirements.”
    One more reviewed finding on this topic
    • Specified — Building permits subject to Faribault County zoning requirements.
      “All building permits must meet setback and minimum lot size requirements.”
  • Who permits septicCounty (with conditions)

    Subsurface sewage treatment systems in Faribault County outside any city or township with a stricter qualifying local program.

    • Minnesota counties must administer SSTS programs complying with state rules.
    • Cities and townships may regulate septic systems if their ordinance is at least as stringent as the county ordinance.
    • MPCA rules remain the statewide minimum framework.
    “Minnesota counties are required to adopt SSTS ordinances and administer SSTS programs that comply with state rules.”
    One more reviewed finding on this topic
    • County (with conditions) — Faribault County's local subsurface sewage treatment system program and ordinance.
      “All counties must adopt and implement SSTS ordinances in compliance with chapters 7080 and 7081 that also comply with this chapter. Ordinances must apply to all land area within the county, except in towns and cities that have adopted ordinances that are in conformance with the county ordinance and this chapter. All counties with SSTS ordinances must permit and inspect SSTS within cities and townships that do not administer an SSTS ordinance that complies with these rules.”
  • Septic inspectionLimited

    Existing sewage-treatment systems associated with Faribault County building applications and land divisions.

    • A Certificate of Compliance is required with building-permit applications.
    • The certificate must include proof that the system was maintained, pumped, or measured within the last 3 years.
    • Existing sites in an administrative split must provide a valid Certificate of Compliance and a Type I secondary system.
    • This claim does not establish a universal inspection requirement for every property.

    maintenance/ pumping or measurement recency: <= 3 years

    “All building permits must meet setback and minimum lot size requirements. In addition, all applications must submit a Certificate of Compliance before the application can be approved. This includes proof that the system has been maintained (pumped or measured) within the last 3 years.”
    2 more reviewed findings on this topic
    • Limited — Building-permit applications in Faribault County that involve an existing sewage treatment system.
      “all applications must submit a Certificate of Compliance before the application can be approved.”
    • Required — SSTS-related compliance documentation for building permit applications in Faribault County.
      “A compliance inspection for all new construction or replacement must be conducted:”
  • Agricultural exemptionConditional

    Splits for bare agricultural land under Faribault County administrative land-division review.

    • The source specifically states the exemption applies to splits for bare agricultural land.
    • Other land-division and conveyance requirements remain applicable.
    “Splits for bare agricultural land are exempt from MPCA Rules 7080/7081.”
    2 more reviewed findings on this topic
  • Subdividing landRegulated (with conditions)

    Land divisions, parcel splits, and conveyances requiring Faribault County administrative split/combine review.

    • No conveyance may be made unless parcel and survey requirements are met.
    • A non-refundable $150 fee applies to splitting one parcel into two parcels.
    • There is an additional $50 fee per parcel for 3 or more parcels.
    • Current and delinquent taxes must be paid in full.
    • Parcels must be contiguous and lie within the same section/township/range.
    • Planning & Zoning review under the County Zoning Ordinance is expressly outside city limits.
    • Residential buildable splits must satisfy MPCA Rules 7080/7081 and septic-system requirements.
    • Bare agricultural land splits are exempt from MPCA Rules 7080/7081.
    • The checklist does not itself grant permission to construct structures or record deeds.

    split fee for one parcel into two: 150 USD (Non-refundable) · additional fee for 3 or more parcels: 50 USD per parcel

    “The above requirements shall be met prior to a conveyance document being filed with the Faribault County Recorder’s Office which causes the legal primary ownership of the described property to be changed, and the property described to be split or subdivided from a larger pre-existing parcel.”
    2 more reviewed findings on this topic
    • Regulated (with conditions) — Administrative parcel splits, combines, and subdivisions in Faribault County.
      “The above requirements shall be met prior to a conveyance document being filed with the Faribault County Recorder’s Office which causes the legal primary ownership of the described property to be changed, and the property described to be split or subdivided from a larger pre-existing parcel.”
    • Regulated (with conditions) — Parcel splits and subdivisions outside city limits.
      “the property described to be split or subdivided from a larger pre-existing parcel.”
  • Driveway accessRequired

    New or changed road access associated with a Faribault County land division.

    • The checklist distinguishes existing access, change of use, and new access.
    • New access requires approval from the road authority.
    “New Access* *Requires approval from Road Authority”
    2 more reviewed findings on this topic
    • Limited — New or changed access associated with Faribault County land divisions.
      “Existing Access Change of Use* New Access* *Requires approval from Road Authority”
    • Limited — New or changed road access associated with Faribault County land divisions.
      “Existing Access Change of Use* New Access* *Requires approval from Road Authority”
  • Permit feesVariable (with conditions)

    Faribault County building permits and land-division approvals.

    • Building-permit fees are determined by the project and collected when the permit is obtained.
    • The administrative split/combine form publishes a $150 fee for splitting one parcel into two and an additional $50 per parcel for three or more parcels.

    building permit fee: determined by project · administrative split fee: 150 USD (Non-refundable; one parcel into two parcels) · additional split fee: 50 USD per parcel (For 3 or more parcels)

    “Fees are determined by the project being completed”
    2 more reviewed findings on this topic
    • Variable — Faribault County building permits.
      “Fees are determined by the project being completed and are collected when a building permit is obtained.”
    • Variable (with conditions) — Faribault County building permits.
      “Fees are determined by the project being completed and are collected when a building permit is obtained.”
  • Permit processPartial

    Faribault County Planning and Zoning permit applications.

    • All applications must be approved by authorized Planning and Zoning personnel.
    • Payment and permit conditions must comply with applicable state regulations before construction begins.
    • Applicants may need an appointment if they do not have a Certificate of Compliance and Pumping Form or are unsure whether current setback and lot-size requirements are met.
    • A Certificate of Compliance and proof of system maintenance within the last 3 years are required before application approval.
    “All Applications must be approved by authorized personnel of the Planning and Zoning Department.”
    One more reviewed finding on this topic
    • Published (with conditions) — Faribault County Planning and Zoning permit applications.
      “All Applications must be approved by authorized personnel of the Planning and Zoning Department.”

Minnesota rules that apply here

  • Owner-builder exemptionAvailable (with conditions)

    An owner of residential real estate who personally builds or improves residential real estate, as an exemption from the residential contractor licensing requirement.

    • The owner must occupy or intend to occupy the residential real estate for residential purposes, or retain ownership for rental purposes after completion.
    • The exemption does not apply when the owner constructs or improves residential real estate for resale or speculation.
    • An owner is presumed to be building or improving for speculation if the owner constructs or improves more than one property within any 24-month period, unless the properties will be retained for rental purposes.
    • This is a contractor-licensing exemption and does not waive applicable building permits, inspections, or certificates of occupancy.

    speculation presumption threshold: > 1 additional property within 24 months (The presumption does not apply if the properties will be retained by the owner for rental purposes.)

    “The license requirement does not apply to: [...] an owner of residential real estate who builds or improves residential real estate”
  • Building code adoptedAdopted (with conditions)

    Construction, reconstruction, alteration, repair, and use of buildings and other structures of the type governed by the Minnesota State Building Code throughout Minnesota.

    • The State Building Code supersedes the building code of any municipality.
    • The State Building Code does not apply to agricultural buildings except for the state inspections and rulemaking identified in Minnesota Statutes section 326B.121, subdivision 1, paragraph (c), clause (1), and the structural-support requirement for translucent panels or other skylights without raised curbs in clause (2).
    • The 2020 Minnesota State Building Code is effective March 31, 2020, except the Minnesota Mechanical Fuel Gas Code, which is effective April 6, 2020.
    • Municipal enforcement generally requires adoption by local ordinance, subject to statutory requirements for certain municipalities and statutory enforcement responsibilities where no adoption ordinance is in effect.
    • The 2024 Minnesota Commercial Energy Code is effective January 5, 2024.
    • Requirements for adult changing stations are effective August 15, 2025, and requirements for window-cleaning safety features are effective November 7, 2025, according to the Department of Labor and Industry update page.

    2020 Minnesota State Building Code effective date: 2020-03-31 (Minnesota Mechanical Fuel Gas Code effective 2020-04-06) · 2024 Minnesota Commercial Energy Code effective date: 2024-01-05 · Adult changing station supplement effective date: 2025-08-15 · Window-cleaning safety feature supplement effective date: 2025-11-07

    “(a) The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, and use of buildings and other structures of the type governed by the code.”
    2 more reviewed findings on this topic
    • Partial — Minnesota State Building Code as the construction standard applicable in Faribault County.
      “The Minnesota State Building Code is the minimum construction standard throughout all of Minnesota including all cities, townships and counties. Although it isn't enforceable by municipalities unless it is adopted by local ordinance, the State Building Code creates a level playing field for the construction industry by establishing the construction standard for all buildings in the state.”
    • Adopted (with conditions) — Buildings and structures governed by the Minnesota State Building Code in Faribault County and statewide Minnesota.
      “The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, and use of buildings and other structures of the type governed by the code.”
  • InspectionsRequired

    Construction or work for which a Minnesota State Building Code permit is required.

    • The work must remain accessible and exposed until approved.
    • The permit applicant must cause the work to remain accessible and exposed for inspection.
    • The building official identifies required inspections; the permit holder must maintain the inspection record card until final approval.
    • Work may not proceed beyond each successive inspection point without building-official approval; noncomplying portions must be corrected and may not be covered or concealed until authorized.
    “Construction or work for which a permit is required is subject to inspection by the building official”
  • Certificate of occupancyLimited

    Use or occupancy of buildings and structures, and changes in existing occupancy classification, in Minnesota jurisdictions administering and enforcing the State Building Code.

    • A building or structure may not be used or occupied, and an existing occupancy classification may not be changed, until the building official issues a certificate of occupancy under Minnesota Rules part 1300.0220.
    • The rule applies through the building official and therefore depends on the relevant jurisdiction administering and enforcing the State Building Code.
    • Issuance of a certificate of occupancy is not approval of a violation of the code or other municipal ordinances; a certificate purporting to authorize violation or cancellation of those requirements is invalid.
    • A municipality has the option of requiring certificates of occupancy for U occupancies constructed under the International Building Code, accessory structures constructed under the International Residential Code, and used manufactured homes moved into or within a jurisdiction.
    • Legal occupancy of a structure existing on the date of code adoption may continue without change.
    • A temporary certificate may be issued before all permitted work is complete if the occupied portion can be occupied safely; the building official sets its validity period.

    optional certificate category: U occupancies constructed under the International Building Code (municipality has the option of requiring a certificate) · optional certificate category: accessory structures constructed under the International Residential Code (municipality has the option of requiring a certificate) · optional certificate category: used manufactured homes moved into or within a jurisdiction (municipality has the option of requiring a certificate)

    “No building or structure shall be used or occupied, and no change in the existing occupancy classification of a building, structure, or portion of a building or structure shall be made until the building official has issued a certificate of occupancy for the building or structure under this part.”
    One more reviewed finding on this topic
    • Required — Use or occupancy of buildings and structures governed by the Minnesota State Building Code in Faribault County.
      “No building or structure shall be used or occupied, and no change in the existing occupancy classification of a building, structure, or portion of a building or structure shall be made until the building official has issued a certificate of occupancy for the building or structure under this part.”
  • Zoning districtsPartial

    Minnesota DNR model floodplain ordinance district classifications, not every local zoning ordinance.

    • The model ordinance identifies floodway, flood fringe, and A Zones (general floodplain) as separate districts.
    • The model ordinance is a model resource; local adoption and local zoning maps determine applicability.
    • This claim does not establish that every Minnesota jurisdiction uses these districts.
    “This model includes the three primary types of floodplain districts: Floodway, Flood Fringe, and General Floodplain. As presented, it incorporates ordinance provisions for a community that has all three districts present on their Flood Insurance Rate Maps. Local communities are encouraged to work with DNR to tailor the language based on the flood districts present in the community.”
  • Camping on your landLimited

    Private or public areas accommodating five or more tents or recreational camping vehicles on a daily, nightly, weekly, or longer basis

    • An annual license from the Minnesota Department of Health is required before establishing, maintaining, conducting, or operating a recreational camping area.
    • The license requires application, payment of the statutory fee, and approval for operation including plan review.
    • A recreational camping area excludes children's camps, industrial camps, migrant labor camps, United States Forest Service camps, state forest service camps, qualifying state wildlife-management or state-owned public-access areas, qualifying temporary holding areas adjacent to motorsports facilities, and a privately owned area used by a private club no more than once annually and no longer than seven consecutive days.
    • A special event recreational camping area operates no more than two times annually and for no more than 14 consecutive days.
    • The statute does not resolve local zoning or land-use requirements.

    minimum accommodated tents or recreational camping vehicles: >= 5 units (Statutory exclusions apply.) · special event operating frequency: <= 2 times annually (Special event recreational camping area.) · special event duration: <= 14 consecutive days (Special event recreational camping area.) · annual license base fee for recreational camping area with 24 or fewer sites: 100 USD (Additional $8 per licensed site; special event areas are excluded from that per-site paragraph.) · annual license base fee for recreational camping area with 25 to 99 sites: 410 USD (Additional $8 per licensed site; special event areas are excluded from that per-site paragraph.) · annual license base fee for recreational camping area with 100 or more sites: 610 USD (Additional $8 per licensed site; special event areas are excluded from that per-site paragraph.)

