We could not confirm whether unincorporated Clarke County, Mississippi requires a residential building permit or zoning approval12. Inside Quitman, city zoning sets district-specific lot sizes and setbacks, while septic permits throughout Clarke County remain with the Mississippi State Department of Health345.
At a glance
- Building permit
- Not confirmed; no building or codes department on the county's own site16
- Zoning
- County zoning unconfirmed; Quitman has city zoning standards234
- Septic permits
- Required through Mississippi State Dept. of Health On-Site Wastewater789
- Owner-builder
- Own-residence work is exempt from residential-builder licensing, not permits10
- Septic soils
- Only 9.9% of soil has no severe limit for a conventional drain field11
- Well permit
- Required for wells with a 6-inch or larger surface casing12
- Septic application fee
- $197.50 for Notice of Intent plus Final Approval13
- Property tax
- 0.5% effective rate; about $570 per year median bill1415
Who to call
Septic permits
Mississippi State Department of Health, Division of On-Site Wastewater
Individual on-site wastewater (septic) system permits, design review and inspection statewide. Clarke County falls within MSDH's Central Region for this program; most homeowners apply and get help through the statewide Wastewater Call Center rather than an in-person Clarke County office.
570 East Woodrow Wilson Drive, Jackson, MS 39216
Also useful
Clarke County Board of Supervisors
Clarke County's governing body; Clarke County has no separate building, planning or zoning department listed on the county's site, so this is the office to ask about any building, zoning or land-use question for unincorporated land
100 East Church St, Quitman, MS 39355
Also useful
Clarke County Chancery Clerk's Office
Records deeds, mortgages and other land documents for property in Clarke County, and serves as clerk of the Chancery Court
101 S Archusa Ave, Quitman, MS 39355
Roads & driveways
Maintenance, upkeep and improvements to all county roads and bridges outside municipalities, including drainage, road surface and right-of-way work
Contact details are copied from each office’s official page and were checked against it on October 7, 2026.
Off-grid gear
Going off-grid in Clarke County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Clarke County, Mississippi?
We could not confirm whether unincorporated Clarke County requires a residential building permit or conducts general residential inspections1. Mississippi requires counties and municipalities to enact uniform building codes unless they opted out before November 30, 2014, but no county-specific record establishes which path Clarke County took16. The state fire code covers specified buildings such as state-owned and public-assembly buildings, not ordinary private homes as a general category17. An owner may build or act as general contractor on the owner's own residence without a residential-builder license, but that licensing exemption does not waive a building permit, septic permit, zoning approval or utility approval that otherwise applies10. Agricultural buildings likewise have a state licensing exemption, not a blanket building-permit exemption18. Call the Clarke County Board of Supervisors at 601-776-5873 before starting work6.
Who issues building permits in Clarke County, and how do you reach them?
For unincorporated land, start with the Clarke County Board of Supervisors because we could not confirm a county building-permit office or published building-permit process16. Reach the Board at 601-776-5873 or admin@clarkecountyms.gov, at 100 East Church St, Quitman, MS 393556. Inside Quitman, ask the city about any building permit and zoning approval because Quitman's ordinance sets city zoning standards; those city standards do not govern unincorporated Clarke County34. Septic permits do not move to the city: the Mississippi State Department of Health's Division of On-Site Wastewater handles onsite wastewater applications throughout Clarke County through its Central Region59. The Clarke County Road Department maintains county roads and bridges; ask it about access from a county road because no county driveway-permit rule was confirmed19.
Does Clarke County have zoning?
Whether unincorporated Clarke County has adopted zoning could not be confirmed2. Do not treat that gap as proof that an unincorporated parcel has no zoning approval, setbacks, minimum lot size or minimum home-size rule; ask the Clarke County Board of Supervisors before buying or building26. Quitman is different: its city zoning ordinance sets lot sizes and setbacks by district, so a Quitman parcel must be checked against its city district rather than the unknown countywide status34. For example, the ordinance lists a 1-acre minimum lot in the A-1 district and 10,000 square feet in R-1, with different standards in other districts3. A-1 setbacks are 35 feet in front, 15 feet at the side and 30 feet at the rear; other districts differ4.
How do septic permits work in Clarke County?
Before constructing or placing a residence, building or facility that may need an onsite wastewater system in Clarke County, file the Mississippi State Department of Health application and supporting documents; the published process allows online forms and sends the paperwork after payment and the property visit2021. The septic permit is required to install an onsite wastewater system and to obtain a permanent water meter when public sewer is unavailable2223. Applications within 1 mile of a sewer line are referred for sewer connection, and MSDH needs a rejection letter from the sewer provider before continuing24. The published Notice of Intent plus Final Approval fee is $197.50, subject to change and an online processing fee13. Systems requiring Final Approval must be evaluated, and mechanical systems must be operated to check compliance25. Only 9.9% of county soil is rated without severe limits for a conventional drain field, so make the site evaluation an early purchase contingency11.
