Zoning, building permits and septic rules in Farmington, Missouri
Farmington is a city in St. Francois County, Missouri. Farmington adopts its own zoning, so inside its limits Farmington’s rules apply, not the county’s. 5 rules below are quoted from official sources and independently re-checked, most recently on October 23, 2026. Rules for unincorporated land are on the St. Francois County page.
Answers from the rulebook for Farmington
Farmington’s own rules
Building code adoptedAdopted (with conditions)
Building construction inside Farmington city limits
Adopted as the International Building Code, 2015 edition, including appendix chapters appendix b, appendix e, appendix f, appendix h, appendix i, with city amendments in section 500.020.
Amendment sets section 1809.5.1 frost line at thirty (30) inches; section 105.2 is amended by deleting item #2 (deleted text not quoted on the page).
Amendment history lists Ord. No. 15-11, 12-18-2017; no adoption effective date is stated, so effective_at is null.
frost line depth: 30 inches
“section 1809.5.1: the frost line of the locality shall be thirty (30) inches.”
Local zoningPresent (with conditions)
Land inside Farmington city limits; the city's own Chapter 405 Zoning Regulations apply there
Zoning is administered under the city's Chapter 405 as listed in the city code index; the zoning district map and use table were not opened.
We looked and could not find an official answer yet. Silence is not permission; ask Farmington or St. Francois County directly.
Owner-builder exemption — Owner-builder permit exemption inside Farmington city limits
Inspections — Building inspections inside Farmington city limits
Certificate of occupancy — Certificate of occupancy for new buildings inside Farmington city limits
Minimum dwelling size — Minimum dwelling floor area inside Farmington city limits
Camping on your land — Temporary camping on private land inside Farmington city limits
13 more unanswered
Tiny homes
Accessory dwellings
Who permits septic
Septic permit
Septic inspection
Off-grid sanitation
Well permit
Mandatory utility hookup
Agricultural exemption
Driveway access
Short-term rentals
Permit fees
Permit process
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Farmington publishes no rule on the point, not that none exists. St. Francois County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Farmington means bringing your own water and power. The kit we’d start with: