Bolthole Index

Pope County, Minnesota

Building permits, zoning and land rules in Pope County, Minnesota

55Index Score / 100
#52 of 87 in Minnesota

Unincorporated Pope County, Minnesota requires a land-use permit for structures built or moved onto property and specified structural remodeling.1 County zoning applies outside incorporated cities, and townships may require additional approval.23 Pope County Land & Resource Management handles county land-use approval and administers the septic program; inside city limits, contact the city directly for building permits.453

At a glance

Building permit
Land-use approval required for construction, moved structures and specified structural remodeling; limited small-portable-structure exemption16
Zoning
County zoning outside cities; Glenwood Township also publishes its own zoning ordinance27
Septic
County approval required for SSTS installation or alteration85
RV living
Land Use Permit or Interim Use Permit required; ordinary intermittent RV use limited to 120 consecutive days910
A-1 accessory dwelling
One accessory dwelling is administratively permitted per lot; additional units require conditional-use approval11
Owner-builder
A qualifying owner may be exempt from contractor licensing, but permits and inspections still apply12
Setbacks
District-specific; A-1 includes a 10-foot side yard and road setbacks measured from the centerline1314

Who to call

Planning & zoning

Pope County Land & Resource Management

County planning, zoning, permitting, septic systems and floodplain management

(320) 634-7791

130 E. Minnesota Avenue, Glenwood, MN 56334

Online permits →

Contact details are copied from each office’s official page and were checked against it on October 12, 2026.

Off-grid gear

Going off-grid in Pope County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Pope County, Minnesota?

Yes. Unincorporated Pope County requires a land-use permit when a structure is built or moved onto a property, and for specified structural remodeling.1 Houses, sheds, decks and garages are covered, but portable unattached structures under 144 square feet with no sleeping or residential quarters are exempt from the permit requirement and must still meet setbacks and impervious-surface standards.16 A permit is generally unnecessary for siding, windows, shingles or remodeling that leaves the exterior footprint unchanged, but structural work can still require one.1

The county permit is a land-use approval; Minnesota’s State Building Code is the statewide construction standard for buildings governed by that code.15 We could not confirm who performs general building-code enforcement in unincorporated Pope County, so ask Land & Resource Management whether a separate code permit or inspection applies before contracting or ordering materials.4 The 2026 county fee is $250 for a residential-structure land-use permit, and the fee must accompany the application.6

Who issues building permits in Pope County, and how do you reach them?

Pope County Land & Resource Management is the first stop for county land-use approval, zoning, septic and floodplain questions.4 The office is at 130 E. Minnesota Avenue in Glenwood and can be reached at (320) 634-7791.4 Applications may be submitted online, by mail or drop-off, or in person, and processing times vary.16

Pope County does not issue building permits inside incorporated municipalities; applicants there should contact the appropriate city clerk.3 Applicants in unincorporated areas must also ask township officials whether an additional or separate township permit is required.3 Land & Resource Management continues to administer the county septic program.5 Conditional-use, interim-use and variance applications each cost $500 plus a $46 recording fee in 2026.6

Does Pope County have zoning?

Yes. Pope County’s Land Use Controls Ordinance regulates land use and development in unincorporated Pope County.2 Townships may require additional approval; Glenwood Township publishes its own zoning ordinance.37 Septic installation or alteration in Glenwood Township still requires approval through the county SSTS program.175 Vacation-home rentals in unincorporated areas require either a Land Use Permit or an Interim Use Permit.18

Check the official zoning map before treating a parcel as buildable because the map controls the parcel’s current zoning district.19 Lot area and setbacks vary by district, and shoreland setbacks for structures and sewage systems are measured from the ordinary high water level.13 In the Non-Intensive Agriculture district, listed residences require at least 3 acres and the side yard is at least 10 feet.2014 One accessory dwelling unit is administratively permitted per lot in that district; additional units require conditional-use approval.11

How do septic permits work in Pope County?

Pope County Land & Resource Management administers the county septic program, working with state-licensed designers and inspectors.5 A county septic permit is required for SSTS installation or alteration, with a state-licensed designer submitting the design for county review.821 Large systems designed above 10,000 gallons per day require Minnesota Pollution Control Agency permitting.22

Before a permitted septic system is covered, the owner or contractor must give Land & Resource Management at least 24 hours’ notice for an inspection by a state-licensed inspector; a passing inspection results in a certificate of compliance.23 Pope County also requires septic inspections for qualifying property transfers in unincorporated areas and municipalities without public sewer systems.24 Off-grid does not mean sanitation-free: privy vaults and other non-water-carried systems remain regulated, and recreational campsites cannot use individual on-site sewage systems.25 Only 12% of county soils are rated without severe limitations for a conventional drain field, so make the site and soil evaluation an early purchase contingency.26

Can you live in an RV or tiny home in Pope County?

Unincorporated Pope County requires a Land Use Permit or Interim Use Permit for RV use.9 One RV per lot may be used intermittently for recreation or guests for up to 120 consecutive days, subject to setbacks, wastewater disposal, sanitation, licensing and tire requirements.10 Longer stays require an Interim Use Permit and adequate siting and sewering; a second occupied RV is limited to 7 consecutive days with at least 30 days between second-RV stays.10 Stored, uninhabited RVs cannot connect to sewer or water, and recreational campsites offering water hookups must also offer centralized sewage-treatment hookups.27

Minnesota treats a tiny house used as a dwelling as subject to the residential code, while Pope County zoning determines whether the use is allowed on the parcel.28 A tiny home built or moved onto property remains subject to county land-use approval; ask Land & Resource Management about the proposed dwelling before delivery.14

What are the steps to build a home in Pope County?

  1. Confirm that the parcel is outside city limits, identify its county zoning district on the official map, and ask the township whether it requires a separate permit.319
  1. Ask Land & Resource Management about the proposed use, lot area, district setbacks, shoreland or floodplain constraints, and any variance or conditional-use approval.1134
  1. Establish septic feasibility and obtain the required SSTS permit before installation or alteration.8 Arrange the required inspection with at least 24 hours’ notice before the system is covered.23
  1. Submit the county land-use application online, by mail or drop-off, or in person, and pay the 2026 fee with the application.166
  1. Confirm who administers any State Building Code permit and required inspections for the project.29
  1. Obtain the appropriate road authority’s permit before changing access to a public highway.30

What should you check before buying land in Pope County?

Start with jurisdiction: county controls govern unincorporated land, city requirements govern incorporated parcels, and township permits may be additional.23 Verify the official zoning map, allowed use, district-specific lot area and setbacks, shoreland status and whether the tract can be divided as planned.191331 If rental income matters, confirm the required Land Use Permit or Interim Use Permit for a vacation-home rental.18

Make septic feasibility a purchase contingency because only 12% of county soils are rated without severe limitations for a conventional drain field.26 Ask Land & Resource Management about the water-supply approval path because we could not confirm whether Pope County administers private-well permits.4 Verify floodplain status before closing: Pope County requires structures to follow applicable floodplain rules and uses site-specific elevation standards where other controls do not exist.32 Verify legal road access with the authority responsible for the adjoining road.30

Watch-outs

  • A county land-use permit does not by itself answer who enforces the Minnesota State Building Code in unincorporated Pope County; confirm code permits and inspections with Land & Resource Management before work begins.154
  • Starting work without county approval can trigger an after-the-fact application charge and a $500 working-without-a-permit penalty; paying does not guarantee approval.6
  • An owner-builder licensing exemption does not waive applicable permits, inspections or occupancy approvals.12

Sources

  1. Building Permit FAQ, quoted and re-checked
  2. Ordinances, quoted and re-checked
  3. Ordinances - Pope County, Minnesota, quoted and re-checked
  4. Pope County Land & Resource Management (popecountymn.gov)
  5. Subsurface Sewage Treatment Systems (SSTS) - Pope County, Minnesota, quoted and re-checked
  6. Pope County Land & Resource Management 2026 Fee Schedule, quoted and re-checked
  7. Glenwood Township: Glenwood Township (Pope County), quoted and re-checked
  8. Permits & Forms, quoted and re-checked
  9. Permits & Forms, quoted and re-checked
  10. Land Use Controls Ordinance, Section 10 - Performance Standards, quoted and re-checked
  11. Land Use Controls Ordinance, Section 6 - Non-Intensive Agriculture, quoted and re-checked
  12. revisor.mn.gov (Minnesota statewide rule), quoted and re-checked
  13. popecountymn.gov, quoted and re-checked
  14. Land Use Controls Ordinance, Section 6 - Non-Intensive Agriculture, quoted and re-checked
  15. 2025 Minnesota Statutes, section 326B.121 (Minnesota statewide rule), quoted and re-checked
  16. Permits & Forms, quoted and re-checked
  17. Glenwood Township: Pope County Subsurface Sewage Treatment System Ordinance (Pope County), quoted and re-checked
  18. Permits & Forms, quoted and re-checked
  19. Ordinances, quoted and re-checked
  20. Land Use Controls Ordinance, Section 6 - Non-Intensive Agriculture, quoted and re-checked
  21. Septic System FAQ, quoted and re-checked
  22. SSTS design (Minnesota statewide rule), quoted and re-checked
  23. Septic System FAQs - Pope County, Minnesota, quoted and re-checked
  24. Septic System FAQ, quoted and re-checked
  25. Land Use Controls Ordinance, Section 10 - Performance Standards, quoted and re-checked
  26. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  27. Land Use Controls Ordinance, Section 10 - Performance Standards, quoted and re-checked
  28. Tiny Houses and the 2020 Minnesota Residential Code (Minnesota statewide rule), quoted and re-checked
  29. 1300.0210 INSPECTIONS (Minnesota statewide rule), quoted and re-checked
  30. Minnesota Statutes, section 160.18: Access to roads; approaches (Minnesota statewide rule), quoted and re-checked
  31. Subdivisions, quoted and re-checked
  32. Building Permit FAQ, quoted and re-checked

Written October 12, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

Compared with neighboring counties

Like all 6 of its neighbors, Pope County requires a building permit for a home.

RulePope CountySwift CountyDouglas CountyStevens CountyGrant CountyTodd CountyStearns County
Building permitRequiredRequiredRequiredRequiredRequiredRequiredRequired
County zoningYesYesYesYesYesYesYes
Septic permitsCounty Land & Resource ManagementCounty Env. ServicesCounty Land & Resource ManagementCounty Env. ServicesCounty Land ManagementCounty Planning & ZoningCounty Env. Services

County locator

Pope County in Minnesota

55
County map
Pope County highlighted among the Minnesota counties · colored by Index score

How Pope County scores

Seclusion73100% ev.
Self-Sufficiency27100% ev.
Admin Boringness45100% ev.
Durability57100% ev.
Property Autonomy65100% ev.
Carry Cost66100% ev.

Evidence strength: 100%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$344kTypical home
0.8%Property tax
$5,298Land / acre
27.5"Annual rain
4.6% of yrsSevere drought
2.1 / yr (+2)Mid-century 100°F days
16.5 daysMid-century dry spell
1.5" (+9.1%)Mid-century 1-day rain
1.75×Wildfire change factor
100%Forward climate coverage
$1,804Home insurance / yr
3.6% / yrInsurance growth
0.36%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
7,077People within 30 min
648,322People within 2 hr
14,428Radius comparison (15 mi)
17People / sq mi
13.4%Federal land
96.4%Land at 15% slope or less
12%Soils rated "not limited" for septic (strict USDA rating)
46,907 acWorkable land screen
8.2%Wooded land
43.9 tonsBiomass / forest ac
42.6°FAvg temp

Scout Pope County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Pope County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Pope County

Inside a city, town or township here, that government usually sets zoning and may issue its own building permits; the county’s rules above cover land outside them.

Not yet researched: Bangor Township · Barsness Township · Ben Wade Township · Blue Mounds Township · Chippewa Falls Township · Cyrus · Farwell · Gilchrist Township · Glenwood · Grove Lake Township · Hoff Township · Lake Johanna Township · Langhei Township · Leven Township · Long Beach · Lowry · Minnewaska Township · New Prairie Township · Nora Township · Reno Township · Rolling Forks Township · Sedan · Starbuck · Villard · Walden Township · Westport · Westport Township · White Bear Lake Township

Answers from the rulebook for Pope County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Pope County rules

  • Building permitRequired

    Structures built or moved onto property and specified structural remodeling in unincorporated Pope County.

    • A permit is generally not needed for new siding, windows, shingles, or remodeling that does not affect the exterior footprint.
    • Some projects may require a variance or conditional-use permit.
    • City limits may have separate permitting authorities.
    “A permit is required for any structure built or moved onto a property, including but not limited to: houses, storage sheds, decks, patios, playhouses and garages.”
    One more reviewed finding on this topic
    • Required — Structures built, moved, altered, added to, or relocated in unincorporated Pope County.
      “A permit is required for any structure built or moved onto a property, including but not limited to: houses, storage sheds, decks, patios, playhouses and garages.”
  • County-wide zoningPresent (with conditions)

    Land use and development in Pope County outside incorporated cities, including zoning, structures, lots, shorelands, and subdivisions.

    • The Land Use Controls Ordinance applies to unincorporated areas; incorporated cities may administer their own permitting and land-use controls.
    “Pope County is regulated by the ordinances shown below. The Land Use Controls Ordinance was adopted to regulate the use and development of the unincorporated areas of Pope County.”
    One more reviewed finding on this topic
    • Present — Use and development of land in Pope County's unincorporated areas.
      “The Land Use Controls Ordinance was adopted to regulate the use and development of the unincorporated areas of Pope County.”
  • Local zoningVaries (with conditions)

    Aggregate local zoning and permitting across Pope County, including county unincorporated areas and incorporated municipalities.

    • Pope County administers the LUCO in unincorporated areas.
    • Pope County does not issue building permits within incorporated municipalities; applicants must contact the city directly.
    • Township officials may require additional or separate permitting.
    “Permits within the city limits of Glenwood, Long Beach, Starbuck, Villard, Westport, Lowry, Farwell, Cyrus and Sedan may be obtained from the corresponding city clerk.”
  • Zoning districtsPublished (with conditions)

    Pope County zoning districts and official zoning map for unincorporated areas.

    • The county publishes Land Use Controls Ordinance sections for zoning districts and provides an Official Zoning Map/web map viewer.
    • Actual parcel requirements depend on the applicable zoning district.
    “The Pope County Land Use Zones – Existing & Proposed web map viewer is provided for the public to further view Pope County’s Zoning Districts and the proposed revisions.”
    One more reviewed finding on this topic
    • Published — Pope County zoning districts and the official zoning map for unincorporated areas.
      “The Pope County Land Use Zones – Existing & Proposed web map viewer is provided for the public to further view Pope County’s Zoning Districts and the proposed revisions.”
  • Minimum lot sizeSpecified

    Farm residences, preserved farm homesteads, and new residences in the A-1 Non-Intensive Agriculture district.

    • The A-1 district table states a three-acre minimum for each listed residence category.
    • Other zoning districts may have different minimum lot-area standards.

    minimum lot area: >= 3 acres (Applies to the listed A-1 residence categories.)

    “Farm Residence 3 Acres Preserved Farm Homestead 3 Acres New Residence 3 Acres”
  • SetbacksSpecified

    Structures and sewage treatment systems in unincorporated Pope County, with parcel-specific setbacks determined by zoning district.

    • Structures and sewage treatment systems must meet setbacks from the ordinary high water level as indicated in the county setbacks and performance standards table.
    • Actual parcel setbacks depend on the zoning district.
    • Adjoining-lot setbacks may alter a public-water setback without a variance in the stated circumstances.
    “The actual setbacks for a parcel are dependent on zoning district as indicated in the Pope County Official Zoning Map.”
    2 more reviewed findings on this topic
    • Specified — Structures and sewage-treatment systems in unincorporated Pope County.
      “Structures and sewage treatment systems must meet the setbacks from the Ordinary High Water Level (OHWL) as indicated in Setbacks & Performance Standards table.”
    • Specified — Setbacks in the A-1 Non-Intensive Agriculture district.
      “A. Side Yard Setback: 10 Feet B. Unplatted cemetery: 50 Feet C. From centerline of public roadways classified as: Arterials 225 Feet Major Collectors 150 Feet Minor Collectors 125 Feet”
  • Living in an RVLimited

    Recreational-vehicle placement or occupancy in unincorporated Pope County.

    • RVs must be permitted through a Land Use Permit or Interim Use Permit.
    • Conditional or interim uses require approval after public hearing when authorized in the zoning district and subject to conditions.
    “Recreational Vehicles (RVs) must be permitted via: Land Use Permit; or Interim Use Permit.”
    One more reviewed finding on this topic
    • Limited — Recreational camping vehicles used as temporary living quarters in unincorporated Pope County.
      “One (1) RV per lot is permittable for intermittent recreational or guest use, provided the following criteria are met: For periods no longer than one hundred twenty (120) consecutive days.”
  • Camping on your landLimited

    Temporary camping in recreational camping vehicles in unincorporated Pope County.

    • The county rule is specifically for RVs used as temporary living quarters; it does not establish a general rule for tents or all forms of camping.
    • The RV duration, wastewater, sanitation, licensing, tire, setback, and permit conditions in Section 10.15 apply.

    ordinary RV stay: <= 120 consecutive days (intermittent recreational or guest use)

    “The purpose of this section is to provide standards for recreational camping vehicles (RV) utilized as temporary living quarters during recreational/vacation or other activities”
  • Accessory dwellingsAllowed (with conditions)

    Accessory dwelling units in the Non-Intensive Agriculture (A-1) zoning district.

    • One accessory dwelling unit is administratively permissible per lot or parcel.
    • Accessory dwelling units in excess of one per lot or parcel require a conditional use.
    • The claim is limited to the A-1 district.

    administratively permissible ADUs: 1 per lot or parcel (Additional ADUs require a conditional use.)

    “Accessory Dwelling Unit, limited to one administratively permittable per lot or parcel.”
  • Who permits septicCounty

    Administration of Pope County's subsurface sewage treatment system program.

    • The county program operates under the Pope County SSTS Ordinance and interfaces with state-licensed designers and inspectors.
    “Pope County Land & Resource Management administers the Subsurface Sewage Treatment System (SSTS) Ordinance”
    One more reviewed finding on this topic
    • County (with conditions) — Subsurface sewage treatment system permitting in unincorporated Pope County.
      “The Pope County Land and Resource Management Director will then review the application and pending approval, you will receive your permit in the mail.”
  • Septic permitRequired

    Installation or alteration of subsurface sewage treatment systems and specified commercial or vacation-rental systems.

    • A state-licensed designer submits the design for county review before the permit application is completed.
    • The county director reviews the application and approval is required before issuance.
    “Septic System Permits are required for: Installation or alteration of subsurface sewage treatment systems”
  • Septic inspectionRequired

    Permitted SSTS construction and compliance inspections in Pope County.

    • The owner or contractor must contact Pope County Land & Resource Management 24 hours before covering the system.
    • The inspection must be conducted by a state-licensed inspector.
    • A certificate of compliance is issued if the inspection passes.

    inspection notice: >= 24 hours (before covering the system)

    “It is required that the owner or contractor contact Pope County Land and Resource Management for a Septic System Inspection 24 hours prior to covering the system.”
    One more reviewed finding on this topic
    • Required — Permitted septic systems and qualifying property transfers in unincorporated Pope County.
      “It is required that the owner or contractor contact Pope County Land and Resource Management for a Septic System Inspection 24 hours prior to covering the system.”
  • Off-grid sanitationLimited

    Off-grid or non-water-carried sanitation, especially recreational camping areas and RV uses.

    • All development must comply with adopted sanitation standards.
    • Individual on-site sewage-treatment systems are not allowed for recreational campsites.
    • Self-contained camping units require a dump station in campgrounds.
    • Non-water-carried SSTS are within the county ordinance scope but remain subject to permits and standards.
    “The regulation of privy vaults and other non-water carried SSTS;”
  • Mandatory utility hookupConditional

    Water and sewer connections for recreational camping areas and RV uses regulated by the county ordinance.

    • Campsites designed to provide water hookup must also provide a hookup to a centralized sewage-treatment facility.
    • Uninhabited RVs stored on a parcel may not be hooked up to sewer and water.
    • The source does not establish a universal countywide public-water or sanitary-sewer connection requirement for all dwellings.
    “Campsites designed to provide water hook-up shall also provide hook-up to a centralized sewage treatment facility which meets the standards, criteria, rules or regulations of this ordinance.”
  • Subdividing landRegulated (with conditions)

    Subdivision of land in Pope County.

    • Applications must be reviewed and approved before recording.
    • Subdivisions not qualifying for administrative approval must follow the platting process in the Subdivision Controls Ordinance.
    “All subdivisions of land must apply (see the Subdivision Application below), be reviewed and approved by the Pope County Land & Resource Management Director prior to being recorded at the Pope County Recorder as per Section 10.25 of the Pope County Land Use Controls Ordinance (see the Minor Subdivision Flow Chart below).”
  • Building in a floodplainLimited

    Structures and development subject to floodplain controls in Pope County.

    • Structures must comply with applicable floodplain regulations.
    • Where controls do not exist, lowest-floor elevation or floodproofing follows the county FAQ's lake, river, and stream rules.
    • For rivers and streams, technical evaluations must be performed by a qualified engineer or hydrologist consistent with Minnesota Rules parts 6120.5000 to 6120.6200.
    • If multiple approaches are used, the highest flood-protection elevation controls.
    • Floodproofing must comply with Minnesota Rules part 6120.5900 Subp. 3(D).

    minimum elevation above highest known water level or ordinary high water level: >= 3 feet (lakes: whichever reference elevation is higher) · minimum elevation above highest known flood elevation: >= 3 feet (rivers and streams, subject to the alternative technical-evaluation rules)

    “Structures must be placed in accordance with any floodplain regulations applicable to the site. Where these controls do not exist, the elevation to which the lowest floor, including basement, is placed or flood-proofed must be determined as follows:”
  • Short-term rentalsLimited

    Vacation or short-term home rentals in unincorporated Pope County.

    • Vacation home rentals must use a Land Use Permit or Interim Use Permit.
    • Septic system permits are also required for operation of a vacation home rental.
    • The fee schedule lists a three-year vacation-home-rental permit and a renewal fee after three years.

    vacation-home-rental permit term: 3 years · vacation-home-rental permit fee: 125 USD · vacation-home-rental renewal fee: 75 USD (renewal after 3 years)

    “Vacation Home Rentals must be permitted via: Land Use Permit; or Interim Use Permit.”
  • Permit feesPublished

    2026 Pope County Land & Resource Management permit fees for unincorporated-county applications and related services.

    • The fee schedule is required by Pope County Land Use Controls Ordinance Section 11.3 and is approved by the County Board of Commissioners.
    • The 2026 schedule was adopted after a December 2, 2025 public hearing and is effective January 1, 2026.
    • Permit fees must be paid with the application.
    • Fees do not apply to the subordinate service district Clearwater Bay.
    • A $46 recording fee is added to conditional/interim use, variance, and rezoning or amendment applications where stated.
    • Minor subdivision fees do not include Certificate of Survey, PLSS, or recording fees where stated.
    • An after-the-fact application fee is 200% of the application fee plus the application fee and any real costs incurred by the department; it is additional to the application fee, does not automatically approve the application, and the owner is responsible when the permit was not applied for before construction.
    • A working-without-a-permit penalty is payable by the contractor, or by the property owner if the owner is the contractor.
    • Portable unattached structures under 144 square feet with no sleeping or residential quarters do not require a permit but must comply with impervious-surface and setback standards.
    • When multiple variance or conditional-use requests are reviewed simultaneously, subsequent applications beyond the first receive a 50% reduced rate.

    SSTS Type I, II or III installation, <= 2500 gal/day: 300 USD · SSTS Type I, II or III installation, > 2500 gal/day: 375 USD · SSTS Type IV, V, MSTS installation: 375 USD · Holding tank/component/partial system permit: 175 USD · SSTS operating permit, Type IV, V, MSTS, vacation home rental: 150 USD · SSTS operating permit renewal: 30 USD (Type IV, V, MSTS, vacation home rentals) · Commercial structure land-use permit: 325 USD (includes new communication towers and community solar gardens/facilities) · Commercial addition/expansion land-use permit: 125 USD · Communication tower modification permit: 125 USD · Residential structure land-use permit: 250 USD (includes guest homes, cottages, and detached garage with living space above) · Residential addition up to 600 sq ft: 150 USD · Accessory structure greater than 300 sq ft: 150 USD · Accessory structure greater than 144 sq ft and up to 300 sq ft: 100 USD (including W.O.A.S.) · Minimum land-use permit fee: 75 USD · Floodplain permit: 75 USD · Vacation home rental permit: 125 USD (3-year permit) · Vacation home rental renewal: 75 USD (renewal after 3 years) · Extractive use registration fee: 75 USD (annual fee for qualifying operations existing before July 2020 without a current conditional or interim use) · Shoreland alteration permit: 150 USD · Minor subdivision plat: 260 USD (does not include Certificate of Survey or PLSS recording fee) · Minor subdivision certificate of survey or PLSS description: 175 USD (does not include recording fee) · Preliminary standard subdivision plat application: 260 USD (plus $160 per lot) · Preliminary standard subdivision per-lot fee: per 160 USD (lot) · Final plat review: 210 USD (does not include recording fee) · Conditional/interim use permit: 500 USD (plus $46 recording fee) · Variance permit: 500 USD (plus $46 recording fee) · Rezoning or amendment: 500 USD (plus $46 recording fee) · Special meeting request: 500 USD (Planning Commission or Board of Adjustment) · Environmental assessment worksheet: 525 USD (plus hourly fee for service when the department is commissioned to complete the EAW) · Hourly fee for service: 100 USD (specialized consultant or contractor costs may also be charged) · After-the-fact application fee: 200% of application fee plus application fee USD (plus real costs incurred by the department) · Working without a permit penalty fee: 500 USD (contractor pays, unless property owner is the contractor) · Permit extension fee: 50 USD · Re-inspection fee: 50 USD

    “2026 Services and Fees Effective January 1, 2026 [...] LAND AND RESOURCES [...] Septic System (SSTS) Installation Permit - Type I, II or III (≤ 2500 gal/day) $300.00”
    One more reviewed finding on this topic
    • Published (with conditions) — Pope County Land & Resource Management permits and related applications.
      “4.) Residential Structure (includes Guest Homes, Cottages and Detached Garage with living space above) $250.00 None”
  • Permit processPublished (with conditions)

    Pope County land-use, septic, shoreland, RV, vacation-rental, solar, variance, and subdivision permit processes.

    • Applications may be submitted online, by mail or drop-off, or in person.
    • Fees must accompany the application.
    • Processing times vary and applicants are directed to contact the department.
    “How to Submit a Permit Application 1. Online Permit Application 2. Mail or Drop Off Paperwork 3. Apply in Person”

Minnesota rules that apply here

  • Owner-builder exemptionAvailable (with conditions)

    An owner of residential real estate who personally builds or improves residential real estate, as an exemption from the residential contractor licensing requirement.

    • The owner must occupy or intend to occupy the residential real estate for residential purposes, or retain ownership for rental purposes after completion.
    • The exemption does not apply when the owner constructs or improves residential real estate for resale or speculation.
    • An owner is presumed to be building or improving for speculation if the owner constructs or improves more than one property within any 24-month period, unless the properties will be retained for rental purposes.
    • This is a contractor-licensing exemption and does not waive applicable building permits, inspections, or certificates of occupancy.

    speculation presumption threshold: > 1 additional property within 24 months (The presumption does not apply if the properties will be retained by the owner for rental purposes.)

    “The license requirement does not apply to: [...] an owner of residential real estate who builds or improves residential real estate”
  • Building code adoptedAdopted (with conditions)

    Construction, reconstruction, alteration, repair, and use of buildings and other structures of the type governed by the Minnesota State Building Code throughout Minnesota.

    • The State Building Code supersedes the building code of any municipality.
    • The State Building Code does not apply to agricultural buildings except for the state inspections and rulemaking identified in Minnesota Statutes section 326B.121, subdivision 1, paragraph (c), clause (1), and the structural-support requirement for translucent panels or other skylights without raised curbs in clause (2).
    • The 2020 Minnesota State Building Code is effective March 31, 2020, except the Minnesota Mechanical Fuel Gas Code, which is effective April 6, 2020.
    • Municipal enforcement generally requires adoption by local ordinance, subject to statutory requirements for certain municipalities and statutory enforcement responsibilities where no adoption ordinance is in effect.
    • The 2024 Minnesota Commercial Energy Code is effective January 5, 2024.
    • Requirements for adult changing stations are effective August 15, 2025, and requirements for window-cleaning safety features are effective November 7, 2025, according to the Department of Labor and Industry update page.

    2020 Minnesota State Building Code effective date: 2020-03-31 (Minnesota Mechanical Fuel Gas Code effective 2020-04-06) · 2024 Minnesota Commercial Energy Code effective date: 2024-01-05 · Adult changing station supplement effective date: 2025-08-15 · Window-cleaning safety feature supplement effective date: 2025-11-07

    “(a) The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, and use of buildings and other structures of the type governed by the code.”
  • InspectionsRequired

    Construction or work for which a Minnesota State Building Code permit is required.

    • The work must remain accessible and exposed until approved.
    • The permit applicant must cause the work to remain accessible and exposed for inspection.
    • The building official identifies required inspections; the permit holder must maintain the inspection record card until final approval.
    • Work may not proceed beyond each successive inspection point without building-official approval; noncomplying portions must be corrected and may not be covered or concealed until authorized.
    “Construction or work for which a permit is required is subject to inspection by the building official”
  • Certificate of occupancyLimited

    Use or occupancy of buildings and structures, and changes in existing occupancy classification, in Minnesota jurisdictions administering and enforcing the State Building Code.

    • A building or structure may not be used or occupied, and an existing occupancy classification may not be changed, until the building official issues a certificate of occupancy under Minnesota Rules part 1300.0220.
    • The rule applies through the building official and therefore depends on the relevant jurisdiction administering and enforcing the State Building Code.
    • Issuance of a certificate of occupancy is not approval of a violation of the code or other municipal ordinances; a certificate purporting to authorize violation or cancellation of those requirements is invalid.
    • A municipality has the option of requiring certificates of occupancy for U occupancies constructed under the International Building Code, accessory structures constructed under the International Residential Code, and used manufactured homes moved into or within a jurisdiction.
    • Legal occupancy of a structure existing on the date of code adoption may continue without change.
    • A temporary certificate may be issued before all permitted work is complete if the occupied portion can be occupied safely; the building official sets its validity period.

    optional certificate category: U occupancies constructed under the International Building Code (municipality has the option of requiring a certificate) · optional certificate category: accessory structures constructed under the International Residential Code (municipality has the option of requiring a certificate) · optional certificate category: used manufactured homes moved into or within a jurisdiction (municipality has the option of requiring a certificate)

    “No building or structure shall be used or occupied, and no change in the existing occupancy classification of a building, structure, or portion of a building or structure shall be made until the building official has issued a certificate of occupancy for the building or structure under this part.”
  • Tiny homesLimited

    Construction and residential use of tiny houses statewide, subject to the Minnesota State Building Code and applicable municipal zoning ordinances.

    • The Minnesota State Building Code applies statewide to construction of buildings, including tiny houses.
    • Municipal zoning ordinances vary by municipality and regulate land use, location, height, width, foundation type, number of stories, and building size.
    • The jurisdiction must be consulted for local zoning specifics.
    • Tiny houses used as dwelling units must comply with the Minnesota Residential Code unless otherwise stated in Appendix Q.
    • A tiny house is a dwelling of 400 square feet or less in floor area, excluding lofts.
    • Applicable requirements include light, ventilation, heating, minimum room sizes, ceiling heights, sanitation, toilet, bath and shower spaces, emergency escape and rescue openings, means of egress, smoke alarms, and carbon monoxide alarms.

    maximum tiny-house floor area: <= 400 square feet (lofts excluded) · minimum habitable-space and hallway ceiling height: >= 6.67 feet (6 feet 8 inches) · minimum bathroom, toilet-room, and kitchen ceiling height: >= 6.33 feet (6 feet 4 inches)

    “The Minnesota State Building Code is the standard of construction that applies statewide for the construction of buildings (MS 326B.121) including tiny houses.”
  • Manufactured homesLimited

    New manufactured homes installed for occupancy statewide in Minnesota

    • Inspection is required under Federal Installation Standards Programs, CFR 3285 and 3286.
    • Manufactured-home alterations require documentation submitted for review to the Department of Labor and Industry or the local authority having jurisdiction before work begins.
    • Local building officials and local code enforcement may apply depending on the municipality.
    “All new manufactured homes installed in Minnesota for occupancy are required to be inspected according to the Federal Installation Standards Programs, Code of Federal Regulations (CFR) 3285 and 3286.”
  • Well permitLimited

    Construction of water-supply, dewatering, and environmental wells in Minnesota.

    • A well notification and applicable filing fee are generally required before construction; the statute describes notification rather than a general construction-permit requirement for these wells.
    • A drive-point water-supply well personally constructed by an individual on owned or leased property for farming, agricultural purposes, or the individual's place of abode must be reported within ten days after completion, and no notification fee may be charged.
    • The notification requirement preempts local permits and notifications unless the commissioner has delegated permitting or notification authority under section 103I.111.
    • If operation of the well requires a Minnesota Department of Natural Resources appropriation permit, specified information must be submitted to the commissioner of natural resources and construction may begin after preliminary approval.
    • A well that is not in use must be sealed or have a maintenance permit, subject to the statutory environmental/dewatering-well exception.

    drive-point well notification deadline: 10 days after completion (personally constructed by an individual on owned or leased property for farming, agricultural purposes, or the individual's place of abode) · unused well status: sealed or maintenance permit (environmental or dewatering wells not sealed by 14 months after completion require an annually renewed maintenance permit)

    “Except as provided in paragraph (d), a person may not construct a water-supply, dewatering, or environmental well until a notification of the proposed well on a form prescribed by the commissioner is filed with the commissioner with the filing fee in section 103I.208, and, when applicable, the person has met the requirements of paragraph (e).”
  • Agricultural exemptionAvailable (with conditions)

    Agricultural buildings statewide that meet the definition in Minnesota Statutes § 326B.103, subdivision 3.

    • The structure must be on agricultural land as determined by the governing assessor for the municipality or county under section 273.13, subdivision 23.
    • The structure must be designed, constructed, and used to house farm implements, livestock, or agricultural products under section 273.13, subdivision 23.
    • The building must be used by the owner, lessee, and sublessee and members of their immediate families, employees, and persons engaged in pickup or delivery of agricultural products.
    • The State Building Code does not apply except with respect to state inspections required or rulemaking authorized by sections 103F.141, 216C.19, subdivision 9, and 326B.36.
    • Translucent panels or other skylights without raised curbs must be supported to have equivalent load-bearing capacity as the surrounding roof.
    “The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, and use of buildings and other structures of the type governed by the code. [...] (c) The State Building Code does not apply to agricultural buildings except: (1) with respect to state inspections required or rulemaking authorized by sections 103F.141; 216C.19, subdivision 9; and 326B.36; and (2) translucent panels or other skylights without raised curbs shall be supported to have equivalent load-bearing capacity as the surrounding roof.”
  • Driveway accessRequired

    Direct driveway connections to or from Minnesota state highways and work within MnDOT right-of-way.

    • A permit is required before constructing or modifying a direct driveway connection to or from a state highway.
    • The requirement covers agricultural, single-family residential, commercial, industrial, recreational, public, institutional, natural-resource, and multiple-family residential uses, and privately owned streets.
    • A new driveway, including a temporary driveway, requires a permit.
    • Modifying an existing driveway or changing its use or major traffic pattern may require a new permit.
    • The application should be submitted by the property owner; an agent, tenant, contractor, or developer must include written authorization from the owner.
    • This claim does not establish driveway-permit requirements for roads outside MnDOT jurisdiction.
    “A MnDOT Access Driveway Permit is required before a direct driveway connection to or from a state highway is constructed or modified.”
    2 more reviewed findings on this topic
    • Limited — Additional ingress to or egress from a public highway for property with a right of direct private access.
      “The owner or occupant of property abutting upon a public highway, having a right of direct private access thereto, may provide such other or additional means of ingress from and egress to the highway as will facilitate the efficient use of the property for a particular lawful purpose, subject to reasonable regulation by and permit from the road authority as is necessary to prevent interference with the construction, maintenance and safe use of the highway and its appurtenances and the public use thereof.”
    • Required — Changes in access to or from a MnDOT right-of-way, including driveway or other access points to a trunk highway, and changes in property use affecting such access.
      “An Access / Driveway Permit is required whenever there is a request for change in access to or from a Minnesota Department of Transportation (MnDOT) right-of-way or a change in use of the property.”
  • county zoning authorityLimited

    County planning and zoning authority over unincorporated areas of Minnesota.