Can you live in an RV or tiny home on your land in Clarke County?
We could not confirm Clarke County rules for RV occupancy, temporary camping, tiny homes, minimum dwelling size or setbacks on unincorporated land2. Ask the Clarke County Board of Supervisors about zoning approval, placement, dimensions and occupancy before buying or moving onto an unincorporated parcel6. Inside Quitman, city zoning sets district-specific lot sizes and setbacks, but the reviewed ordinance does not answer RV or tiny-home occupancy34. Septic authority stays with MSDH countywide: an RV or tiny home using onsite wastewater must follow the state septic-permit process, and MSDH also reviews wastewater designs for RV campgrounds and manufactured-home developments526. Mississippi treats gray water as wastewater and requires it to discharge to a central sewer or septic system, not onto the ground, into a ditch or into a body of water27.
Building a home in Clarke County: the steps, in order
- For unincorporated land, call the Clarke County Board of Supervisors at 601-776-5873 to confirm the building permit and zoning approval required for the parcel; inside Quitman, check the city's zoning district and dimensional standards61234.
- Make the purchase contingent on a wastewater site evaluation because only 9.9% of county soil is rated without severe limits for a conventional drain field11.
- File the MSDH septic application and supporting documents, then pay through the issued payment link21.
- If a sewer line is within 1 mile, resolve the sewer referral before expecting MSDH to continue the septic application24.
- Complete the required MSDH evaluation and approval path before using the onsite wastewater system or obtaining the permanent water meter2523.
- Obtain a state driveway permit before adding or altering access onto a state highway28.
- If acting as your own general contractor, document the licensing exemption without treating it as a building-permit, zoning-approval or septic-permit waiver10.
What to check before you buy land in Clarke County
Soils: only 9.9% of Clarke County's soil is free of severe limitations for a conventional septic drain field, so make MSDH's site evaluation a purchase contingency11. Jurisdiction: confirm whether the parcel is in unincorporated Clarke County or Quitman, because Quitman applies city lot-size and setback standards while the county's building-permit and zoning status remains unconfirmed3412. Water: a well with a surface casing of 6 inches or more needs a state groundwater-withdrawal permit, with some exclusions12. Access: a new or altered driveway onto a state highway needs a state driveway permit28. County-road access requirements were not confirmed, so ask the Clarke County Road Department before cutting a driveway19. Taxes: Clarke County's effective property tax rate is about 0.5%, with a median bill near $570 a year1415.
Watch-outs
- We could not confirm whether unincorporated Clarke County requires a building permit or zoning approval; call the Board of Supervisors at 601-776-5873 before you assume either way612.
- Quitman's city lot-size and setback standards do not answer the rules for unincorporated Clarke County; identify the parcel's jurisdiction before relying on them34.
- Only 9.9% of Clarke County's soil is free of severe limitations for a conventional septic drain field; get a site evaluation from the state On-Site Wastewater program before you commit to a parcel119.
- A septic application within 1 mile of a sewer line is referred for sewer connection, and MSDH needs a rejection letter from the sewer provider before proceeding24.
- Mississippi does not allow gray water to drain onto the ground, into a ditch or into a body of water; route all wastewater to sewer or septic27.
Sources
- (2026 county census)
- (2026 county census)
- Zoning Ordinance, City of Quitman, Mississippi, quoted and re-checked
- Zoning Ordinance, City of Quitman, Mississippi, quoted and re-checked
- On-Site Wastewater - Mississippi State Department of Health, quoted and re-checked
- Clarke County Board of Supervisors (clarkecountyms.gov)
- WasteWater FAQs and Answers, quoted and re-checked
- On-Site Wastewater - Mississippi State Department of Health, quoted and re-checked
- Mississippi State Department of Health, Division of On-Site Wastewater (msdh.ms.gov)
- Residential Laws and Rules Revised 2022, quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Guidelines for Securing the Services of a Water Well Driller (Mississippi statewide rule), quoted and re-checked
- WasteWater application fees and process, quoted and re-checked
- Effective property tax rate: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
- Mississippi Uniform Building Codes, quoted and re-checked
- Title 19: Department of Insurance, Part 7: State Fire Marshal, quoted and re-checked
- Residential Laws and Rules Revised 2022, quoted and re-checked
- Clarke County Road Department (clarkecountyms.gov)
- On-Site Wastewater, quoted and re-checked
- On-Site Wastewater, quoted and re-checked
- WasteWater, quoted and re-checked
- WasteWater Application FAQs, quoted and re-checked
- apps.msdh.ms.gov, quoted and re-checked
- On-Site Wastewater, quoted and re-checked
- On-Site Wastewater - Mississippi State Department of Health, quoted and re-checked
- WasteWater FAQs and Answers, quoted and re-checked
- Mississippi Access Management Guide (Mississippi statewide rule), quoted and re-checked
Written October 7, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.