Meeker County, Minnesota

Building permits, zoning and land rules in Meeker County, Minnesota

61Index Score / 100
#34 of 87 in Minnesota

Meeker County, Minnesota requires building permits for work governed by the Minnesota State Building Code, followed by required inspections and an occupancy certificate before a new building is used123. Meeker County Land Use Records administers county zoning and sewer permits for the unincorporated area, while incorporated cities may have separate local controls45. Ask Planning & Zoning about a parcel's district before planning an RV or tiny home6.

At a glance

Building permit
Required for work governed by the state code1
Zoning
Yes; district and overlay standards vary78
Septic permit
Required; Land Use Records handles sewer permits910
RV living
Private-parcel occupancy rule not confirmed; ask Planning & Zoning116
Tiny home
State building code applies; local zoning determines allowed use12
Owner-builder
Licensing exemption available for qualifying owners; permits still apply131
Dwelling lot
At least 30,000 square feet of qualifying contiguous land, with exceptions14

Who to call

Building permits

Meeker County Building Department

Building-permit and building-inspection questions

320-693-4650

Meeker County Government Center 114 N Holcombe Avenue, Ste 150 Litchfield, MN 55355

Planning & zoning

Meeker County Planning & Zoning Department

County zoning, land-use permits, sewer permits, variances, conditional uses and rezonings

320-693-5290

Meeker County Government Center 114 N Holcombe Avenue Suite 150 Litchfield, MN 55355

Roads & driveways

Meeker County Highway Department

Electronic transportation, access or entrance, and right-of-way or utility permit applications

320-693-5360

phillip.schmalz@co.meeker.mn.us

Online permits →

Contact details are copied from each office’s official page and were checked against it on October 10, 2026.

Off-grid gear

Going off-grid in Meeker County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Meeker County, Minnesota?

Yes. Before construction, enlargement, alteration, repair, moving, demolition, an occupancy change or regulated systems work, the owner or agent must apply to the building official and obtain any permit required by the Minnesota State Building Code; the code also contains exceptions for permit-exempt work1. Meeker County has adopted that statewide construction standard15. Permitted work receives the applicable footing, foundation, rough-in, framing, energy, final and other required inspections, so ask the Building Department which checkpoints apply before concealing work216. A governed building cannot be used or occupied until the building official issues a certificate of occupancy, although a temporary certificate may be possible for a safe portion3. A qualifying owner-builder can be exempt from contractor licensing when building to occupy or retain as a rental, but not when building for resale or speculation; the exemption does not remove permit obligations131. Agricultural buildings are generally outside the State Building Code, with statutory exceptions, but other land-use rules still apply17.

Who handles Meeker County building permits, and how do you reach them?

The Meeker County Building Department is at the Meeker County Government Center, 114 N Holcombe Avenue, Ste 150, Litchfield, MN 55355, and can be reached at 320-693-465016. Start there for the building permit, code review and inspection schedule162. A code application identifies the work and land, intended use and occupancy, construction type and valuation, includes required construction documents, and bears the applicant's or agent's signature18. Planning & Zoning is in the same government center suite and can be reached at 320-693-5290 for land-use and sewer permits, setback variances, conditional uses and rezonings6. Meeker County's current building-permit fee for a particular project could not be confirmed. For construction, alteration or changed use of an entrance in a county right-of-way, obtain the county engineer's written access permit; the Highway Department accepts access or entrance applications electronically1920. An access permit issued after construction in the county right-of-way has already started is subject to double the normal application fee21.

Does Meeker County have zoning?

Yes. Meeker County Land Use Records administers county zoning, including land-use permits, setback variances, conditional uses and rezonings76. District and overlay standards control uses, height, lot area, setbacks and lot coverage, and the published ordinance directs readers to check current amendments8. Lots established for a dwelling generally need at least 30,000 square feet of contiguous qualifying land; conservation-subdivision lots are excluded, and water, floodplain, wetland, setback and slope conditions affect what land qualifies14. Setbacks vary by district and use, and lot-coverage limits vary by district and overlay, so do not apply one number countywide2223. Height also varies by district; unusually tall structures face additional conditional-use and clearance requirements24. Subdivisions must complete the county process and record the plat before lots are offered for sale; subdivision fees are set by the County Board, must be paid before any action, and are not refundable2526. Incorporated municipalities may have separate local controls, so for a parcel inside a city ask the city office as well as Planning & Zoning4. The county publishes its 2013 Zoning Subdivision Ordinance, but which district a given parcel falls in is not shown there, so ask Planning & Zoning27.

How do septic permits work in Meeker County?

Meeker County Land Use Records issues sewer permits and administers individual sewage treatment systems under the county ordinance in the unincorporated area10286. Every new or replacement system needs a management plan submitted to Planning & Zoning with the construction permit application, and installers, designers and inspectors must be licensed by the Minnesota Pollution Control Agency, with listed owner exemptions28. County permits and inspections cover gravity-flow drain fields, holding tanks and pressurized drain fields; the adopted fee schedule lists a $100 soil-verification fee and a $300 holding-tank permit9. Each additional system inspection is listed at $5029. Existing systems also require compliance inspections for listed shoreland applications, land transfers, bedroom additions and certain variances30. Septic feasibility deserves early attention because only 4.8% of mapped Meeker County soils are rated without severe limitations for a conventional drain field31. That countywide measure cannot approve a particular site, so settle the septic layout before fixing the house location. Minnesota permits limited sanitation arrangements for primitive dwellings only under stated disposal conditions, with local ordinances controlling first32.

Can you live in an RV or tiny home in Meeker County?

Meeker County's rule for occupying one RV on private land could not be confirmed, so ask Planning & Zoning how the parcel's district treats temporary or long-term RV use6. Minnesota's campground-license rule does not answer the single-RV question because it applies to areas accommodating 5 or more tents or recreational camping vehicles and leaves local land-use requirements unresolved33. Tiny houses are covered by the Minnesota State Building Code, while local zoning decides whether the use is allowed and regulates location and dimensions12. Meeker County's ordinance materials did not confirm a countywide minimum dwelling-floor-area rule. A tiny home therefore needs both code and parcel-specific zoning review158. If the unit is a new manufactured home installed for occupancy, Minnesota requires an installation inspection34. Before placing an RV or tiny home, get Planning & Zoning's answer on use, setbacks, sanitation and temporary occupancy during construction6.

Building a home in Meeker County: the steps, in order

  1. Give Planning & Zoning the parcel number and proposed use; confirm the district, overlays, allowed use, lot area, setbacks, coverage and height standards86.
  1. Settle the septic design and obtain the county sewer permit before installation109.
  1. Submit the building application with the work description, site, occupancy, construction details and required documents1816.
  1. Obtain a written county access permit before creating, altering or changing the use of an entrance in a county right-of-way1920.
  1. If the site is in a county floodplain district, obtain the zoning administrator's permit before construction, fill, excavation or a change of use35.
  1. Keep work visible for the applicable footing, foundation, rough-in, framing, energy and final inspections2.
  1. Do not occupy a governed building until the building official issues the required certificate of occupancy3.

What should you check before buying land in Meeker County?

Confirm the zoning district, current amendments, buildable area and septic feasibility before closing8149. Conventional drain-field conditions may be challenging because only 4.8% of mapped soils are rated without severe limitations, even though 98.8% of county land has a slope of 15% or less3136. Check the county floodplain district early: construction, additions, alterations, changes of use, excavation and obstructions there require a zoning-administrator permit, with other state or federal approvals obtained first35. In the county floodplain district the lowest floor must sit at least 1 foot above the regional flood elevation, on fill that extends at least 15 feet beyond the structure37. Verify legal access and the road authority because work on a county-road entrance requires written county approval19. The effective property-tax rate is about 0.9%, and the median annual property-tax bill is about $2,1593839. The nearest city of 100,000 or more is about 61 miles from the county center, which can affect contractor and material logistics40. Meeker County's private-well permit requirement and countywide utility-connection rules could not be confirmed; ask Planning & Zoning who has jurisdiction for the parcel6.

Watch-outs

  • Only 4.8% of mapped Meeker County soils are rated without severe limitations for a conventional septic drain field, so investigate parcel-specific wastewater feasibility early31.
  • Meeker County requires septic compliance inspections in listed circumstances that include land transfers, shoreland applications, bedroom additions and certain variances30.
  • The published zoning ordinance says amendments are maintained separately, so confirm the current district and overlay standards with Planning & Zoning86.
  • RV occupancy, countywide minimum dwelling size and private-well permitting could not be confirmed; ask Planning & Zoning before purchase or placement6.

Sources

  1. Minnesota Rules Chapter 1300, quoted and re-checked
  2. Minnesota Rules Chapter 1300, quoted and re-checked
  3. Minnesota Rules 1300.0220, Certificate of Occupancy, quoted and re-checked
  4. Land Use Records, quoted and re-checked
  5. Land Use Records, quoted and re-checked
  6. Meeker County Planning & Zoning Department (meekercountymn.gov)
  7. Land Use Records, quoted and re-checked
  8. Meeker County Land Development Ordinances, quoted and re-checked
  9. 2026 Adopted Fee Schedule, quoted and re-checked
  10. Land Use Records, quoted and re-checked
  11. Land Use Records (2026 county census)
  12. Tiny Houses and the 2020 Minnesota Residential Code (Minnesota statewide rule), quoted and re-checked
  13. revisor.mn.gov, quoted and re-checked
  14. Meeker County Land Development Ordinances, quoted and re-checked
  15. Minnesota Statutes § 326B.121, quoted and re-checked
  16. Meeker County Building Department (meekercountymn.gov)
  17. Minnesota Statutes § 326B.121, quoted and re-checked
  18. Minnesota Rules Chapter 1300, quoted and re-checked
  19. Meeker County Land Development Ordinances, quoted and re-checked
  20. Meeker County Highway Department (meekercountymn.gov)
  21. Meeker County Land Development Ordinances, quoted and re-checked
  22. Meeker County Land Development Ordinances, quoted and re-checked
  23. Meeker County Land Development Ordinances, quoted and re-checked
  24. Meeker County Land Development Ordinances, quoted and re-checked
  25. Meeker County Land Development Ordinances, quoted and re-checked
  26. Zoning-Subdivision Ordinance 2013, quoted and re-checked
  27. County Ordinances, quoted and re-checked
  28. Meeker County Land Development Ordinances, quoted and re-checked
  29. 2026 Adopted Fee Schedule, quoted and re-checked
  30. Meeker County Land Development Ordinances, quoted and re-checked
  31. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  32. Minnesota Administrative Rules, part 7080.2450 Maintenance (Minnesota statewide rule), quoted and re-checked
  33. 2025 Minnesota Statutes, Chapter 327 (Minnesota statewide rule), quoted and re-checked
  34. Manufactured home information (Minnesota statewide rule), quoted and re-checked
  35. Meeker County Land Development Ordinances, quoted and re-checked
  36. Share of land at 15% slope or less: Bolthole Index county data
  37. Floodplain Management Ordinance, quoted and re-checked
  38. Effective property tax rate: Bolthole Index county data
  39. Median property tax bill: Bolthole Index county data
  40. Straight-line distance from the county center to the nearest city of 100,000+ people: Bolthole Index county data

Written October 10, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

Compared with neighboring counties

Like all 6 of its neighbors, Meeker County requires a building permit for a home.

RuleMeeker CountyKandiyohi CountyMcLeod CountyWright CountyStearns CountyRenville CountySibley County
Building permitRequiredRequiredRequiredRequiredRequiredRequiredRequired
County zoningYesYesYesYesYesYesYes
Septic permitsCounty Land Use Dept.County Env. ServicesCounty Env. ServicesCounty Env. Health OfficeCounty Env. ServicesCounty Env. ServicesCounty Zoning Dept.

County locator

Meeker County in Minnesota

61
County map
Meeker County highlighted among the Minnesota counties · colored by Index score

How Meeker County scores

Seclusion56100% ev.
Self-Sufficiency40100% ev.
Admin Boringness43100% ev.
Durability65100% ev.
Property Autonomy65100% ev.
Carry Cost66100% ev.

Evidence strength: 100%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$297kTypical home
0.9%Property tax
$5,951Land / acre
28.7"Annual rain
6.6% of yrsSevere drought
3 / yr (+2.9)Mid-century 100°F days
16.8 daysMid-century dry spell
1.79" (+6.2%)Mid-century 1-day rain
1.75×Wildfire change factor
100%Forward climate coverage
$1,899Home insurance / yr
3.2% / yrInsurance growth
0.54%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
10,997People within 30 min
3,927,285People within 2 hr
38,892Radius comparison (15 mi)
38.6People / sq mi
4%Federal land
98.8%Land at 15% slope or less
4.8%Soils rated "not limited" for septic (strict USDA rating)
16,227 acWorkable land screen
11%Wooded land
49.5 tonsBiomass / forest ac
43.8°FAvg temp

Scout Meeker County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Meeker County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Meeker County

Inside a city, town or township here, that government usually sets zoning and may issue its own building permits; the county’s rules above cover land outside them.

Not yet researched: Acton Township · Cedar Mills · Cedar Mills Township · Collinwood Township · Cosmos · Cosmos Township · Danielson Township · Darwin · Darwin Township · Dassel · Dassel Township · Ellsworth Township · Forest City Township · Forest Prairie Township · Greenleaf Township · Grove City · Harvey Township · Kingston · Kingston Township · Litchfield · Litchfield Township · Manannah Township · Swede Grove Township · Union Grove Township · Watkins

Answers from the rulebook for Meeker County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Meeker County rules

  • County-wide zoningPresent (with conditions)

    County zoning and land-use controls administered by Meeker County Land Use Records.

    • The department issues land-use permits, setback variances, conditional-use permits, and rezoning applications.
    • The source does not establish that county zoning supersedes municipal zoning within incorporated municipalities.
    “The Meeker County Land Use Records department manages the creation and application of size and use restrictions imposed upon land owners in the county in accordance with the Meeker County Zoning Ordinance.”
    One more reviewed finding on this topic
    • Present (with conditions) — County zoning ordinance and land-use controls administered by Meeker County Land Use Records.
      “The Meeker County Land Use Records department manages the creation and application of size and use restrictions imposed upon land owners in the county in accordance with the Meeker County Zoning Ordinance.”
  • Zoning districtsPublished (with conditions)

    County zoning districts and district-specific development standards published in the Meeker County Land Development Ordinances.

    • The publication is from 2018 and states that looseleaf supplements are used to keep it up to date; current amendments should be checked before relying on a district standard.
    • District-specific height, lot area, setbacks, lot coverage, use, and overlay standards apply.
    “This book constitutes a publication of the Meeker County Land Development Ordinances.”
    One more reviewed finding on this topic
    • Published — Publication of county zoning and subdivision ordinance materials.
      “Floodplain Management (PDF) [...] Zoning Subdivision Ordinance 2013 (PDF)”
  • Minimum lot sizeSpecified

    Lots subject to Meeker County subdivision and zoning standards, with district and shoreland variation.

    • Examples in the ordinance include non-shoreland lots of at least 50,000 square feet; shoreland and river classifications vary by development type and lot location.
    • Dwelling lots must have at least 30,000 square feet of contiguous qualifying land, excluding conservation-subdivision lots, subject to the listed ordinary-high-water, floodplain, wetland, setback, and slope limitations.

    minimum qualifying dwelling-lot area: >= 30000 square feet (Conservation-subdivision lots are excluded; qualifying land must satisfy the listed water, floodplain, wetland, setback, and slope conditions.)

    “All lots established for the construction of a dwelling, excluding lots in a conservation subdivision pursuant to article 19B of this ordinance, shall have a minimum lot area of 30,000 square feet of contiguous land”
  • SetbacksSpecified

    Buildings, dwellings, feedlots, gravel operations, ditches, roads, and district-specific development under the county ordinances.

    • Setbacks vary by district and use.
    • Examples include a quarter-mile or half-mile feedlot setback, a 1,000-foot Class A feedlot setback subject to waiver or variance, a 500-foot gravel-mining setback subject to conditional-use permit, and a 75-foot county or judicial ditch setback.

    ditch setback: >= 75 feet (Trees may be planted to within 16.5 feet of the top of the ditch within 100 feet of a lake inlet or outlet, as stated in the ordinance.)

    “No dwelling shall hereafter be erected within 1,000 feet from an existing Class A feedlot with 50 or more animal units in non-shoreland, or ten or more animal units in a shoreland district without first obtaining a signed waiver regarding setback as per section 22.10.G, or being granted a variance to said setback.”
  • Lot coverageSpecified

    Lots and tracts in county zoning districts; the percentage varies by district and overlay.

    • Examples include 25 percent impervious coverage in identified shoreland districts and 50 percent building coverage in the C-1 Commercial District.
    • District-specific, shoreland, watershed, and conservation-subdivision provisions may alter the applicable standard.

    C-1 building coverage: <= 50 percent

    “Not more than 50 percent of the lot or tract shall be occupied by buildings.”
  • Building heightSpecified

    Structures governed by county zoning districts and overlays.

    • Maximum height limitations are set by district.
    • Structures exceeding 150 feet require a conditional-use permit and letters of clearance from the Federal Aviation Administration and airport commission for an airport within ten miles.
    • Specified agricultural structures and other listed structures may receive increased or conditional height limits.

    conditional-use threshold: > 150 feet (FAA and airport-commission clearance required as stated.)

    “Any structure that exceeds 150 feet in height must be granted a conditional use permit prior to construction, and then only after obtaining a letter of clearance from the Federal Aviation Administration and the airport commission for any airport located within ten miles of the structure proposed to exceed this height limitation.”
  • Who permits septicCounty (with conditions)

    Sewer permits and individual sewage treatment system administration in Meeker County.

    • The county source states that the Land Use Records department issues sewer permits.
    • State and local requirements may also apply.
    “This is the department that issues land use permits, sewer permits, applications for variance - as they apply to setbacks, conditional use permits and applications for rezoning.”
    2 more reviewed findings on this topic
    • County (with conditions) — Subsurface sewage treatment systems subject to the Meeker County ordinance in the unincorporated area.
      “Management plans are required for all new or replacement SSTS. The management plan shall be submitted to Meeker County Planning and Zoning with the construction permit application for review and approval.”
    • County — County administration of sewer permits and related land-use controls.
      “This is the department that issues land use permits, sewer permits, applications for variance - as they apply to setbacks, conditional use permits and applications for rezoning.”
  • Septic permitRequired

    Individual sewage treatment systems, including gravity-flow drain-field, alternative holding-tank, and pressurized drain-field systems.

    • The 2026 fee schedule lists permits and inspections for these systems; it does not establish that every septic-related activity has identical requirements.
    • A $100 septic permit soil-verification fee is listed; the fee schedule also lists holding-tank and operating permits.

    septic permit soil verification fee: 100 USD · holding tank permit: 300 USD

    “All individual sewage treatment systems, permit & inspection on Gravity Flow Drain Field Systems, Alternative Systems (Holding Tank) & Pressurized Drain Field Systems”
  • Septic inspectionRequired

    Individual sewage treatment systems administered through Meeker County.

    • The 2026 fee schedule expressly pairs permit and inspection for gravity-flow, alternative holding-tank, and pressurized drain-field systems.
    • Each additional system inspection is separately listed at $50.

    additional system inspection: 50 USD

    “All individual sewage treatment systems, permit & inspection on Gravity Flow Drain Field Systems, Alternative Systems (Holding Tank) & Pressurized Drain Field Systems”
    One more reviewed finding on this topic
    • Required — SSTS installation and specified existing-system compliance inspections.
      “An SSTS shall require a compliance inspection when any one of the following conditions occur:”
  • Subdividing landRegulated (with conditions)

    Subdivision proposals subject to the Meeker County Subdivision Ordinance.

    • The ordinance provides procedures for preliminary plats, final plats, variances, appeals, amendments, and certificates of survey subdivision proposals.
    • Fees must be paid in full before action is taken; fees are not refundable.
    • Final-plat or certificate-of-survey recording fees permitted by Minnesota Statutes are additional.
    “The fee is payable at the time of filing an application or proposal and is not refundable. No action shall be taken on any application or proposal until all applicable fees have been paid in full.”
    One more reviewed finding on this topic
    • Regulated (with conditions) — Subdivision of land subject to the Meeker County Subdivision Ordinance.
      “There shall be no offer to sell any lots in a subdivision until the requirements of this article have been complied with and the plat has been filed and recorded with the county recorder.”
  • Driveway accessRequired

    Construction, alteration, or change of use of an access, including a driveway or field entrance, within a Meeker County right-of-way.

    • A written access permit from the county engineer is required before construction, alteration, or change of use.
    • Examples include a new access onto a county road or CSAH, revised use or improvement of an existing access, and a development proposal or plat adjacent to an existing or proposed county road or CSAH.
    • Access is not permitted where the county has acquired controlled-access right-of-way.
    • Variances under 20 percent may be granted case-by-case by the county engineer; variances over 20 percent require County Board approval.
    • Applications must be written on the county engineer's form.

    minimum culvert size: >= 15 inches (or a size determined by the Meeker County Department of Public Works, whichever is greater)

    “A written access permit, issued by the county engineer, shall be required before construction, alteration, or change of use of an access, whether a driveway or a field entrance, within any Meeker County right-of-way.”
    One more reviewed finding on this topic
    • Required — Construction, alteration, or change of use of a driveway or field entrance within a Meeker County right-of-way.
      “A written access permit, issued by the county engineer, shall be required before construction, alteration, or change of use of an access, whether a driveway or a field entrance, within any Meeker County right-of-way.”
  • Building in a floodplainRequired

    Construction, alteration, use changes, excavation, obstructions, manufactured homes, and subdivisions within lands designated as floodplains within Meeker County jurisdiction.

    • The ordinance applies to all lands designated as floodplains within Meeker County jurisdiction.
    • The FEMA flood insurance rate map dated April 3, 2012 is adopted as the official floodplain zoning district map.
    • The regulatory flood protection elevation is at least one foot above the regional flood elevation, plus increases caused by floodway encroachments.
    • New structures and additions in the flood fringe are subject to section 4.2 standards and section 4.3 floodway/flood-fringe evaluation.
    • Structures must be constructed on fill so the basement floor, or first floor if there is no basement, is at or above the regulatory flood protection elevation; fill must extend at least 15 feet beyond the structure.
    • A site development plan and hydrologic/hydraulic analysis by a qualified engineer or hydrologist may be required to determine floodway or flood-fringe location and the regulatory elevation.
    • The zoning administrator must submit required evaluation information to the DNR area hydrologist at least 20 days before granting a permit or subdivision/manufactured-home-park approval.
    • New or replacement on-site sewage systems must minimize or eliminate floodwater infiltration and contamination; systems meeting current statewide standards are deemed compliant.
    • A variance cannot permit a lower degree of flood protection than the regulatory flood protection elevation.
    • Nonconforming structural alterations or additions are subject to a 50-percent market-value threshold.

    regulatory flood protection elevation: >= 1 foot above regional flood elevation (plus any increases in flood elevation caused by floodway encroachments) · fill extension beyond structure: >= 15 feet · commercial/manufacturing flood depth: > 2 feet (flood warning system required if inundation would exceed this depth) · commercial/manufacturing flood velocity: > 4 feet per second (flood warning system required if velocity would exceed this speed) · nonconforming alteration threshold: > 50 percent of market value (if exceeded, the structure must meet new-structure standards)

    “A permit issued by the zoning administrator shall be secured prior to the construction, addition, or alteration of any building or structure; prior to the use or change of use of a building, structure, or land; prior to the change or extension of a nonconforming use; and prior to the excavation or the placement of an obstruction within the floodplain.”
    One more reviewed finding on this topic
    • Required — Construction, additions, alterations, changes of use, excavation, or obstructions within Meeker County floodplain districts.
      “A permit issued by the zoning administrator shall be secured prior to the construction, addition, or alteration of any building or structure; prior to the use or change of use of a building, structure, or land; prior to the change or extension of a nonconforming use; and prior to the excavation or the placement of an obstruction within the floodplain.”
  • Permit feesVariable (with conditions)

    Permits for work in Meeker County rights-of-way and related county access permits.

    • Permit fees are set by the Meeker County Board of Commissioners.
    • An access permit issued after construction has started in a county right-of-way is subject to double the normal access-permit application fees.
    • Subdivision and land-use application fees are separately established by the County Board.
    “A permit shall be required for all work that is to be done within Meeker County right-of-way. Permit fees shall be set by the Meeker County Board of Commissioners.”

Minnesota rules that apply here

  • Building permitLimited

    Construction, enlargement, alteration, repair, moving, demolition, or occupancy changes involving buildings or structures, and regulated gas, mechanical, electrical, plumbing, or other equipment, in Minnesota jurisdictions where the State Building Code is administered and enforced.

    • The State Building Code is the statewide construction standard for buildings and structures governed by the code.
    • The work must be preceded by an application to the building official and issuance of the required permit.
    • Municipalities that had adopted the State Building Code as of January 1, 2008 generally must continue administering and enforcing it; the statutory exception is for municipalities with a population under 2,500 located outside a metropolitan county.
    • A municipality not required to administer and enforce the code may choose to do so by adopting the code by ordinance.
    • Permits are not required for listed exempt work, including one-story detached accessory structures used as tool or storage sheds, playhouses, and similar uses not exceeding 200 square feet; fences not over seven feet; and other exemptions in Minnesota Rules part 1300.0120, subpart 4.
    • Permit exemptions do not authorize work violating the State Building Code or other applicable laws or ordinances.
    • Ordinary repairs are exempt only when they do not include specified structural, egress, plumbing, electrical, mechanical, or public-health or general-safety work.

    detached accessory structure exemption floor area: <= 200 square feet (one-story detached accessory structures used as tool and storage sheds, playhouses, and similar uses) · fence exemption height: <= 7 feet · emergency repair permit application deadline: next working business day (equipment replacements and repairs performed in an emergency situation)

    “An owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert, or replace any gas, mechanical, electrical, plumbing system, or other equipment, the installation of which is regulated by the code; or cause any such work to be done, shall first make application to the building official and obtain the required permit.”
    One more reviewed finding on this topic
    • Required — Construction, enlargement, alteration, repair, moving, demolition, occupancy changes, and regulated building systems governed by the State Building Code.
      “An owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert, or replace any gas, mechanical, electrical, plumbing system, or other equipment, the installation of which is regulated by the code; or cause any such work to be done, shall first make application to the building official and obtain the required permit.”
  • Owner-builder exemptionAvailable (with conditions)

    An owner of residential real estate who personally builds or improves residential real estate, as an exemption from the residential contractor licensing requirement.

    • The owner must occupy or intend to occupy the residential real estate for residential purposes, or retain ownership for rental purposes after completion.
    • The exemption does not apply when the owner constructs or improves residential real estate for resale or speculation.
    • An owner is presumed to be building or improving for speculation if the owner constructs or improves more than one property within any 24-month period, unless the properties will be retained for rental purposes.
    • This is a contractor-licensing exemption and does not waive applicable building permits, inspections, or certificates of occupancy.

    speculation presumption threshold: > 1 additional property within 24 months (The presumption does not apply if the properties will be retained by the owner for rental purposes.)

    “The license requirement does not apply to: [...] an owner of residential real estate who builds or improves residential real estate”
    One more reviewed finding on this topic
    • Available (with conditions) — Owner licensing exemption for an owner of residential real estate who builds or improves the property.
      “The license requirement does not apply to: [...] (3) an owner of residential real estate who builds or improves residential real estate if the owner occupies or will occupy the residential real estate for residential purposes, or will retain ownership for rental purposes upon completion of the building or improvement.”
  • Building code adoptedAdopted (with conditions)

    Construction, reconstruction, alteration, repair, and use of buildings and other structures of the type governed by the Minnesota State Building Code throughout Minnesota.

    • The State Building Code supersedes the building code of any municipality.
    • The State Building Code does not apply to agricultural buildings except for the state inspections and rulemaking identified in Minnesota Statutes section 326B.121, subdivision 1, paragraph (c), clause (1), and the structural-support requirement for translucent panels or other skylights without raised curbs in clause (2).
    • The 2020 Minnesota State Building Code is effective March 31, 2020, except the Minnesota Mechanical Fuel Gas Code, which is effective April 6, 2020.
    • Municipal enforcement generally requires adoption by local ordinance, subject to statutory requirements for certain municipalities and statutory enforcement responsibilities where no adoption ordinance is in effect.
    • The 2024 Minnesota Commercial Energy Code is effective January 5, 2024.
    • Requirements for adult changing stations are effective August 15, 2025, and requirements for window-cleaning safety features are effective November 7, 2025, according to the Department of Labor and Industry update page.

    2020 Minnesota State Building Code effective date: 2020-03-31 (Minnesota Mechanical Fuel Gas Code effective 2020-04-06) · 2024 Minnesota Commercial Energy Code effective date: 2024-01-05 · Adult changing station supplement effective date: 2025-08-15 · Window-cleaning safety feature supplement effective date: 2025-11-07

    “(a) The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, and use of buildings and other structures of the type governed by the code.”
    One more reviewed finding on this topic
    • Adopted (with conditions) — Construction, reconstruction, alteration, repair, and use of buildings and structures governed by the Minnesota State Building Code in Meeker County.
      “The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, and use of buildings and other structures of the type governed by the code.”
  • InspectionsRequired

    Construction or work for which a Minnesota State Building Code permit is required.

    • The work must remain accessible and exposed until approved.
    • The permit applicant must cause the work to remain accessible and exposed for inspection.
    • The building official identifies required inspections; the permit holder must maintain the inspection record card until final approval.
    • Work may not proceed beyond each successive inspection point without building-official approval; noncomplying portions must be corrected and may not be covered or concealed until authorized.
    “Construction or work for which a permit is required is subject to inspection by the building official”
    One more reviewed finding on this topic
    • Required — Permitted building work governed by the Minnesota State Building Code.
      “The building official shall make all of the required inspections or accept reports of inspection by approved agencies or individuals.”
  • Certificate of occupancyLimited

    Use or occupancy of buildings and structures, and changes in existing occupancy classification, in Minnesota jurisdictions administering and enforcing the State Building Code.

    • A building or structure may not be used or occupied, and an existing occupancy classification may not be changed, until the building official issues a certificate of occupancy under Minnesota Rules part 1300.0220.
    • The rule applies through the building official and therefore depends on the relevant jurisdiction administering and enforcing the State Building Code.
    • Issuance of a certificate of occupancy is not approval of a violation of the code or other municipal ordinances; a certificate purporting to authorize violation or cancellation of those requirements is invalid.
    • A municipality has the option of requiring certificates of occupancy for U occupancies constructed under the International Building Code, accessory structures constructed under the International Residential Code, and used manufactured homes moved into or within a jurisdiction.
    • Legal occupancy of a structure existing on the date of code adoption may continue without change.
    • A temporary certificate may be issued before all permitted work is complete if the occupied portion can be occupied safely; the building official sets its validity period.

    optional certificate category: U occupancies constructed under the International Building Code (municipality has the option of requiring a certificate) · optional certificate category: accessory structures constructed under the International Residential Code (municipality has the option of requiring a certificate) · optional certificate category: used manufactured homes moved into or within a jurisdiction (municipality has the option of requiring a certificate)

    “No building or structure shall be used or occupied, and no change in the existing occupancy classification of a building, structure, or portion of a building or structure shall be made until the building official has issued a certificate of occupancy for the building or structure under this part.”
    One more reviewed finding on this topic
    • Required — Use or occupancy of buildings and changes in occupancy classification governed by the Minnesota State Building Code.
      “No building or structure shall be used or occupied, and no change in the existing occupancy classification of a building, structure, or portion of a building or structure shall be made until the building official has issued a certificate of occupancy for the building or structure under this part.”
  • Camping on your landLimited

    Private or public areas accommodating five or more tents or recreational camping vehicles on a daily, nightly, weekly, or longer basis

    • An annual license from the Minnesota Department of Health is required before establishing, maintaining, conducting, or operating a recreational camping area.
    • The license requires application, payment of the statutory fee, and approval for operation including plan review.
    • A recreational camping area excludes children's camps, industrial camps, migrant labor camps, United States Forest Service camps, state forest service camps, qualifying state wildlife-management or state-owned public-access areas, qualifying temporary holding areas adjacent to motorsports facilities, and a privately owned area used by a private club no more than once annually and no longer than seven consecutive days.
    • A special event recreational camping area operates no more than two times annually and for no more than 14 consecutive days.
    • The statute does not resolve local zoning or land-use requirements.

    minimum accommodated tents or recreational camping vehicles: >= 5 units (Statutory exclusions apply.) · special event operating frequency: <= 2 times annually (Special event recreational camping area.) · special event duration: <= 14 consecutive days (Special event recreational camping area.) · annual license base fee for recreational camping area with 24 or fewer sites: 100 USD (Additional $8 per licensed site; special event areas are excluded from that per-site paragraph.) · annual license base fee for recreational camping area with 25 to 99 sites: 410 USD (Additional $8 per licensed site; special event areas are excluded from that per-site paragraph.) · annual license base fee for recreational camping area with 100 or more sites: 610 USD (Additional $8 per licensed site; special event areas are excluded from that per-site paragraph.)

    “"Recreational camping area" means any area, whether privately or publicly owned, used on a daily, nightly, weekly, or longer basis for the accommodation of five or more tents or recreational camping vehicles free of charge or for compensation. [...] "Special event recreational camping area" means a recreational camping area which operates no more than two times annually and for no more than 14 consecutive days. [...] No person, firm or corporation shall establish, maintain, conduct or operate a manufactured home park or recreational camping area within this state without first obtaining an annual license from the state Department of Health.”
  • Tiny homesLimited

    Construction and residential use of tiny houses statewide, subject to the Minnesota State Building Code and applicable municipal zoning ordinances.

    • The Minnesota State Building Code applies statewide to construction of buildings, including tiny houses.
    • Municipal zoning ordinances vary by municipality and regulate land use, location, height, width, foundation type, number of stories, and building size.
    • The jurisdiction must be consulted for local zoning specifics.
    • Tiny houses used as dwelling units must comply with the Minnesota Residential Code unless otherwise stated in Appendix Q.
    • A tiny house is a dwelling of 400 square feet or less in floor area, excluding lofts.
    • Applicable requirements include light, ventilation, heating, minimum room sizes, ceiling heights, sanitation, toilet, bath and shower spaces, emergency escape and rescue openings, means of egress, smoke alarms, and carbon monoxide alarms.

    maximum tiny-house floor area: <= 400 square feet (lofts excluded) · minimum habitable-space and hallway ceiling height: >= 6.67 feet (6 feet 8 inches) · minimum bathroom, toilet-room, and kitchen ceiling height: >= 6.33 feet (6 feet 4 inches)

    “The Minnesota State Building Code is the standard of construction that applies statewide for the construction of buildings (MS 326B.121) including tiny houses.”
  • Manufactured homesLimited

    New manufactured homes installed for occupancy statewide in Minnesota

    • Inspection is required under Federal Installation Standards Programs, CFR 3285 and 3286.
    • Manufactured-home alterations require documentation submitted for review to the Department of Labor and Industry or the local authority having jurisdiction before work begins.
    • Local building officials and local code enforcement may apply depending on the municipality.
    “All new manufactured homes installed in Minnesota for occupancy are required to be inspected according to the Federal Installation Standards Programs, Code of Federal Regulations (CFR) 3285 and 3286.”
  • Accessory dwellingsLimited

    Temporary family health care dwellings used as a narrow accessory residential dwelling category statewide, where the municipality has not opted out of Minnesota Statutes § 462.3593.