    • The authority applies to a county having less than 300,000 population according to the 1950 federal census.
    • The statute authorizes county planning and zoning activities generally within the qualifying counties; it does not identify a separate unincorporated-area limitation in this section.
    • Except as otherwise provided, a county regardless of population must not enact, amend, or enforce an ordinance eliminating or terminating a lawful use by amortization.
    • The amortization prohibition does not apply to adults-only bookstores, adults-only theaters, or similar adults-only businesses as defined by ordinance.
    • The amortization subdivision does not prohibit nuisance-prevention or nuisance-abatement enforcement or elimination of a use determined to be a public nuisance without payment of compensation.

    population threshold: < 300000 persons (According to the 1950 federal census)

    “having less than 300,000 population according to the 1950 federal census is authorized to carry on county planning and zoning activities.”
  • county building authorityGeneral

    Minnesota counties may administer and enforce the State Building Code within their jurisdiction by ordinance; this includes a county's authority over residential construction in unincorporated county territory, subject to the statutory limits on code application and local provisions.

    • The statutory authorization is to administer and enforce the State Building Code, rather than a county-specific building code.
    • A county that is not already required by Minnesota Statutes § 326B.121, subdivision 2(a), to administer and enforce the code may elect to do so by ordinance.
    • The State Building Code applies statewide to construction, reconstruction, alteration, repair, and use of buildings and structures governed by the code.
    • The State Building Code does not apply to agricultural buildings except for state inspections or rulemaking authorized by Minnesota Statutes §§ 103F.141, 216C.19, subdivision 9, and 326B.36, and except that translucent panels or other skylights without raised curbs must have equivalent load-bearing capacity as the surrounding roof.
    • A municipality may not require building-code provisions regulating structural components or systems that differ from the State Building Code; with state building official approval, it may adopt a more restrictive ordinance where geological conditions warrant it.
    • A municipality may enforce the State Building Code through lawful means, including contracts with other municipalities or qualified individuals; building-permit fees may be retained or remitted to reimburse them.
    “If a municipality is not required by paragraph (a) to administer and enforce the State Building Code, the municipality may choose to administer and enforce the State Building Code within its jurisdiction by adopting the code by ordinance.”

Set by your town or city, not the county

In Minnesota, zoning is adopted by each town or city, so Pope County has no county-wide answer on these. Find your town or city in the list of places on this page, or call its clerk or zoning administrator.

  • Minimum dwelling size
  • Lot coverage
  • Building height

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Water rights & wells in Pope County

Whether a new home can legally get its own water here — the sub-state groundwater regime, from Minnesota’s water agency.

Actively managed

This basin is under active state management — new water use is scrutinized, though a domestic well is usually still allowed.

Household wellExempt up to a limit

Regulated-riparian: appropriation permits apply above 10,000 gpd / 1 million gal/yr. Domestic use under those thresholds is exempt; a well-construction notification to the MN Dept. of Health is still required. Household use is far below the cap.

Limit: <=10,000 gpd and <=1,000,000 gal/yr serving <=25 persons

Minnesota DNR — Do I need a water permit? ↗
  • Bonanza Valley Groundwater Management Arealocalized of county

    DNR-designated GWMA (2016) where irrigation-driven groundwater use may be unsustainable; new/expanded appropriation permits get heightened review. Domestic wells exempt.

    Minnesota DNR — Bonanza Valley GWMA ↗

Regulated-riparian state (large uses permitted). Groundwater rules change and basin boundaries follow the aquifer, not the county line — confirm current well and appropriation rules with the Minnesota state water agency before you buy or drill.Groundwater governance as of Jul 2026, cited to each administering agency.

Living off-grid in Pope County, Minnesota

Is Pope County a good place to live off-grid or homestead?

Pope County scores 55/100 on the Bolthole Index, a solid county profile. Its strengths: sparse surroundings — about 7,077 people within a 30-minute drive and manageable long-term carry cost. Watch-outs: workable self-sufficiency basics (27.5″/yr rainfall).

Do you need a building permit in Pope County, Minnesota?

Pope County generally requires a residential building permit, and it enforces county zoning. Onsite septic is permitted by Pope County Land & Resource Management. Owner-builders may act as their own contractor to build their home. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

Can you live in an RV or tiny home on your land in Pope County?

Living in an RV on your own land in Pope County is limited to specific cases: Recreational-vehicle placement or occupancy in unincorporated Pope County. RVs must be permitted through a Land Use Permit or Interim Use Permit. Conditional or interim uses require approval after public hearing when authorized in the zoning district and subject to conditions. A tiny home is limited to specific cases. Confirm with the county before relying on it.

How much does land cost in Pope County, Minnesota?

Land in Pope County runs about $5,298 per acre, based on the latest county data.

What is the water situation in Pope County?

Pope County gets about 27.5" of rain a year, with severe drought in roughly 4.6% of years. On water rights, Pope County lies in the Bonanza Valley Groundwater Management Area — DNR-designated GWMA (2016) where irrigation-driven groundwater use may be unsustainable; new/expanded appropriation permits get heightened review. Domestic wells exempt..

How remote is Pope County?

A representative private-land location has about 7,077 people within a 30-minute drive and 648,322 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

How Pope compares in Minnesota

Compare side-by-side →See all 87 Minnesota counties ranked →