    “"Recreational camping area" means any area, whether privately or publicly owned, used on a daily, nightly, weekly, or longer basis for the accommodation of five or more tents or recreational camping vehicles free of charge or for compensation. [...] "Special event recreational camping area" means a recreational camping area which operates no more than two times annually and for no more than 14 consecutive days. [...] No person, firm or corporation shall establish, maintain, conduct or operate a manufactured home park or recreational camping area within this state without first obtaining an annual license from the state Department of Health.”
  • Tiny homesLimited

    Construction and residential use of tiny houses statewide, subject to the Minnesota State Building Code and applicable municipal zoning ordinances.

    • The Minnesota State Building Code applies statewide to construction of buildings, including tiny houses.
    • Municipal zoning ordinances vary by municipality and regulate land use, location, height, width, foundation type, number of stories, and building size.
    • The jurisdiction must be consulted for local zoning specifics.
    • Tiny houses used as dwelling units must comply with the Minnesota Residential Code unless otherwise stated in Appendix Q.
    • A tiny house is a dwelling of 400 square feet or less in floor area, excluding lofts.
    • Applicable requirements include light, ventilation, heating, minimum room sizes, ceiling heights, sanitation, toilet, bath and shower spaces, emergency escape and rescue openings, means of egress, smoke alarms, and carbon monoxide alarms.

    maximum tiny-house floor area: <= 400 square feet (lofts excluded) · minimum habitable-space and hallway ceiling height: >= 6.67 feet (6 feet 8 inches) · minimum bathroom, toilet-room, and kitchen ceiling height: >= 6.33 feet (6 feet 4 inches)

    “The Minnesota State Building Code is the standard of construction that applies statewide for the construction of buildings (MS 326B.121) including tiny houses.”
  • Manufactured homesLimited

    New manufactured homes installed for occupancy statewide in Minnesota

    • Inspection is required under Federal Installation Standards Programs, CFR 3285 and 3286.
    • Manufactured-home alterations require documentation submitted for review to the Department of Labor and Industry or the local authority having jurisdiction before work begins.
    • Local building officials and local code enforcement may apply depending on the municipality.
    “All new manufactured homes installed in Minnesota for occupancy are required to be inspected according to the Federal Installation Standards Programs, Code of Federal Regulations (CFR) 3285 and 3286.”
  • Accessory dwellingsLimited

    Temporary family health care dwellings used as a narrow accessory residential dwelling category statewide, where the municipality has not opted out of Minnesota Statutes § 462.3593.

    • The dwelling must be primarily assembled away from its installation site, be no more than 300 gross square feet, lack a permanent foundation, meet state-recognized accessibility standards, provide water and electric utilities, use compatible exterior materials, have at least R-15 insulation, be transportable by the specified truck types, comply with Minnesota Rules chapter 1360 or 1361 with the required seal and data plate or ANSI Code 119.2, and have a backflow check valve.
    • A caregiver or relative must apply for a municipal temporary dwelling permit with the required signatures and documentation, including provider-network proof, medical certification, septic-service documentation, adjacent-owner notice affidavit, and a site map.
    • The dwelling must be on property where the caregiver or relative resides, comply with setbacks and applicable floor-area-ratio limits, and permit safe and timely access for septic services and emergency vehicles.
    • Occupancy is limited to one identified mentally or physically impaired person, and only one temporary family health care dwelling is allowed per lot.
    • The dwelling must comply with applicable state law, local ordinances, and charter provisions unless otherwise provided.
    • The initial permit lasts six months and may be renewed once for an additional six months.
    • The municipality may inspect, revoke the permit for violations, and require removal within 60 days after revocation.
    • Unless otherwise provided by ordinance, the municipality may charge up to $100 for the initial permit and up to $50 for renewal.
    • The municipality may opt out of the statutory requirements by ordinance.

    maximum dwelling area: <= 300 gross square feet · initial permit term: 6 months (renewable once for an additional six months) · maximum initial permit fee: <= 100 USD (unless otherwise provided by ordinance) · maximum renewal permit fee: <= 50 USD (unless otherwise provided by ordinance) · maximum occupants: 1 person (occupant must be a mentally or physically impaired person) · maximum dwellings per lot: 1 dwelling

    “A temporary family health care dwelling that meets the requirements of this section cannot be prohibited by a local ordinance that regulates accessory uses or recreational vehicle parking or storage.”
    One more reviewed finding on this topic
    • Limited — Accessory dwelling units statewide, including conversion of a structure into an ADU, subject to local zoning and Minnesota residential building-code requirements.
      “Local zoning ordinances dictate if a tiny home or accessory dwelling unit (ADU) is allowed on the property.”
  • Septic permitRequired

    Construction of most Minnesota SSTS, with construction permits issued by the applicable county, city, or township; large SSTS require MPCA permitting.

    • Local authority and local ordinance requirements vary.
    • Large SSTS designed for a flow greater than 10,000 gallons per day must be permitted by MPCA.
    • Local government units may adopt stricter requirements.

    large SSTS design flow: > 10000 gallons per day (Systems at or below this threshold are generally reviewed and permitted by counties, cities, or townships.)

    “Counties, cities, and townships review designs and issue construction permits for most SSTS in Minnesota, but large sub-surface sewage treatment systems (LSTS) — designed to manage a flow of greater than 10,000 gallons a day — must be permitted by the MPCA”
  • Off-grid sanitationLimited

    Primitive dwellings using toilet-waste treatment devices in low dwelling-density areas, and privies governed by Minnesota SSTS rules.

    • Septage disposal by the owner must follow local ordinances.
    • If no local ordinance exists, septage must not be discharged to surface waters, drainageways, steeply sloping areas, or wet areas in a manner or volume harmful to the environment or public health or that creates a nuisance.
    • Material must be buried or covered with soil.
    • If site conditions do not meet the rule, solids disposal must be performed under the applicable rule by a licensed maintenance business.
    • Privy solids must be removed when the privy is filled to one-half capacity.
    • Abandoned pits must have sewage solids and contaminated soil removed and be filled with clean earth and slightly mounded.

    privy solids removal threshold: 50 percent capacity

    “For primitive dwellings using toilet waste treatment devices in low dwelling density areas, septage disposal from these devices by the owner must be in accordance with local ordinances. If no ordinance exists, the septage must not be discharged to surface waters, drainageways, steeply sloping areas, or wet areas in a manner or volume that is harmful to the environment or public health or that creates a nuisance. The material must be buried or covered with soil.”
  • Well permitLimited

    Construction of water-supply, dewatering, and environmental wells in Minnesota.

    • A well notification and applicable filing fee are generally required before construction; the statute describes notification rather than a general construction-permit requirement for these wells.
    • A drive-point water-supply well personally constructed by an individual on owned or leased property for farming, agricultural purposes, or the individual's place of abode must be reported within ten days after completion, and no notification fee may be charged.
    • The notification requirement preempts local permits and notifications unless the commissioner has delegated permitting or notification authority under section 103I.111.
    • If operation of the well requires a Minnesota Department of Natural Resources appropriation permit, specified information must be submitted to the commissioner of natural resources and construction may begin after preliminary approval.
    • A well that is not in use must be sealed or have a maintenance permit, subject to the statutory environmental/dewatering-well exception.

    drive-point well notification deadline: 10 days after completion (personally constructed by an individual on owned or leased property for farming, agricultural purposes, or the individual's place of abode) · unused well status: sealed or maintenance permit (environmental or dewatering wells not sealed by 14 months after completion require an annually renewed maintenance permit)

    “Except as provided in paragraph (d), a person may not construct a water-supply, dewatering, or environmental well until a notification of the proposed well on a form prescribed by the commissioner is filed with the commissioner with the filing fee in section 103I.208, and, when applicable, the person has met the requirements of paragraph (e).”
  • Building in a floodplainRequired

    Construction and fill in regulated Minnesota floodplain areas, including houses, fill, culverts, and bridges.

    • Projects must comply with the community floodplain management ordinance.
    • For unincorporated areas, the county zoning authority generally administers the rule; cities generally administer within city boundaries; some townships administer floodplain permits and zoning.
    • In flood-fringe areas, residential buildings must place the lowest floor, including the basement, above the flood protection elevation.
    • The flood protection elevation is one foot above the 100-year flood plus any stage increase from flood-fringe designation; local communities may require a higher elevation.
    • If maps do not delineate floodway and flood fringe, the applicant may need engineering information verifying the flood protection elevation and that the site is outside the floodway.

    minimum lowest-floor elevation above 100-year flood: >= 1 foot (plus any stage increase due to designation of flood fringe areas)

    “Such projects as building a house, placement of fill, or installing a culvert or bridge would all require a floodplain permit.”
    2 more reviewed findings on this topic
    • Required — Building a house, placing fill, or installing a culvert or bridge in portions of a Minnesota floodplain.
      “Construction and fill is generally permitted in portions of the floodplain, provided they adhere to their community’s floodplain management ordinance. Such projects as building a house, placement of fill, or installing a culvert or bridge would all require a floodplain permit.”
    • Limited — Dwellings, enclosed structures, fill, or obstruction of flood flows within a mapped Minnesota floodway.
      “If the property a person owns or is interested in buying lies within this mapped floodway, they will not be permitted to construct a dwelling or other enclosed structure, place fill material, or obstruct flood flows in any other way.”
  • county zoning authorityLimited

    County planning and zoning authority over unincorporated areas of Minnesota.

    • The authority applies to a county having less than 300,000 population according to the 1950 federal census.
    • The statute authorizes county planning and zoning activities generally within the qualifying counties; it does not identify a separate unincorporated-area limitation in this section.
    • Except as otherwise provided, a county regardless of population must not enact, amend, or enforce an ordinance eliminating or terminating a lawful use by amortization.
    • The amortization prohibition does not apply to adults-only bookstores, adults-only theaters, or similar adults-only businesses as defined by ordinance.
    • The amortization subdivision does not prohibit nuisance-prevention or nuisance-abatement enforcement or elimination of a use determined to be a public nuisance without payment of compensation.

    population threshold: < 300000 persons (According to the 1950 federal census)

    “having less than 300,000 population according to the 1950 federal census is authorized to carry on county planning and zoning activities.”
  • county building authorityGeneral

    Minnesota counties may administer and enforce the State Building Code within their jurisdiction by ordinance; this includes a county's authority over residential construction in unincorporated county territory, subject to the statutory limits on code application and local provisions.

    • The statutory authorization is to administer and enforce the State Building Code, rather than a county-specific building code.
    • A county that is not already required by Minnesota Statutes § 326B.121, subdivision 2(a), to administer and enforce the code may elect to do so by ordinance.
    • The State Building Code applies statewide to construction, reconstruction, alteration, repair, and use of buildings and structures governed by the code.
    • The State Building Code does not apply to agricultural buildings except for state inspections or rulemaking authorized by Minnesota Statutes §§ 103F.141, 216C.19, subdivision 9, and 326B.36, and except that translucent panels or other skylights without raised curbs must have equivalent load-bearing capacity as the surrounding roof.
    • A municipality may not require building-code provisions regulating structural components or systems that differ from the State Building Code; with state building official approval, it may adopt a more restrictive ordinance where geological conditions warrant it.
    • A municipality may enforce the State Building Code through lawful means, including contracts with other municipalities or qualified individuals; building-permit fees may be retained or remitted to reimburse them.
    “If a municipality is not required by paragraph (a) to administer and enforce the State Building Code, the municipality may choose to administer and enforce the State Building Code within its jurisdiction by adopting the code by ordinance.”

Set by your town or city, not the county

In Minnesota, zoning is adopted by each town or city, so Faribault County has no county-wide answer on these. Find your town or city in the list of places on this page, or call its clerk or zoning administrator.

  • Minimum dwelling size
  • Lot coverage
  • Building height
  • Living in an RV
  • Short-term rentals

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • Mandatory utility hookup — Water and sewer connection requirements in Faribault County.

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Faribault County, Minnesota

Is Faribault County a good place to live off-grid or homestead?

Faribault County scores 53/100 on the Bolthole Index, a solid county profile. Its strengths: a stronger property-autonomy legal backdrop and manageable long-term carry cost. Watch-outs: workable self-sufficiency basics (33.6″/yr rainfall).

Do you need a building permit in Faribault County, Minnesota?

Faribault County generally requires a residential building permit, and it enforces county zoning. Onsite septic is permitted by Faribault County Planning & Zoning / SWCD (SSTS program). Owner-builders may act as their own contractor to build their home. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

How much does land cost in Faribault County, Minnesota?

Land in Faribault County runs about $8,169 per acre, based on the latest county data.

What is the water situation in Faribault County?

Faribault County gets about 33.6" of rain a year, with severe drought in roughly 10.8% of years.

How remote is Faribault County?

A representative private-land location has about 12,703 people within a 30-minute drive and 1,653,812 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

How Faribault compares in Minnesota

Compare side-by-side →See all 87 Minnesota counties ranked →