    • The dwelling must be primarily assembled away from its installation site, be no more than 300 gross square feet, lack a permanent foundation, meet state-recognized accessibility standards, provide water and electric utilities, use compatible exterior materials, have at least R-15 insulation, be transportable by the specified truck types, comply with Minnesota Rules chapter 1360 or 1361 with the required seal and data plate or ANSI Code 119.2, and have a backflow check valve.
    • A caregiver or relative must apply for a municipal temporary dwelling permit with the required signatures and documentation, including provider-network proof, medical certification, septic-service documentation, adjacent-owner notice affidavit, and a site map.
    • The dwelling must be on property where the caregiver or relative resides, comply with setbacks and applicable floor-area-ratio limits, and permit safe and timely access for septic services and emergency vehicles.
    • Occupancy is limited to one identified mentally or physically impaired person, and only one temporary family health care dwelling is allowed per lot.
    • The dwelling must comply with applicable state law, local ordinances, and charter provisions unless otherwise provided.
    • The initial permit lasts six months and may be renewed once for an additional six months.
    • The municipality may inspect, revoke the permit for violations, and require removal within 60 days after revocation.
    • Unless otherwise provided by ordinance, the municipality may charge up to $100 for the initial permit and up to $50 for renewal.
    • The municipality may opt out of the statutory requirements by ordinance.

    maximum dwelling area: <= 300 gross square feet · initial permit term: 6 months (renewable once for an additional six months) · maximum initial permit fee: <= 100 USD (unless otherwise provided by ordinance) · maximum renewal permit fee: <= 50 USD (unless otherwise provided by ordinance) · maximum occupants: 1 person (occupant must be a mentally or physically impaired person) · maximum dwellings per lot: 1 dwelling

    “A temporary family health care dwelling that meets the requirements of this section cannot be prohibited by a local ordinance that regulates accessory uses or recreational vehicle parking or storage.”
    One more reviewed finding on this topic
    • Limited — Accessory dwelling units statewide, including conversion of a structure into an ADU, subject to local zoning and Minnesota residential building-code requirements.
      “Local zoning ordinances dictate if a tiny home or accessory dwelling unit (ADU) is allowed on the property.”
  • Off-grid sanitationLimited

    Primitive dwellings using toilet-waste treatment devices in low dwelling-density areas, and privies governed by Minnesota SSTS rules.

    • Septage disposal by the owner must follow local ordinances.
    • If no local ordinance exists, septage must not be discharged to surface waters, drainageways, steeply sloping areas, or wet areas in a manner or volume harmful to the environment or public health or that creates a nuisance.
    • Material must be buried or covered with soil.
    • If site conditions do not meet the rule, solids disposal must be performed under the applicable rule by a licensed maintenance business.
    • Privy solids must be removed when the privy is filled to one-half capacity.
    • Abandoned pits must have sewage solids and contaminated soil removed and be filled with clean earth and slightly mounded.

    privy solids removal threshold: 50 percent capacity

    “For primitive dwellings using toilet waste treatment devices in low dwelling density areas, septage disposal from these devices by the owner must be in accordance with local ordinances. If no ordinance exists, the septage must not be discharged to surface waters, drainageways, steeply sloping areas, or wet areas in a manner or volume that is harmful to the environment or public health or that creates a nuisance. The material must be buried or covered with soil.”
  • Well permitLimited

    Construction of water-supply, dewatering, and environmental wells in Minnesota.

    • A well notification and applicable filing fee are generally required before construction; the statute describes notification rather than a general construction-permit requirement for these wells.
    • A drive-point water-supply well personally constructed by an individual on owned or leased property for farming, agricultural purposes, or the individual's place of abode must be reported within ten days after completion, and no notification fee may be charged.
    • The notification requirement preempts local permits and notifications unless the commissioner has delegated permitting or notification authority under section 103I.111.
    • If operation of the well requires a Minnesota Department of Natural Resources appropriation permit, specified information must be submitted to the commissioner of natural resources and construction may begin after preliminary approval.
    • A well that is not in use must be sealed or have a maintenance permit, subject to the statutory environmental/dewatering-well exception.

    drive-point well notification deadline: 10 days after completion (personally constructed by an individual on owned or leased property for farming, agricultural purposes, or the individual's place of abode) · unused well status: sealed or maintenance permit (environmental or dewatering wells not sealed by 14 months after completion require an annually renewed maintenance permit)

    “Except as provided in paragraph (d), a person may not construct a water-supply, dewatering, or environmental well until a notification of the proposed well on a form prescribed by the commissioner is filed with the commissioner with the filing fee in section 103I.208, and, when applicable, the person has met the requirements of paragraph (e).”
  • Agricultural exemptionAvailable (with conditions)

    Agricultural buildings statewide that meet the definition in Minnesota Statutes § 326B.103, subdivision 3.

    • The structure must be on agricultural land as determined by the governing assessor for the municipality or county under section 273.13, subdivision 23.
    • The structure must be designed, constructed, and used to house farm implements, livestock, or agricultural products under section 273.13, subdivision 23.
    • The building must be used by the owner, lessee, and sublessee and members of their immediate families, employees, and persons engaged in pickup or delivery of agricultural products.
    • The State Building Code does not apply except with respect to state inspections required or rulemaking authorized by sections 103F.141, 216C.19, subdivision 9, and 326B.36.
    • Translucent panels or other skylights without raised curbs must be supported to have equivalent load-bearing capacity as the surrounding roof.
    “The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, and use of buildings and other structures of the type governed by the code. [...] (c) The State Building Code does not apply to agricultural buildings except: (1) with respect to state inspections required or rulemaking authorized by sections 103F.141; 216C.19, subdivision 9; and 326B.36; and (2) translucent panels or other skylights without raised curbs shall be supported to have equivalent load-bearing capacity as the surrounding roof.”
    One more reviewed finding on this topic
    • Available (with conditions) — Agricultural buildings under the Minnesota State Building Code.
      “The State Building Code does not apply to agricultural buildings except:”
  • Permit processPublished (with conditions)

    Applications for permits governed by the Minnesota State Building Code.

    • The application must be written on a form furnished by the Department of Building Safety.
    • The application must identify and describe the work, locate the property, state intended use and occupancy, identify construction type, include required construction documents and information, state proposed-work valuation, be signed by the applicant or authorized agent, and provide other data required by the building official.
    • The building official examines applications within a reasonable time.
    • Nonconforming applications must be rejected with reasons; conforming applications must receive a permit.
    • The code in effect at the time of application applies.
    “Subpart 7. Application for permit. To obtain a permit, the applicant shall file an application in writing on a form furnished by the Department of Building Safety for that purpose.”
    2 more reviewed findings on this topic
    • Published (with conditions) — Applications for permits governed by the Minnesota State Building Code.
      “The building official shall examine or cause to be examined applications for permits and amendments within a reasonable time after filing. If the application or the construction documents do not conform to the requirements of pertinent laws, the building official shall reject the application and notify the applicant of the reasons.”
    • Published (with conditions) — Building-permit administration under the Minnesota State Building Code where the code has been adopted or otherwise applies.
      “However, it is only the building official that can review and approve building code requirements and subsequently sign-off on and/or issue building permits. If such an application is construction related only and the work complies with the building code, the building official must issue a building permit. Other building permits may be denied (by the local board or commission) if the proposal does not comply with other local zoning codes or ordinances.”
  • county zoning authorityLimited

    County planning and zoning authority over unincorporated areas of Minnesota.

    • The authority applies to a county having less than 300,000 population according to the 1950 federal census.
    • The statute authorizes county planning and zoning activities generally within the qualifying counties; it does not identify a separate unincorporated-area limitation in this section.
    • Except as otherwise provided, a county regardless of population must not enact, amend, or enforce an ordinance eliminating or terminating a lawful use by amortization.
    • The amortization prohibition does not apply to adults-only bookstores, adults-only theaters, or similar adults-only businesses as defined by ordinance.
    • The amortization subdivision does not prohibit nuisance-prevention or nuisance-abatement enforcement or elimination of a use determined to be a public nuisance without payment of compensation.

    population threshold: < 300000 persons (According to the 1950 federal census)

    “having less than 300,000 population according to the 1950 federal census is authorized to carry on county planning and zoning activities.”
  • county building authorityGeneral

    Minnesota counties may administer and enforce the State Building Code within their jurisdiction by ordinance; this includes a county's authority over residential construction in unincorporated county territory, subject to the statutory limits on code application and local provisions.

    • The statutory authorization is to administer and enforce the State Building Code, rather than a county-specific building code.
    • A county that is not already required by Minnesota Statutes § 326B.121, subdivision 2(a), to administer and enforce the code may elect to do so by ordinance.
    • The State Building Code applies statewide to construction, reconstruction, alteration, repair, and use of buildings and structures governed by the code.
    • The State Building Code does not apply to agricultural buildings except for state inspections or rulemaking authorized by Minnesota Statutes §§ 103F.141, 216C.19, subdivision 9, and 326B.36, and except that translucent panels or other skylights without raised curbs must have equivalent load-bearing capacity as the surrounding roof.
    • A municipality may not require building-code provisions regulating structural components or systems that differ from the State Building Code; with state building official approval, it may adopt a more restrictive ordinance where geological conditions warrant it.
    • A municipality may enforce the State Building Code through lawful means, including contracts with other municipalities or qualified individuals; building-permit fees may be retained or remitted to reimburse them.
    “If a municipality is not required by paragraph (a) to administer and enforce the State Building Code, the municipality may choose to administer and enforce the State Building Code within its jurisdiction by adopting the code by ordinance.”

Set by your town or city, not the county

In Minnesota, zoning is adopted by each town or city, so Meeker County has no county-wide answer on these. Find your town or city in the list of places on this page, or call its clerk or zoning administrator.

  • Minimum dwelling size
  • Living in an RV
  • Short-term rentals

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • Mandatory utility hookup — Water and sewer connection requirements in Meeker County.

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Water rights & wells in Meeker County

Whether a new home can legally get its own water here — the sub-state groundwater regime, from Minnesota’s water agency.

Actively managed

This basin is under active state management — new water use is scrutinized, though a domestic well is usually still allowed.

Household wellExempt up to a limit

Regulated-riparian: appropriation permits apply above 10,000 gpd / 1 million gal/yr. Domestic use under those thresholds is exempt; a well-construction notification to the MN Dept. of Health is still required. Household use is far below the cap.

Limit: <=10,000 gpd and <=1,000,000 gal/yr serving <=25 persons

Minnesota DNR — Do I need a water permit? ↗
  • Bonanza Valley Groundwater Management Arealocalized of county

    DNR-designated GWMA (2016) where irrigation-driven groundwater use may be unsustainable; new/expanded appropriation permits get heightened review. Domestic wells exempt.

    Minnesota DNR — Bonanza Valley GWMA ↗

Regulated-riparian state (large uses permitted). Groundwater rules change and basin boundaries follow the aquifer, not the county line — confirm current well and appropriation rules with the Minnesota state water agency before you buy or drill.Groundwater governance as of Jul 2026, cited to each administering agency.

Living off-grid in Meeker County, Minnesota

Is Meeker County a good place to live off-grid or homestead?

Meeker County scores 61/100 on the Bolthole Index, a solid county profile. Its strengths: manageable long-term carry cost and a stronger property-autonomy legal backdrop. Watch-outs: workable self-sufficiency basics (28.7″/yr rainfall).

Do you need a building permit in Meeker County, Minnesota?

Meeker County generally requires a residential building permit, and it enforces county zoning. Onsite septic is permitted by Meeker County Land Use Department (SSTS/sewer permits). Owner-builders may act as their own contractor to build their home. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

How much does land cost in Meeker County, Minnesota?

Land in Meeker County runs about $5,951 per acre, based on the latest county data.

What is the water situation in Meeker County?

Meeker County gets about 28.7" of rain a year, with severe drought in roughly 6.6% of years. On water rights, Meeker County lies in the Bonanza Valley Groundwater Management Area — DNR-designated GWMA (2016) where irrigation-driven groundwater use may be unsustainable; new/expanded appropriation permits get heightened review. Domestic wells exempt..

How remote is Meeker County?

A representative private-land location has about 10,997 people within a 30-minute drive and 3,927,285 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

How Meeker compares in Minnesota

Compare side-by-side →See all 87 Minnesota counties ranked →